Download NTC 242 LEARNING TEAM ACME MANUFACTURING Problem

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts
no text concepts found
Transcript
NTC 242
LEARNING TEAM ACME MANUFACTURING
NTC 242
Problem Statement




Learning Team A has been requested to consult on a new Wide Area Network for
Acme Manufacturing.
The new network should include all new equipment
The company has multiple locations both domestic and international.
Must support weekly meetings at headquarters with multiple remote locations in
attendance.
NTC 242
Network Design



Acme has six sites in six distinct geographic locations.
Two Locations in Atlanta, Georgia, One in each of the following Phoenix,
New York, Chicago and one international location in China.
From a topology standpoint a Star Network is suggested with the Atlanta,
Georgia Head Quarters acting as the central hub.
NTC 242
Network Design
NTC 242
Network Equipment



It is suggested that within the local area Ethernet technologies are utilized.
To connect from China to Head Quarters a satellite connection is suggested due to the
geographic distance involved.
From domestic locations, leased T3 lines are recommended to maintain connectivity
between location.
NTC 242
VLAN



VLAN will be used to segregate the Network.
VLAN will offer superior security
VLAN will allow for the sharing of network resources over large geographic
networks.