Siemens Industry Inc.
January 31, 2010
Standard Lead-times
Changes From Previous Month
Low Voltage Electrical Apparatus plants have capacity for Quick Ship and Short Cycle Opportunities. Consult Factory as needed.
Notes
* Standard Lead-times do not include products with special modifications or make-to-order breakers. For lead time adders to use with typical modifications See page 2.
For details, special modifications, quick ships, detailed information on availability or all other products not listed, consult Sales Office.
Lead-times are from the date of receipt of the order at the factory and do not include any order entry processing time to get it submitted to the factory.
Shipment and Approval Drawing Lead-times for orders received at the factory after 12:00 noon will begin the following business day.
All Shipment lead-times are for released projects only (shipment lead-times do not reflect approval drawings or customer review times).
All Approval Drawing lead times are
y for initial
y drawings and do not reflect customer review times and subsequent changes.
(d) = days, (w) = week/s
Product Line
Panelboards (Lighting & Distribution Panels)
1
P1*
P2*1
1
P3*
2
P4/P5*
Cans Ahead
i-3 Lighting Control Panels
Column Panels / Telephone Cabinets
Switchboards
3
SB1*
SB2*3
SB3*3
RCS
SMM Standard
MMS
Busway (under 4000 feet)*4
Busway (Sentron)
PowerIIFit Program (5 pieces)*5
MCC*6 (under $200k)*7
SC7
PDQ
Near Standard
Engineered
Complex
Aftermarket Unit Only - System 89 (Feeders / Starters)*7
Aftermarket Legacy Units - Model 95+ / Model 95 / Model 90 (Feeders / Starters)*7
Low Voltage Switchgear
Standard and Arc Resistant LVS
Unit Sub Station / Power Switching Center
Primary Switch, Transformer
MV Switchgear*9
GM-SG and GM38
MV GIS
MVC: Certified / Approval
SIMOSEC: Single Simple Section / Multiple or Complex Section
Non-Standard Residential Products*10
Load Centers
Meter Combos
Meter Sockets
Group Metering
Circuit Breakers
NEMA & General Purpose Controls (Non-Stocked Items)*11
Combo Starter 18 QTY<6 Class 17& (Size 4 & under / above size 4)*12
Combo Starter QTY<6 Class 25, 26, 32*12
Non-Combo Starter Class 14 *12 , 22, 30, 40, / 43
Pump Panels Qty<10 Class 87 (Size 4 and under/ Size 5 & 6)*13
Pump Panels Qty<10 Class 81 / 88*13
Duplex Controllers Class 83, 84
Soft Starter Class 73, 74
Reduced Voltage Starters Class 36, 37
Lighting Control Class LE (20A:20V / 200-400A:120V)*14
Lighting Control Class CLM (20-60A:120V)*14
Control Power Transformers Class MT & MTG
Manual Control Class SMF, MMS & MRS, 11 - 3RV
Overload and Current Sensitive Relays Class 48, 958, 958L & 97
Circuit Protection (Non-Stocked Items)
4 & 6 pole, DT and low volume 2 & 3 pole Safety & Disconnect Switches
Receptacle Switches & Enclosed Rotary Switches
Sentron Circuit Breakers and NGG,NGB and BQD,CQD
VL Circuit Breakers
General Purpose MCCB type EG,EB,EM
WL Power Breakers
Page 1 of 2
Standard Lead-time
Approval Drawing
Shipment
7 (d)
9 (d)
9 (d)
12 (d)
5 (d)
20 (d)
15 (d)
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE / SPEEDFAXTM
Approval Drawing
Shipment
SPACE
SPACE
12 (d) - 4 (w)
3-5 (w)
7-8 (w)
10 (w)
7 (w)
7 (w)
Approval Drawing
Shipment
3 (w)
n/a
5 (w)
5 (d)
Approval Drawing
Shipment
SPACE
2-4 (w)
2-3 (w)
SPACE
1 (w)
1 (w)
1 (w)
2-3 (w)
3-5 (w)
7 (d)
Consult Sales Office
2-4 (w)
3-5 (w)
5-7 (w)
7-10 (w)
7-10 (d) / 10-15 (d)
10-15(d) / 15-20 (d)
Approval Drawing*8
Shipment
Consult Sales Office
2-3 (w)
10 (w)
Approval Drawing
Shipment
Consult Sales Office
Consult Sales Office
Approval Drawing
Shipment
6 (w)
6 (w)
4-6 (w)
3 (w) / 6 (w)
18 (w)
30 (w)
9 (w) / 12 (w)
14 (w) / 20 (w)
Shipment
10 (d)
10 (d)
10 (d)
Power Mod- 10 (d), all other: 20 (d)
10 (d)
Shipment
3-5 (d) / 7-10 (d)
7-10 (d)
3-5 (d) / 10-15
3-5 (d) / 5-7 (d)
3-5 / 10-15 (d)
7-10 (d)
10-15 (d)
10-15 (d)
3-5 (d) / 10-12 (d)
3-5 (d) PLEASE SEE FOOTNOTE 14 FOR EXCEPTIONS
20 (d)
15-20 (d)
10-15 (d)
Shipment
2-4 (w)
6-8 (w)
3-4 (w)
2-3 (w)
2 (w)
3-4 (w)
Siemens Industry Inc.
