Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Kerite Cable Services Underground Solutions for High Voltage Installations — Substations Dotted line indicates four (4) separate underground 115kV circuits For over 25 years Kerite Cable Services has provided HV cable solutions to satisfied clients in the electric utilities industry. These installations range in size from a few hundred feet, within congested substations, to several miles of transmission circuits. A substation turnkey package from KCS provides the customer with the cable necessary for the project along with all required accessories, labor, and warranties. Dotted line indicates one (1) underground 115kV circuit Underground connections in substations are the ideal solution when it comes to reducing the need for outages, maintain safe access for personnel, trucks, cranes, and other maintenance equipment. The photo on the left shows an extremely congested substation. When the client needed to add a 69kV exit feeder, the only practical alternative was underground. Kerite Cable Services was contacted to provide a turnkey solution. The scope of work included the design/fabrication of the steel termination structure, providing the Kerite 69kV EPR cable, cable terminations and testing. KCS completed the project in two weeks. Terminals Duct Bank Bus Structure Underground cable installation can simplify your substation expansions project by avoiding: Right-of-Way restrictions, land restrictions, environmental concerns and property. Dotted line indicates one (1) underground 115kV circuit Underground installations allow for flexibility to install connections in almost any direction and path configuration. Cable can be directly buried or protected in concrete encased duct bank. Termination structures are typically small and cost effective. Dotted line indicates two (2) separate underground 115kV circuits Underground cable installation can solve a wide range of other right-of-way issues including: An installation package from Kerite Cable Service offers peace of mind: • Airport runway and road crossings • KCS has over 25 years of experience providing failure-free HV underground cable installations • Land development projects (i.e. golf course, high-end real estate) • New high-end real state developments • River and bridge crossings • Endangered habitat restrictions Kerite Cable Services (203) 888-2591 1-800-777-7483 (203) 888-1987: Fax www.kerite.com • Cable integrity is guaranteed for the life of the installation •E xtended warranty in labor and accessories is available for up to five years