Survey
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
Medium Voltage Starter Sales Checklist Complete and return this Medium Voltage Check List to assist in the engineering process of providing a properly manufactured Solid State Starter, which will meet customer specific requirements. Complete each section as this will ensure a timely and accurate response. Project Name and/or End-User: Contact Name: Phone Number: Email: SECTION A – Starter Application: Type of application Present starting method: Across the Line Wye-Delta Auto Transformer Other: Starts / Stops per day: 1-5 6 -10 11-15 16-20 Over 20 (please specify) Current Acceleration Time 1-5 seconds 6-10 seconds 16-20 seconds >20 seconds 11-15 seconds (please specify) Current Deceleration Time (if applicable) 1-5 seconds 6-10 seconds 16-20 seconds > 20 seconds 11-15 seconds (please specify) Power source Utility (Transformer feed capacity – kVA) Short Circuit MVA (I) Delta Wye 3 wire 4 wire Delta, Corner Grounded High resistance ground Solid Ground (please specify) Ungrounded Generator (Generator kW rating) (please specify) 100-035 Rev. D Date: 07/02/2014 1 of 4 Approval: Kaizen Team Medium Voltage Starter Sales Checklist Distance from Line to starter: < 250 ft. 251 - 500 ft. 501 - 750 ft. > 750 ft. (please specify) Conductor type: Shielded Non-Shielded Distance from Starter to motor : < 250 ft. 251-500 ft. 501-750 ft. > 750 ft. (please specify) Size and Quantity of Conductors: Line side Size: Load side Size: Line side Quantity: / PHASE Load side Quantity: /PHASE SECTION B - Motor Data: Type of motor: Induction Synchronous Wound Rotor Horsepower: (If Synchronous or Wound Rotor, see Section “E” or “F” for additional questions.) Motor voltage: 2300 4160 6900 13,800 Frequency: 25 Hz 50 Hz 60 Hz Other: Other: (please specify) (please specify) NEMA Design: FLA: 100-035 Rev. D “A” Service Factor: “B” “C” Motor LRA: Date: 07/02/2014 2 of 4 “D” “E” Motor Speed (RPM): Approval: Kaizen Team Medium Voltage Starter Sales Checklist SECTION C - Enclosure / Environment Data: Expected ambient temperature: Space heater: Yes Minimum: No “ High Size limitation: Altitude: Maximum: (Space Heater required if less than 0 C) Physical Location: Indoor Outdoor “ Wide ( please indicate above dimensions. ) up to 3,300ft. “ Deep above 3,300ft. (please specify) Excessive Vibration and or Noise: Color: Vibration Beige Noise ANSI 61 Grey Other: (standard) Cable Entry location: Top Bottom Neither (please specify) Cable Exit location: Top (standard) Horizontal Bus: Bottom (standard) NONE 800Amp 1200Amp 2000Amp (standard) Other: (please specify) Insulation on Bus: Yes (price adder) No (standard) UL Rating (NEMA Type): 1 3R 12 Other: (standard) (please specify) SECTION D - Miscellaneous: Disconnect: Fusible Disconnect Starting Method: Keypad None 2-Wire Control 3-Wire Control (standard) Other: (please specify) Across-The-Line Starting Option: Yes No (standard) 100-035 Rev. D Date: 07/02/2014 3 of 4 Approval: Kaizen Team Medium Voltage Starter Sales Checklist Will any of the following be present?: Power Factor Correction Capacitors Note: PFCC must be located on the Line side of the Starter and must be isolated from the line during starting. Lightning Arrestors Note: May be placed on either the Line or Load side of the Starter. Surge Capacitors Note: Must be at the motor terminals and must be isolated during starting to prevent Starter damage. SECTION E – Synchronous Motor Data: Normal Field Current: (ADC) Max Field Current: (ADC) Field Discharge Resistor Rating: Synchronous Motor Field Voltage: (VDC) SECTION F – Wound Rotor Motor Data: Wound Rotor Motor: Starting Duty Resistor Continuous Running Duty Resistor Quantity of steps/resistance: Present number of steps: Secondary Voltage: (VAC) Secondary Current: (Amps) SECTION G – Additional Modifications, Accessories and/or Information: Customer’s Signature Customer’s Company Date 100-035 Rev. D Date: 07/02/2014 4 of 4 Approval: Kaizen Team