Siemens Industry Inc. January 31, 2010 Standard Lead-times Changes From Previous Month Low Voltage Electrical Apparatus plants have capacity for Quick Ship and Short Cycle Opportunities. Consult Factory as needed. Notes * Standard Lead-times do not include products with special modifications or make-to-order breakers. For lead time adders to use with typical modifications See page 2. For details, special modifications, quick ships, detailed information on availability or all other products not listed, consult Sales Office. Lead-times are from the date of receipt of the order at the factory and do not include any order entry processing time to get it submitted to the factory. Shipment and Approval Drawing Lead-times for orders received at the factory after 12:00 noon will begin the following business day. All Shipment lead-times are for released projects only (shipment lead-times do not reflect approval drawings or customer review times). All Approval Drawing lead times are y for initial y drawings and do not reflect customer review times and subsequent changes. (d) = days, (w) = week/s Product Line Panelboards (Lighting & Distribution Panels) 1 P1* P2*1 1 P3* 2 P4/P5* Cans Ahead i-3 Lighting Control Panels Column Panels / Telephone Cabinets Switchboards 3 SB1* SB2*3 SB3*3 RCS SMM Standard MMS Busway (under 4000 feet)*4 Busway (Sentron) PowerIIFit Program (5 pieces)*5 MCC*6 (under $200k)*7 SC7 PDQ Near Standard Engineered Complex Aftermarket Unit Only - System 89 (Feeders / Starters)*7 Aftermarket Legacy Units - Model 95+ / Model 95 / Model 90 (Feeders / Starters)*7 Low Voltage Switchgear Standard and Arc Resistant LVS Unit Sub Station / Power Switching Center Primary Switch, Transformer MV Switchgear*9 GM-SG and GM38 MV GIS MVC: Certified / Approval SIMOSEC: Single Simple Section / Multiple or Complex Section Non-Standard Residential Products*10 Load Centers Meter Combos Meter Sockets Group Metering Circuit Breakers NEMA & General Purpose Controls (Non-Stocked Items)*11 Combo Starter 18 QTY<6 Class 17& (Size 4 & under / above size 4)*12 Combo Starter QTY<6 Class 25, 26, 32*12 Non-Combo Starter Class 14 *12 , 22, 30, 40, / 43 Pump Panels Qty<10 Class 87 (Size 4 and under/ Size 5 & 6)*13 Pump Panels Qty<10 Class 81 / 88*13 Duplex Controllers Class 83, 84 Soft Starter Class 73, 74 Reduced Voltage Starters Class 36, 37 Lighting Control Class LE (20A:20V / 200-400A:120V)*14 Lighting Control Class CLM (20-60A:120V)*14 Control Power Transformers Class MT & MTG Manual Control Class SMF, MMS & MRS, 11 - 3RV Overload and Current Sensitive Relays Class 48, 958, 958L & 97 Circuit Protection (Non-Stocked Items) 4 & 6 pole, DT and low volume 2 & 3 pole Safety & Disconnect Switches Receptacle Switches & Enclosed Rotary Switches Sentron Circuit Breakers and NGG,NGB and BQD,CQD VL Circuit Breakers General Purpose MCCB type EG,EB,EM WL Power Breakers Page 1 of 2 Standard Lead-time Approval Drawing Shipment 7 (d) 9 (d) 9 (d) 12 (d) 5 (d) 20 (d) 15 (d) SPACE SPACE SPACE SPACE SPACE SPACE SPACE / SPEEDFAXTM Approval Drawing Shipment SPACE SPACE 12 (d) - 4 (w) 3-5 (w) 7-8 (w) 10 (w) 7 (w) 7 (w) Approval Drawing Shipment 3 (w) n/a 5 (w) 5 (d) Approval Drawing Shipment SPACE 2-4 (w) 2-3 (w) SPACE 1 (w) 1 (w) 1 (w) 2-3 (w) 3-5 (w) 7 (d) Consult Sales Office 2-4 (w) 3-5 (w) 5-7 (w) 7-10 (w) 7-10 (d) / 10-15 (d) 10-15(d) / 15-20 (d) Approval Drawing*8 Shipment Consult Sales Office 2-3 (w) 10 (w) Approval Drawing Shipment Consult Sales Office Consult Sales Office Approval Drawing Shipment 6 (w) 6 (w) 4-6 (w) 3 (w) / 6 (w) 18 (w) 30 (w) 9 (w) / 12 (w) 14 (w) / 20 (w) Shipment 10 (d) 10 (d) 10 (d) Power Mod- 10 (d), all other: 20 (d) 10 (d) Shipment 3-5 (d) / 7-10 (d) 7-10 (d) 3-5 (d) / 10-15 3-5 (d) / 5-7 (d) 3-5 / 10-15 (d) 7-10 (d) 10-15 (d) 10-15 (d) 3-5 (d) / 10-12 (d) 3-5 (d) PLEASE SEE FOOTNOTE 14 FOR EXCEPTIONS 20 (d) 15-20 (d) 10-15 (d) Shipment 2-4 (w) 6-8 (w) 3-4 (w) 2-3 (w) 2 (w) 3-4 (w) Siemens Industry Inc. January 31, 2010 Standard Lead-times Special Modifications / Comments Note Product Line # Special Modifications *1 P1 - P3 Lead-times Lead-time / Lead-time Adder 5 (d adder) Painted Can, Plug-In Breaker, Sub feed Lugs, Compression Lugs, Vertical Main, Silver Plated Copper (tin plated copper is standard), Split Bus, Metering 10 (d adder) Custom Lugs, LEN/ASCO Contactor, Welded Card Holder, Screw On Nameplate (NEMA 3R/12, 4,4X only), Special Lock, Special Enclosure, Copper Lugs, Ground Fault (E Frames), TVSS Units 2-3 (w adder) 6-8 (w adder) *2 P4, P5 Comments Special Modifications Add additional lead time for Built To Order Molded Case Circuit Breakers and Accessories. Refer to the latest electronic version of or