Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Novel load forecasting technique for three timehorizons in electric power system Swasti R. Khuntia Challenge the future 1 Thesis Factsheet • Title of thesis: Novel load forecasting technique for three time-horizons in electric power system • Name of student: Swasti R. Khuntia • Start Date / End Date: 10/04/2014 – 09/04/2018 (Expected) • Departments involved: Electrical Sustainable Energy (formal) and Applied Probability (informal) • Supervisor(s): Dr. –Ing. Jose L. Rueda • Promotor(s): Prof. Mart A. M. M. van der Meijden • Companies and funding agencies involved: EU FP7 Project comprising of 20 partners (8 industries and 12 universities) • Associated Project Title: GARPUR (Generally Accepted Reliability Principle with Uncertainty modelling and through probabilistic Risk assessment) [www.garpur-project.eu] Challenge the future 2 Thesis content • Motivation • European power system reliability management surviving on ‘N1’ criterion • Time to upgrade the reliability criterion • Demand-side uncertainty • Intermittent energy sources • Part of the project involved, it aims at socio-economic benefits • Research question • “Designing, developing, assessing, and evaluating new reliability criteria” • My contribution: Load forecast model for three time-horizons using novel data mining technique Challenge the future 3 Thesis content • Leader: T5.2 and T6.2 • Contributor: • T2.3, T2.4 • T4.2, T4.3 • T5.1, T5.3, T5.4 • T6.3, T6.4 • T7.2, T7.3 • T9.1 Challenge the future 4 Thesis challenge • • • • Difficulty in modeling for three time-horizons Data uncertainty Upgrading the existing reliability criterion Driving factor: Project implementation in pan-European level in next decade Challenge the future 5 Methodology • Literature study on “Understanding the three time-horizons” in electrical transmission system • Literature study on “Asset management in electrical transmission system” • Literature study on “Existing methodology used in participating TSOs” [continuing] • Power flow study on Bayesian Network • One of the most efficient probabilistic graphical models to represent uncertainty and inferences thereof • Nothing much done in load forecast area for three time-horizons • Trying to assess the usability and planning to design a “hybrid” model Challenge the future 6 Project Plan Literature Test-case study WP5, 6 Implementation/Validation Writing Thesis 04/2014 2015 2016 2017 04/2018 Challenge the future 7 Challenge the future 8