Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Firm Name : Attachment 3 : Power Demand Summary Project Name : Date: 1. Power Demand Summary Power Requirements Project Development Scheduled Completion Date Connected Load in (KVA) Maximum Demand in (KVA) Estimated Consumption in (KWH/Yr) Phase 1 Phase 2 Ultimate 2. Record the Distribution Voltage within the facility in Volts 3. Provide details of any arc furnace, electrochemical processes, rectifier leads, and other equipment that could cause a power disturbance. 4. Special Electrical Requirements Motor Type Horsepower Voltage Largest Motor H.V. Motor L.V. Motor 5. Emergency Power Supply Indicate the maximum period of time the production process can be sustained without power supply. Describe the type of emergency power supply to be installed by the investor. S: Adonis / SAR / Power Demand Summary Rating KVA Page 1 | 3 (SAR - Attachment 3) Firm Name : Attachment 3 : Power Demand Summary Project Name : Date: 6. Equipment Details: Motive Power Load Type of Motor Quantity Type of Starter H.P. Maximum number of starts per hour /a/ Total H.P. Power Factor KVA /a/ Ignore motors less of than 10 H.P. 7. Welding Load Type of Welder 8. Arc Furnaces Quantity Total S: Adonis / SAR / Power Demand Summary Total KVA Process Heating ElectroChemical Rectifier Type of Equipment Usage Pattern & Control Load in KVA Total Page 2 | 3 (SAR - Attachment 3) Firm Name : Attachment 3 : Power Demand Summary Project Name : Date: 9. General Power Summary Load Total KW Maximum Demand Connected Load KVA KW KVA Lighting Motive Power (Table 6) Welders (Table 7) Process Heating etc. (Table 8) Space Heating Air Conditioning Water Heating Cooking -- General Purpose Total 10. Indicate the expected overall power factor of the connected load. 11. If power factor is lower then permissible minimum (0.85), indicate what provisions for P.F. improvement are being made. 12. Provide, as an attachment, the specifications and single line diagram of switchgear and protective relaying equipment to be installed by the investor. 13. If emergency standby generation is to be installed by the investor, provide details (including single line diagram) of interlocking proposed to avoid paralleling with utility supply. S: Adonis / SAR / Power Demand Summary Page 3 | 3 (SAR - Attachment 3)