January 31, 2010
Standard Lead-times Special Modifications / Comments
Note
Product Line
#
Special Modifications
*1
P1 - P3
Lead-times
Lead-time /
Lead-time Adder
5 (d adder)
Painted Can, Plug-In Breaker, Sub feed Lugs, Compression Lugs, Vertical Main,
Silver Plated Copper (tin plated copper is standard), Split Bus, Metering
10 (d adder)
Custom Lugs, LEN/ASCO Contactor, Welded Card Holder, Screw On Nameplate (NEMA 3R/12, 4,4X only), Special Lock, Special
Enclosure, Copper Lugs, Ground Fault (E Frames), TVSS Units
2-3 (w adder)
6-8 (w adder)
*2
P4, P5
Comments
Special Modifications
Add additional lead time for Built To Order Molded Case Circuit Breakers and Accessories. Refer to the latest electronic version of
or a
and add the indicated lead time to the standard lead time.
the SPEEDFAXTM for those items marked with a
5 (d adder)
Tin plated copper (silver is standard)
5 (d adder)
Split Bus, Subfeed Lugs, Blown Fuse Indication, LEN/ASCO Contactor,
Vertical Main, Special Enclosure, Metering
2-3 (w adder)
6-8 (w adder)
Add additional lead time for Built To Order Molded Case Circuit Breakers and Accessories. Refer to the latest electronic version of
or a
and add the indicated lead time to the standard lead time.
the SPEEDFAXTM for those items marked with a
Consult Sales Office Copper Lugs
2-3 (w adder)
6-8 (w adder)
*3
Switchboards
*4
Busway:
Large Projects (>4000 feet)
*5
PowerIIFit Program
(5 pieces)
5 (d)
MCC Product Designation
SPACE 2000 EPM
2-3 (w adder)
Add additional lead time for Built To Order Molded Case Circuit Breakers and Accessories. Refer to the latest electronic version of
or a
and add the indicated lead time to the standard lead time.
the SPEEDFAXTM for those items marked with a
SB1/SB2: Metering
SB3 Specials: Bus Duct Connection, Automatic Transfer Switch, Throw-over System (Auto or Manual), Vault Stub, Insulated Bus,
Special Paint, Motor Starter Unit, Access Communication or Zone Selective Interlocking (ZSI), Transformer Connection,
Special/Stainless Steel Enclosures
Consult Sales Office Special Factory Test Requirements and Witness Testing
*6
MCC Orders over $200K
*7
Consult Sales Office Consult for manufacturing lead time and approval drawing lead time on large projects.
Pieces must be straight sections and/or 90 degree edge or flat elbows, and included and identified as final fit with original order entry
SPACE 2000 EPM will determine appropriate product designation except for SC7 which is a subset of PDQ. Consult Sales Office to
determine SC7 eligibility.
Consult Sales Office Must consult for manufacturing lead time and approval drawing lead time
Actual lead-time may vary based on unit complexity, special components, and MCC reference order. Units classified as Complex
MCC Aftermarket - Unit ONLY Consult Sales Office may take up to 30 business days. Units 36'' in height, or higher, require additional lead time. Model 95+ and Model 95 units are not
interchangeable. Correct reference order needed. All Other types not listed - Consult Sales Office.
*8
LVS / Drawings:
Single Line & Elevation /
Full Eng Package - Simple /
Full End Package - Complex
2-4 (w)
*9
Medium Voltage Gear
------
Lead-times must be confirmed at the time of order acceptance.
*10
Residential Products
------
Standard Lead time represents number of days to fill backorders for non-stock items or stocked items that temporarily go out of
stock.
NEMA & General Purpose
Controls and Circuit Breakers
(stocked items)
------
*11
3-5 (d)
Combination starters
NEMA 4X (Fiberglass Encl.)
NEMA 7/9 Enclosure
------consult factory
consult factory
Pump Panels
Quantities larger than 10
------5-7(d)
10-15(d)
*14
Lighting Control Contactors
Consult Sales Office
All other ratings. Lead time for current ratings and control voltages other than shown may be longer than the standard lead time.
*15
Circuit Protection
Molded Case Circuit Breakers
------
Refer to the latest electronic version of the SPEEDFAXTM to determine which breakers and accessories are considered non-stock.
Build to order items will be marked with a
or a
*12
*13
Depending on the number of line-ups
All non stock items, Lead times do not include special modifications
All stocked items will be shipped within 3-5 business days. For detailed information on Circuit Breaker availability: contact National
Customer Service
Standard Lead times are for NEMA 1, 12, & 4X (Stainless Steel) Enclosures.
Class 17 (under Size 4 only), 18 (under Size 4 only), 25, 26, 32
Class 14 & 18 (under Size 4 only), 26
Class 14 starters Size 5 and up (110-127V & 440-480V) lead time is 10-12 (d). All other voltages: Consult factory.
Standard lead time are for quantities less than 10
Class 87, 81
Class 88
Panelboard/Switchboard Quick Ship Lead-time
P4/P5*2
P1/P2/P3*1
3 (d) 5 (d) 5 (d) 10 (d)
General Comments
Does not include special modifications referenced above.
SB1/SB2/SB3*3
For all non-standard product Quick Ship lead-time options consult the factory
Consult Factory (Bari Hennigan)
For all other Special Modification consult Sales Office.
Expedited Shipments available - consult Sales Representative.
Length of Approval Drawing time varies in a range depending on complexity.
When requirements are less than the quick ship standard multipliers per Mixed Apparatus Pricing guidelines, bill of material must be attached to Quick ship Form
and faxed/emailed to designated manufacturing facility for approval.
Page 2 of 2