Download electric service schedule no. 3

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Alternating current wikipedia , lookup

General Electric wikipedia , lookup

Power engineering wikipedia , lookup

Mains electricity wikipedia , lookup

Vehicle-to-grid wikipedia , lookup

Grid energy storage wikipedia , lookup

Life-cycle greenhouse-gas emissions of energy sources wikipedia , lookup

Transcript
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
Provo City Energy Department
Sheet No. 1-3
PROVO CITY ENERGY DEPARTMENT
ELECTRIC SERVICE SCHEDULE NO. 3
_________________________________
General Service -- Distribution Voltage
Optional Time-of-Use
****Closed Rate****
AS OF JULY 2013
______________________________
AVAILABILITY
This schedule is available at any point on the Energy Department electric system where facilities
of adequate capacity and standard general service voltages are available. This schedule shall be
available to customers upon (1) the customer’s payment for the required metering equipment and
installation, which equipment shall become the property of the Energy Department, and (2) the
Energy Department’s installation of the required time-of-day metering equipment. In the event
that such installation may be delayed due to installation schedules or limited availability of such
metering equipment, customers shall be placed on a prioritized list for service as such
installation schedules or metering equipment become available.
APPLICATION
This optional schedule is for electric customers who qualify to receive service under the Energy
Department’s General Service - Distribution Voltage schedule. This schedule is applicable to
electric services used for, but not limited to, retail or wholesale businesses, manufacturing or
processing establishments, offices, hotels, motels, churches and separately metered common
areas of apartment or condominium complexes.
CHARACTER OF SERVICE
Service under this schedule shall be single-phase, 60 Hertz, alternating current at the Energy
Department’s available standard general service distribution voltages. At the option of the
Energy Department, three-phase service may be provided. All service required on the premises
by the customer will be supplied through one meter. Standby or resale service is not permitted
under this schedule.
Council Approval: June, 20116
Effective: July 1, 2016 Billing Period
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
Provo City Energy Department
Sheet No. 2-3
ELECTRIC SERVICE SCHEDULE NO. 3 (Continued)
MONTHLY RATE
The monthly billing for electric service, excluding charges for other utility services and taxes,
shall be the sum of the following charges:
Customer Service Charge:
On-Peak Demand Charge:
Off-Peak Demand Charge:
Energy Charge:
$30.16 per Service Connection
$13.30 per kW
$4.66 per kW
$0.0446 per kWh
DETERMINING DEMAND
The Energy Department will apply the off-peak demand charge to 100 percent of the off-peak
demand without any on-peak charges only if the off-peak demand is at least 40 percent greater
than the on-peak demand for the same month. Otherwise the on-peak rate will be applied to the
on-peak demand without any off-peak charges.
ON AND OFF-PEAK TIME PERIODS
On-Peak
Off-Peak
7:00 am to 11:00 pm, Monday through Friday, except holidays
All other times
Holidays include only New Year’s Day, President’s Day, Memorial Day, Independence Day,
Pioneer Day, Labor Day, Thanksgiving Day, and Christmas Day. When a holiday falls on a
Saturday or Sunday, the Friday before the holiday (if the holiday falls on a Saturday) or the
Monday following the holiday (if the holiday falls on a Sunday) will be considered a holiday and
consequently off-peak.
DEMAND METERING
The on or off-peak kW demand shall be the highest measured 15-minute kW for the on or
off-peak time period for the billing period, adjusted for power factor as specified in this
schedule.
Council Approval: June, 20116
Effective: July 1, 2016 Billing Period
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
Provo City Energy Department
Sheet No. 3-3
ELECTRIC SERVICE SCHEDULE NO. 3 (Continued)
POWER FACTOR
The Energy Department may, at its option, install metering equipment to allow the utility to
determine the reactive components of power utilized by the customer. The customer’s utilization
of equipment shall not result in a power factor at the point of delivery of less than 90% lagging
at the time of maximum demand. Should the power factor be less than 90% lagging during any
month, the Energy Department may adjust the readings taken to determine the billed demand by
multiplying the kW obtained through such readings by 90% and by dividing the result by the
power factor actually established at the time of maximum demand during the on-peak or off-peak
time periods of the current month. Such adjusted readings shall be used in determining the
billing demand.
The Energy Department reserves the right, at its option, to utilize kVA meters, kVAR meters,
and / or other appropriate meters in those metering installations where the customer’s power
factor is believed to be unsatisfactory on a continuous basis according to the Energy
Department’s standards. If such meters are installed, the billing demand in kW or kVA may be
computed from such instruments.
MINIMUM CHARGE
The minimum monthly charge shall be the Customer Charge listed above under the Monthly
Rate section.
TAX ADJUSTMENTS
The amount computed at the above Monthly Rate shall be subject to taxes, assessments and
surcharges imposed by Provo City or any governmental authority authorized to levy said taxes,
assessments or surcharges.
TERMS AND CONDITIONS
Service under this schedule will be in accordance with the Energy Department’s electric service
standards and policies and terms and conditions set forth by the Department’s standard
application requirements and Provo City Ordinances, including any future additions or
amendments.
Council Approval: June, 20116
Effective: July 1, 2016 Billing Period
144
145
146
Council Approval: June, 20116
Effective: July 1, 2016 Billing Period