* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download GR-390 GR-392
Survey
Document related concepts
Audio power wikipedia , lookup
History of electric power transmission wikipedia , lookup
Immunity-aware programming wikipedia , lookup
Power engineering wikipedia , lookup
Electric battery wikipedia , lookup
Voltage optimisation wikipedia , lookup
Uninterruptible power supply wikipedia , lookup
Electrification wikipedia , lookup
Rechargeable battery wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Power over Ethernet wikipedia , lookup
Power supply wikipedia , lookup
Mains electricity wikipedia , lookup
Transcript
Connecting the terminal block Connecting to the mains power supply 220-240V AC/50-60Hz L GR-390 GR-392 Female terminal block Double Easy LEDs Light Maintained Emergency Luminaires Í - Blue L - Brown L1 - Black (for maintained) Figure 2: Connecting to the mains power supply Base GR-390 OPERATION VOLTAGE CONSUMPTION BATTERIES (Ni-Cd) Luminaire GR-392 Installing the luminaire 15 VA 15 VA 3,6V / 1,5Ah 3,6V / 3Ah 24 hours 90 minutes 180 minutes INDICATIONS - CONTROLS Charge indication LED, TEST protection BATTERY PROTECTION Overcharge and full discharge protection LIGHT SOURCE Side view on ceiling attached Front view on ceiling attached 2x16 LEDs LIGHT OUTPUT DEGREES OF COVER PROTECTION 80 lm(230V AC), 100lm(emergency) PRODUCED IN ACCORDANCE WITH EN 60598-1, EN 60598-2-22 IP 40 Power supply Cable o OPERATION TEMPERATURE RANGE 0 to 40 C HUMIDITY Up to 95 % relative humidity DIMENSIONS WEIGHT Figure 1 220-240V AC/50-60Hz CHARGING TIME DURATION Maintained 350 x 134 x 60 mm (CRV 362 x 134 x 86) 850 gr GUARANTEE Downside view wall mounted 920 gr Front view wall mounted 3 years Double Easy Light/CRV luminaires Double Easy Light luminaires Description All luminaires have a round supporting base for attachment and one outgoing cable to connect the luminaires to the mains power supply (figure 2). To attach the luminaire to the ceiling pass it s cable from inside the supporting base and then connect the supporting base to the luminaire. This is done by placing the supporting base to the cable s exit and rotating it 90 degrees. For wall mounted installation slide the supporting base on the side of the luminaire and pass the cable along the periphery as shown below . Supporting Base Reflector Test Diffusor Diffusor 134 350 134 134 60 134 362 86 Service Service and maintenance activities should be done only when the device is disconnected from the mains power supply. Ni-Cd batteries should be changed when the duration of the luminarie drops below the nominal duration stated above. All the above types of Double Easy LEDs Light series, are also produced with a new designed crystal with GR-XXX/CRV code, for example GR-390/CRV. Page 1 of 2 Brown Blue Male terminal block TECHNICAL CHARACTERISTICS Black N 923392000_23_001 General Disconnect the battery when the luminaire is not connected to the mains power supply for long. The unit must be connected to a dedicated fused power line, for example 16A rating. The maintained luminaire's lamp should be changed every year. Replaced batteries must not be thrown into trash bins. They must be returned to special battery disposal points. Page 2 of 2 923392000_23_001