Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 Provo City Energy Department Sheet No. 1-3 PROVO CITY ENERGY DEPARTMENT ELECTRIC SERVICE SCHEDULE NO. 3 _________________________________ General Service -- Distribution Voltage Optional Time-of-Use ****Closed Rate**** AS OF JULY 2013 ______________________________ AVAILABILITY This schedule is available at any point on the Energy Department electric system where facilities of adequate capacity and standard general service voltages are available. This schedule shall be available to customers upon (1) the customer’s payment for the required metering equipment and installation, which equipment shall become the property of the Energy Department, and (2) the Energy Department’s installation of the required time-of-day metering equipment. In the event that such installation may be delayed due to installation schedules or limited availability of such metering equipment, customers shall be placed on a prioritized list for service as such installation schedules or metering equipment become available. APPLICATION This optional schedule is for electric customers who qualify to receive service under the Energy Department’s General Service - Distribution Voltage schedule. This schedule is applicable to electric services used for, but not limited to, retail or wholesale businesses, manufacturing or processing establishments, offices, hotels, motels, churches and separately metered common areas of apartment or condominium complexes. CHARACTER OF SERVICE Service under this schedule shall be single-phase, 60 Hertz, alternating current at the Energy Department’s available standard general service distribution voltages. At the option of the Energy Department, three-phase service may be provided. All service required on the premises by the customer will be supplied through one meter. Standby or resale service is not permitted under this schedule. Council Approval: June, 20116 Effective: July 1, 2016 Billing Period 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 Provo City Energy Department Sheet No. 2-3 ELECTRIC SERVICE SCHEDULE NO. 3 (Continued) MONTHLY RATE The monthly billing for electric service, excluding charges for other utility services and taxes, shall be the sum of the following charges: Customer Service Charge: On-Peak Demand Charge: Off-Peak Demand Charge: Energy Charge: $30.16 per Service Connection $13.30 per kW $4.66 per kW $0.0446 per kWh DETERMINING DEMAND The Energy Department will apply the off-peak demand charge to 100 percent of the off-peak demand without any on-peak charges only if the off-peak demand is at least 40 percent greater than the on-peak demand for the same month. Otherwise the on-peak rate will be applied to the on-peak demand without any off-peak charges. ON AND OFF-PEAK TIME PERIODS On-Peak Off-Peak 7:00 am to 11:00 pm, Monday through Friday, except holidays All other times Holidays include only New Year’s Day, President’s Day, Memorial Day, Independence Day, Pioneer Day, Labor Day, Thanksgiving Day, and Christmas Day. When a holiday falls on a Saturday or Sunday, the Friday before the holiday (if the holiday falls on a Saturday) or the Monday following the holiday (if the holiday falls on a Sunday) will be considered a holiday and consequently off-peak. DEMAND METERING The on or off-peak kW demand shall be the highest measured 15-minute kW for the on or off-peak time period for the billing period, adjusted for power factor as specified in this schedule. Council Approval: June, 20116 Effective: July 1, 2016 Billing Period 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 Provo City Energy Department Sheet No. 3-3 ELECTRIC SERVICE SCHEDULE NO. 3 (Continued) POWER FACTOR The Energy Department may, at its option, install metering equipment to allow the utility to determine the reactive components of power utilized by the customer. The customer’s utilization of equipment shall not result in a power factor at the point of delivery of less than 90% lagging at the time of maximum demand. Should the power factor be less than 90% lagging during any month, the Energy Department may adjust the readings taken to determine the billed demand by multiplying the kW obtained through such readings by 90% and by dividing the result by the power factor actually established at the time of maximum demand during the on-peak or off-peak time periods of the current month. Such adjusted readings shall be used in determining the billing demand. The Energy Department reserves the right, at its option, to utilize kVA meters, kVAR meters, and / or other appropriate meters in those metering installations where the customer’s power factor is believed to be unsatisfactory on a continuous basis according to the Energy Department’s standards. If such meters are installed, the billing demand in kW or kVA may be computed from such instruments. MINIMUM CHARGE The minimum monthly charge shall be the Customer Charge listed above under the Monthly Rate section. TAX ADJUSTMENTS The amount computed at the above Monthly Rate shall be subject to taxes, assessments and surcharges imposed by Provo City or any governmental authority authorized to levy said taxes, assessments or surcharges. TERMS AND CONDITIONS Service under this schedule will be in accordance with the Energy Department’s electric service standards and policies and terms and conditions set forth by the Department’s standard application requirements and Provo City Ordinances, including any future additions or amendments. Council Approval: June, 20116 Effective: July 1, 2016 Billing Period 144 145 146 Council Approval: June, 20116 Effective: July 1, 2016 Billing Period