Download HKIA/ARB Professional Assessment Sample Questions

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Document related concepts
no text concepts found
Transcript
Sample Questions for Paper 2 Building Contracts, Professional Practice,
Professional Conduct, Conditions of Agreement & Scale of Charges
14.
The Contract Conditions cannot be altered except by
A.
B.
C.
D.
instructions issued by the Architect.
the Employer unilaterally serving a written notice to the Contractor.
a mutual agreement between the Employer and the Contractor
through the signing of a supplementary agreement.
an Arbitrator appointed jointly by the Employer and the Contractor.
Ans.
:
C
15.
Upon issuing the Final Certificate, which of the following will take effect?
(1)
(2)
(3)
(4)
The Contractor is no longer liable for any defects.
The Contractor is still liable for defects under warranty.
The Extension of Time application has been concluded.
The additional payment for direct loss and/or expense has been
settled.
A.
B.
C.
D.
(1) and (2) only
(3) and (4) only
(1), (3) and (4) only
(2), (3) and (4) only
Ans.
:
D
16.
The total construction cost on which the percentage fees are based shall
exclude
A.
B.
Ans.
C.
D.
work done by specialist sub-contractors.
work carried out under separate building contract but designed by
a consultant whose input the Architect is responsible for
coordinating.
materials supplied directly by the Client.
specialist sub-contractor’s design fee.
:
D
Sample question 2012 – Paper 2 Building Contracts, Professional Practice, Professional
Conduct, Conditions of Agreement & Scale of Charges