Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
idibri.com | idibri.uk The Church of the Resurrection constructed a 3,200-seat interim facility that can be converted into a health and wellness center in the future when a larger worship center is constructed to serve their rapidly-growing congregation. Since the gymnasium shape of the interim space had inherent acoustical problems for speech intelligibility, Idibri worked with the architect on a permanent stadium seating solution, which arranges people in seating tiers at the rear of the room, allowing members of the congregation to become human acoustic elements. This seating layout also serves the purpose of creating a sense of visual community. Audio Lighting Theatre Consulting Video United Methodist Church of the Resurrection Connie Stella, Creative Director United Methodist Church of the Resurrection 913.897.0120 New Construction HOK 2004 3,000 Technology is key to the design because the campus requires a high level of interconnectivity and flexibility. Because of the high performance element of services, the design includes a left-right stereo imaging sound system. The system will be able to support concerts and other special events. In addition, a portion of the system has dual functionality by providing in-fill sound for the organ that is being relocated from the current sanctuary. Imagemagnification (IMAG) video is designed to use as much existing equipment as possible. The theatrical lighting design will support IMAG video production and drama.