Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Crystal radio wikipedia , lookup
Immunity-aware programming wikipedia , lookup
Opto-isolator wikipedia , lookup
Automatic test equipment wikipedia , lookup
Surge protector wikipedia , lookup
Operation Fishbowl wikipedia , lookup
Valve RF amplifier wikipedia , lookup
Rectiverter wikipedia , lookup
Valve audio amplifier technical specification wikipedia , lookup
TESTRANSFO OPERATION TESTRANSFO is NOT to be used on a live transformer. Principle : -Tests the most frequent faults with a series of 18 tests. -Tests internal protection state. Operation : With the transformer disconnected from the network, make the appropriate crocodile-clip connectIons to each Phase, Neutral and Ground. Push the button to initialise TESTRANSFO. Press the button a second time to start the series of 18 consecutive tests. The TESTRANSFO gives the result ‘Transformer OK’ or ‘Transformer in Default’. All the 18 tests must be successful to consider the transformer OK. The button is pressed to record tests results for later transfer to a computer. button turns off the TESTRANSFO © Reproduction and communication prohibited without the written permission of MADE.SA. MADE S.A. E-mail : [email protected] 167, Impasse de la garrigue Web : http://www.made-sa.com F 83210 LA FARLEDE April 2012 MADE - V 2.00 EUROPE-AFRICA-ASIA Tél : + 33 (0) 494 083 198 FAX : + 33 (0) 494 082 879 TESTRANSFO OPERATION TESTRANSFO is NOT to be used on a live transformer. Principle : -Tests the most frequent faults with a series of 18 tests. -Tests internal protection state. Operation : With the transformer disconnected from the network, make the appropriate crocodile-clip connectIons to each Phase, Neutral and Ground. Push the button to initialise TESTRANSFO. Press the button a second time to start the series of 18 consecutive tests. The TESTRANSFO gives the result ‘Transformer OK’ or ‘Transformer in Default’. All the 18 tests must be successful to consider the transformer OK. button is pressed to record tests results for later transfer to a computer. The button turns off the TESTRANSFO © Reproduction and communication prohibited without the written permission of MADE.SA. MADE S.A. E-mail : [email protected] 167, Impasse de la garrigue Web : http://www.made-sa.com F 83210 LA FARLEDE April 2012 MADE - V 2.00 EUROPE-AFRICA-ASIA Tél : + 33 (0) 494 083 198 FAX : + 33 (0) 494 082 879 TESTRANSFO is NOT to be used on a live transformer. Disconnect the transformer with all safety procedures required. Test procedure : Important note : all high voltage and low voltage feeders of the transformer must be disconnected during the tests. TESTRANSFO automatically performs a sequence of tests on the 18 different circuits shown on the right, checking for conformity with the expected result for each of the following cases : Short Circuit, Open Circuit, Impedance and result abnormality. The detailed test results can be viewed after the test by scrolling trough the results list with the button. They show each measurement against 3 criteria : Short Circuit, Open Circuit, abnormal impedance value or response curve. Notes : -TESTRANSFO does not make an insulation test. -In some cases, a short circuit between two low voltage phases may not be detected (although the visual aspect of the transformer generally gives a good indication of such a fault). -Always make sure of the good quality of the connections for the crocodile clamps : clean the dirt or the paint if necessary. Standard : NF EN 50082-1 : CEM NF EN 61010-1 : Electrical safety. Protection class : IP 32 – IK 07 Power supply Dimensions Composition Weight Display : 9 volts battery , type LR61 440 x 280 x 320 mm Plastic case 0.3 Kg LCD screen 4 lines + led FS_TESTRANSFO_V_2_00_US TESTRANSFO is NOT to be used on a live transformer. Disconnect the transformer with all safety procedures required. Test procedure : Important note : all high voltage and low voltage feeders of the transformer must be disconnected during the tests. TESTRANSFO automatically performs a sequence of tests on the 18 different circuits shown on the right, checking for conformity with the expected result for each of the following cases : Short Circuit, Open Circuit, Impedance and result abnormality. The detailed test results can be viewed after the test by scrolling trough the results list with the button. They show each measurement against 3 criteria : Short Circuit, Open Circuit, abnormal impedance value or response curve. Notes : -TESTRANSFO does not make an insulation test. -In some cases, a short circuit between two low voltage phases may not be detected (although the visual aspect of the transformer generally gives a good indication of such a fault). -Always make sure of the good quality of the connections for the crocodile clamps : clean the dirt or the paint if necessary. Standard : NF EN 50082-1 : CEM NF EN 61010-1 : Electrical safety. Protection class : IP 32 – IK 07 Power supply Dimensions Composition Weight Display : 9 volts battery , type LR61 440 x 280 x 320 mm Plastic case 0.3 Kg LCD screen 4 lines + led FS_TESTRANSFO_V_2_00_US