Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Asbestos Blockplans University Park Campus Known Buildings with Asbestos Containing Ceiling/Wall Plaster, Spray-on Fireproofing/Coatings, Ceiling Tiles and Transite Panels DO NOT PRINT THIS LISTING AND ASSUME CHANGES NEVER OCCUR. UPDATES ARE ADDED CONSTANTLY. IF A BUILDING IS NOT SHOWN ON THIS LISTING, DO NOT ASSUME THERE IS NO ASBESTOS IN THE BUILDING. These Asbestos Blockplans DO NOT include the following asbestos containing materials, which are commonly found in most University buildings: Thermal insulations such as pipe, boiler, tank, or duct insulation; these are assumed to contain asbestos unless they are obviously fiberglass or foam rubber. Resilient floorings (i.e. 12"x12" and 9"x9" Floor Tile, Linoleum, etc.); these are also assumed to contain asbestos Soapstone Lab Bench Tops are also assumed to contain asbestos. Note: Many of these materials are above drop ceilings or encased in walls and are not readily visible. If needed, more specific locations of asbestos containing materials can be obtained by calling Environmental Health and Safety at 814-865-6391 (863-1111 after 5 P.M.). For more information on recognition and identification of other common asbestos containing materials and regulations, see the “Identification/Quick Reference for Asbestos-Containing Building Materials” link on the EHS Asbestos Webpage. Agricultural Engineering - Troweled-on ceilings. Agricultural Seed – Transite panels. (Blockplans not created for this building. The Transite panels are found throughout the facility). Althouse Lab – Ceiling tiles ARL (Applied Science) - Spray-on fireproofing possible inside walls and chases, Asbestos wallboard. (Blockplans kept at EHS) Page 1 of 5 Armsby – Ceiling tile adhesives (under 12”x12” ceiling tiles). (Blockplans not created for this building. The ceiling tiles with adhesives are found throughout the facility). Boucke - Troweled on ceilings and wall trim (wall trim in corridors only) Brumbaugh Hall – Spray-on (textured) ceiling paint. (Blockplans not created for this building. The textured paint is easily found and recognized.) Buckhout Lab – Wall plaster in Room 213. Carpenter - Spray-on fireproofing on I-beams, assumed to be enclosed in walls. (Blockplans not created for this building.) Chambers - Troweled-on ceilings and ceiling tile adhesives (under 12”x12” ceiling tiles). Chandlee Lab - Transite wall panels in corridors. (Blockplans not created for this building. Panels are easily seen.) Computer - Spray-on fireproofing (some above drop ceilings) (Ceiling tiles in affected areas cannot be moved or replaced without contacting EHS first). Dairy Barns C, D, F – Transite ceiling and wall panels throughout facilities. Davey Lab - Troweled-on ceiling (Room 12 only). Eisenhower Auditorium - Spray-on fireproofing (some above drop ceilings) (Ceiling tiles in affected areas cannot be moved or replaced without contacting EHS first). Eisenhower Chapel - Troweled-on ceilings. Electrical Engineering West - Troweled-on ceilings (some above drop ceilings) (Ceiling tiles in affected areas cannot be moved or replaced without contacting EHS first). Fisher Hall – Spray-on (textured) ceiling paint. (Blockplans not created for this building. The textured paint is easily found and recognized.) Ford – Transite window system panels. (Blockplans not created for this building. The Transite panels are easily seen from the exterior of the building). Forest Resources Lab - Spray-on ceilings. Gypsy Moth Research – Transite wall panels. (Blockplans not created for this building. The Transite panels are found throughout the facility). Page 2 of 5 Hamilton Hall - Troweled-on ceiling material above sliding closet door tracks in Student Rooms. (Blockplans not created for this building.). Hammond (Kunkle Lounge Area) – Transite floor decking. Headhouse II – Transite ceiling and wall panels. Henderson (North) – Ceiling and adhesives (under 12”x12” ceiling tiles). (Drop ceiling tiles in affected areas cannot be moved or replaced without contacting EHS first). Kern - Spray-on fireproofing above drop ceilings (Ceiling tiles in affected areas cannot be moved or replaced without contacting EHS first). Land and Water Research - Spray-on fireproofing (Mechanical Room only). Mastitis Research Barn – Transite wall and ceiling panels. (Blockplans not created for this building. The Transite panels are found throughout the facility). McKee Hall - Troweled-on ceiling material above sliding closet door tracks in Student Rooms. (Blockplans not created for this building.). Moore - Spray-on fireproofing assumed to be within some chases and stairwell walls. (Blockplans not