a and add the indicated lead time to the standard lead time. the SPEEDFAXTM for those items marked with a 5 (d adder) Tin plated copper (silver is standard) 5 (d adder) Split Bus, Subfeed Lugs, Blown Fuse Indication, LEN/ASCO Contactor, Vertical Main, Special Enclosure, Metering 2-3 (w adder) 6-8 (w adder) Add additional lead time for Built To Order Molded Case Circuit Breakers and Accessories. Refer to the latest electronic version of or a and add the indicated lead time to the standard lead time. the SPEEDFAXTM for those items marked with a Consult Sales Office Copper Lugs 2-3 (w adder) 6-8 (w adder) *3 Switchboards *4 Busway: Large Projects (>4000 feet) *5 PowerIIFit Program (5 pieces) 5 (d) MCC Product Designation SPACE 2000 EPM 2-3 (w adder) Add additional lead time for Built To Order Molded Case Circuit Breakers and Accessories. Refer to the latest electronic version of or a and add the indicated lead time to the standard lead time. the SPEEDFAXTM for those items marked with a SB1/SB2: Metering SB3 Specials: Bus Duct Connection, Automatic Transfer Switch, Throw-over System (Auto or Manual), Vault Stub, Insulated Bus, Special Paint, Motor Starter Unit, Access Communication or Zone Selective Interlocking (ZSI), Transformer Connection, Special/Stainless Steel Enclosures Consult Sales Office Special Factory Test Requirements and Witness Testing *6 MCC Orders over $200K *7 Consult Sales Office Consult for manufacturing lead time and approval drawing lead time on large projects. Pieces must be straight sections and/or 90 degree edge or flat elbows, and included and identified as final fit with original order entry SPACE 2000 EPM will determine appropriate product designation except for SC7 which is a subset of PDQ. Consult Sales Office to determine SC7 eligibility. Consult Sales Office Must consult for manufacturing lead time and approval drawing lead time Actual lead-time may vary based on unit complexity, special components, and MCC reference order. Units classified as Complex MCC Aftermarket - Unit ONLY Consult Sales Office may take up to 30 business days. Units 36'' in height, or higher, require additional lead time. Model 95+ and Model 95 units are not interchangeable. Correct reference order needed. All Other types not listed - Consult Sales Office. *8 LVS / Drawings: Single Line & Elevation / Full Eng Package - Simple / Full End Package - Complex 2-4 (w) *9 Medium Voltage Gear ------ Lead-times must be confirmed at the time of order acceptance. *10 Residential Products ------ Standard Lead time represents number of days to fill backorders for non-stock items or stocked items that temporarily go out of stock. NEMA & General Purpose Controls and Circuit Breakers (stocked items) ------ *11 3-5 (d) Combination starters NEMA 4X (Fiberglass Encl.) NEMA 7/9 Enclosure ------consult factory consult factory Pump Panels Quantities larger than 10 ------5-7(d) 10-15(d) *14 Lighting Control Contactors Consult Sales Office All other ratings. Lead time for current ratings and control voltages other than shown may be longer than the standard lead time. *15 Circuit Protection Molded Case Circuit Breakers ------ Refer to the latest electronic version of the SPEEDFAXTM to determine which breakers and accessories are considered non-stock. Build to order items will be marked with a or a *12 *13 Depending on the number of line-ups All non stock items, Lead times do not include special modifications All stocked items will be shipped within 3-5 business days. For detailed information on Circuit Breaker availability: contact National Customer Service Standard Lead times are for NEMA 1, 12, & 4X (Stainless Steel) Enclosures. Class 17 (under Size 4 only), 18 (under Size 4 only), 25, 26, 32 Class 14 & 18 (under Size 4 only), 26 Class 14 starters Size 5 and up (110-127V & 440-480V) lead time is 10-12 (d). All other voltages: Consult factory. Standard lead time are for quantities less than 10 Class 87, 81 Class 88 Panelboard/Switchboard Quick Ship Lead-time P4/P5*2 P1/P2/P3*1 3 (d) 5 (d) 5 (d) 10 (d) General Comments Does not include special modifications referenced above. SB1/SB2/SB3*3 For all non-standard product Quick Ship lead-time options consult the factory Consult Factory (Bari Hennigan) For all other Special Modification consult Sales Office. Expedited Shipments available - consult Sales Representative. Length of Approval Drawing time varies in a range depending on complexity. When requirements are less than the quick ship standard multipliers per Mixed Apparatus Pricing guidelines, bill of material must be attached to Quick ship Form and faxed/emailed to designated manufacturing facility for approval. Page 2 of 2