Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Electrification wikipedia , lookup
Ground (electricity) wikipedia , lookup
Alternating current wikipedia , lookup
History of electric power transmission wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Voltage optimisation wikipedia , lookup
Rectiverter wikipedia , lookup
ABB Marine High Voltage Shore Connection © ABB Group May 25, 2017 | Slide 1 Driving forces for shore connection Green profiling of cities and ship operators Regulations like © ABB Group May 25, 2017 | Slide 2 MARPOL 73/78 Annex VI Limits on sulphur oxide and nitrogen oxide emissions from ship exhausts and prohibit deliberate emissions of ozone depleting substances EU Directive 2005/33/EG Limits the amount of sulphur to 0,1% in all marine fuel used while at berth for more than 2 hours in European ports EU Recommendation 2006/339/EG The commission recommends its membership countries to promote shore side electricity facilities Cost of producing electricity on board Infrastructure Considerations Voltage, frequency and grounding of the supplying network and ship network Continuous and temporary power demand Cable management systems On shore © ABB Group May 25, 2017 | Slide 3 On board Location of ship berth Location of shore connection point on board Available space on board Existing ship distribution network Safety management ABB Marine Shore Connection Concept Shore Connection Box © ABB Group May 25, 2017 | Slide 4 Shore Connection Feeder The ABB High Voltage shore connection is an integrated system of both power and control equipment for seamless power transfer The ABB Shore connection concept will comply to the international standards, which are being developed IEC 60092-510 edition1 IEC/ISO PAS On board Installation Depending on the vessel’s design, ABB Marine Services is able to install and commission a complete shore connection system as a turnkey project during operation of the vessel with out interruptions of services © ABB Group May 25, 2017 | Slide 5 Shore Connection System Solutions Example Light grey = ABB delivery for OPS RED lines = HV circuit BLACK lines = control circuit © ABB Group May 25, 2017 | Slide 6 In this example the cable and cable reel are located on board the vessel The power cable from the ShoreConnection Box is connected directly to the Main Switchboard Power transfer is seamless Synchronization and load transfer of the shore power will be controlled in the Engine Control Room and it is fully automatic Shore Connection Control and Supervision © ABB Group May 25, 2017 | Slide 7 Power transfer is seamless Synchronization and load transfer of the shore power will be controlled in the Engine Control Room and it is fully automatic Interfacing to ship automation and onshore supply Procedure can also be followed on shore side ABB Shore Connection benefits Turn key supply for the complete system Safety through experience and system understanding Reliability with type approved equipment Availability of ABB worldwide service network Environmental benefits through lower emissions Better comfort due to reduced vibration and noise Flexible arrangement and easy installation Reduced lifecycle cost by reduced fuel consumption and maintenance cost © ABB Group May 25, 2017 | Slide 8 References Vessels with ABB High Voltage Shore connection system in use today © ABB Group May 25, 2017 | Slide 9 Sun Princess Cruise vessel 6,6 kV Dawn Princess Cruise vessel 6,6 kV Sea Princess Cruise vessel 6,6 kV Ocean Princess Cruise vessel 6,6 kV Golden Princess Cruise vessel 6,6 kV Amsterdam Cruise vessel 11 kV Zuiderdam Cruise vessel 11 kV Westerdam Cruise vessel 11 kV Oosterdam Cruise vessel 11 kV Noordam Cruise vessel 11 kV © ABB Group May 25, 2017 | Slide 10