Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
APOLLO SOLAR CHARGE CONTROLLERS USE OF SHUNT, SHUNT BOARD, AND ASNET CONNECTIVITY KIT BASIC OVERVIEW The basics are simple: The T80 and T100 TurboCharger products include the hardware and software to measure and display the State of Charge (SOC) of the Battery. The method used is considerably more practical and accurate than simply measuring battery voltage because the battery voltage in typical systems will read very high when the battery is being charged and read very low when the battery is simply being used by the load. (The only way to depend on the voltage is to disconnect the battery from both loads and charging devices, let it settle for 20 minutes and then take accurate readings and adjust for temperature.) Since this is impractical in real systems, Apollo Solar uses a method which continually measures the current going into the battery from all charging devices and the current going out of the battery to all loads. USE OF THE SHUNT AND SHUNT BOARD The Charge Controller determines when the battery is completely charged as it goes into Float mode and resets the SOC accumulator. Then the SHUNT measures the current going out of or into the battery on a continuous basis. The results are displayed on the LCD of the T80 TurboCharger and on the Remote Display when used. The Shunt is wired in series with the negative lead of the battery. See diagram below: SHUNT WIRING DETAIL _ FROM THE + T80 TurboCharger BATTERY TERMINALS MODULAR CABLE WITH6 PIN RJ-11 AT BOTH ENDS PLUGS INTO THE CONTROL PC BOARD IN THE T80. OUTPUT TO DC LOAD BREAKER + This diagram shows a pair of 12 volt batteries. The T80 works with 12, 24 or 48 volt battery systems. APOLLO SHUNT BOARD _ +Bat FUSE -Bat SHUNT 50mV 500AMP Temperature TEMPERATURE SENSOR (Stick between batteries below top of the electrolyte level .) BATTERY VOLTAGE SENSE WIRES WITH FUSE (Must be connected across the full battery voltage .) NOTE: The Shunt must be the only item wired directly to the battery negative terminal . Please see the User Manual of the Apollo Solar T80 TurboCharger for detailed instructions. _______________________________________________________________________ 23 F. J. Clarke Circle Apollo Solar, Inc. Phone (203) 790-6400 Bethel, CT 06801 www.ApolloSolar.com fax (203) 792-0300 Page 2 of 3 APOLLO SOLAR: USE OF SHUNT, SHUNT BOARD, AND ASNET PARALLEL CHARGE CONTROLLERS Since all the battery current must pass through a single SHUNT, there will only be one shunt in any system. When the system uses multiple T80 TurboChargers connected in parallel, the ASNET Option Cards (T80 Network Option Cards) are used to tie them together. Only ONE SHUNT with ONE SHUNT Board is used to measure the total accumulated current. The figure immediately below is a simplified wiring diagram of the CAT 5 (Ethernet type) cable used to connect the T80 TurboChargers together in parallel using the ASNET Option Cards. The figure also shows the connection of multiple T80s to a single Shunt. UP TO 15 SLAVE T80s CAN BE WIRED TO 1 MASTER NETWORK MASTER SLAVE 1 SLAVE 2 T80 TURBO CHARGER T80 TURBO CHARGER T80 TURBO CHARGER CAT 5 CABLE WIRED AS DAISY CHAIN FROM MASTER TO SLAVE. SHUNT CABLE PLUGGED IN MAKES THIS T80 THE MASTER A REMOTE DISPLAY MAY BE WIRED TO EITHER END OF THE CHAIN. CAT 5 CABLE 3 PAIR CABLE TO APOLLO SHUNT BOARD APOLLO T80 NETWORK OPTION CARD CAT 5 CABLE CAT 5 CABLE REMOTE DISPLAY BREAKER TO INVERTERS, BREAKERS AND LOADS APOLLO SHUNT BOARD Please see the Apollo Solar T80 TurboCharger Installation Manual that comes with the ASNET Option Card for detailed instructions of set up and programming for parallel operation. __________________________________________________________________________ 23 F. J. Clarke Circle Apollo Solar, Inc. Phone (203) 790-6400 Bethel, CT 06801 www.ApolloSolar.com fax (203) 792-0300 Page 3 of 3 APOLLO SOLAR: USE OF SHUNT, SHUNT BOARD, AND ASNET The figure below is the complete wiring diagram showing all the connections to the Apollo Solar T80 TurboChargers in parallel operation. MULTIPLE INDEPENDENT MPPT INPUTS GFDI GFDI 80A DC 80A DC 80A DC NETWORK MASTER SLAVE 1 SLAVE 2 APOLLO TURBO CHARGER APOLLO TURBO CHARGER APOLLO TURBO CHARGER APOLLO NETWORK OPTION CARD SHUNT CABLE PLUGGED IN MAKES THIS TURBOCHARGER THE MASTER CAT 5 CABLE WIRED AS DAISY CHAIN FROM MASTER TO SLAVE. CAT 5 CABLE CAT 5 CABLE BREAKER CAT 5 CABLE BREAKER A REMOTE DISPLAY MAY BE WIRED TO EITHER END OF THE CHAIN. BREAKER 3 PAIR CABLE TO APOLLO SHUNT BOARD UP TO 15 SLAVE TURBOCHARGERs CAN BE WIRED TO 1 MASTER POS BUS REMOTE DISPLAY BREAKER TO INVERTERS, BREAKERS AND LOADS APOLLO SHUNT BOARD BATT VOLTAGE SENSE WIRES (REQUIRED) NEG BUS BATTERIES 12V, 24V or 48V 500A SHUNT BATT TEMP SENSOR FUSE __________________________________________________________________________ 23 F. J. Clarke Circle Apollo Solar, Inc. Phone (203) 790-6400 Bethel, CT 06801 www.ApolloSolar.com fax (203) 792-0300