created for this building. The fireproofing locations cannot be confirmed until demolition is needed). Mushroom Research - Transite ceiling panels, Ceiling tiles (Ceiling tiles in affected areas cannot be moved or replaced without contacting EHS first). Mushroom Test Demo Facility - Transite duct. Music - Troweled-on ceilings. Osmond Lab - Transite wall panels in corridors. (Blockplans not created for this building. Panels are easily seen.) Oswald (Liberal Arts) Tower – Troweled-in fire-stop material in voids between floors (under unit ventilators). (Blockplans not created for this building. The white fire-stop is easily found and recognized above drop ceilings or under unit ventilators. Ceiling tiles above unit ventilators cannot be moved or replaced without contacting EHS first). Pattee Library - Ceiling patch areas (old Central Wing), spray-on fireproofing (old East Wing Mechanical Room). (Blockplans not created for this building. Patch areas easily seen.) Page 3 of 5 Paterno Library – Sprayed-on fireproofing on ceiling in Basement Mechanical Room EM022 only. Pinchot Hall – Spray-on (textured) ceiling paint. (Blockplans not created for this building. The textured paint is easily found and recognized.) Pond Lab - Transite duct (some above drop ceilings) and wall (only in Room 107). Porter Hall - Spray-on (textured) ceiling paint throughout the building. Ceiling plaster in Basement Mechanical Room. (Blockplans not created for textured ceilings, which are easily found and recognized). Rackley - Spray-on fireproofing assumed to be within some chases and stairwell walls. Transite window system panels. (Blockplans not created for this building. The fireproofing locations cannot be confirmed until demolition is needed and the Transite is easily visible). Rec Hall - Troweled-on ceilings (some above drop ceilings). (Ceiling tiles in affected areas cannot be moved or replaced without contacting EHS first). Research Center Storage I – Transite wall panels. (Blockplans not created for this building. The Transite panels are found throughout the facility). Research Unit A – Transite wall/window panels. (Blockplans not created for this building. The Transite panels are found only around exterior windows). Research Unit B – Transite wall/window panels. (Blockplans not created for this building. The Transite panels are found only around exterior windows). Research Unit C – Transite wall/window panels. (Blockplans not created for this building. The Transite panels are found only around exterior windows). Ritenour - Troweled-on ceilings (some above drop ceilings) (Ceiling tiles in affected areas cannot be moved or replaced without contacting EHS first). Ritner Hall - Ceiling tile adhesive (under 12”x12” ceiling tiles). (Blockplans not created for this building. The ceiling tile are easily found and recognized). Sackett – Transite floor decking (Kunkle Lounge area), Transite wall panels (Loft area). Shields - Spray-on fireproofing. Page 4 of 5 Shunk Hall – Spray-on (textured) ceiling paint. (Blockplans not created for this building. The textured paint is easily found and recognized). Sparks – Dry-wall / joint compounds (wood studded walls only). (Blockplans not created for this building.). Sproul Hall – Spray-on (textured) ceiling paint. (Blockplans not created for this building. The textured paint is easily found and recognized). Swine Research – Transite panels. (Blockplans not created for this building. The Transite panels are found throughout the hog pen area). Tener Hall – Spray-on (textured) ceiling paint. (Blockplans not created for this building. The textured paint is easily found and recognized). Theatre (formerly Arts) - Troweled-on ceilings (some above drop ceilings) (Ceiling tiles in affected areas cannot be moved or replaced without contacting EHS first). Thompson Hall - Troweled-on ceiling material above sliding closet door tracks in Student Rooms. (Blockplans not created for this building.). Whitmore - Troweled-on ceilings (some above drop ceilings), Transite wall panels in corridors (Ceiling tiles in affected areas cannot be moved or replaced without contacting EHS first). Willard - Troweled-on ceilings and wall trim (some above drop ceilings) (Ceiling tiles in affected areas cannot be moved or replaced without contacting EHS first.) Wolf Hall – Ceiling tile adhesive (under 12”x12” ceiling tiles). (Blockplans not created for this building. The ceiling tile are easily found and recognized). Created: Updated: September 20, 2002 August 19, 2004 October 6, 2014 For more information on PSU EHS asbestos policies, services, etc. please call (814) 865-6391 or e-mail Mike Burke at: [email protected]. Page 5 of 5