* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download INSTALLATION INSTRUCTIONS FOR ORBEON CEILING
Audio power wikipedia , lookup
Electric power system wikipedia , lookup
History of electric power transmission wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Electrification wikipedia , lookup
Alternating current wikipedia , lookup
Electrician wikipedia , lookup
Power engineering wikipedia , lookup
Immunity-aware programming wikipedia , lookup
Mains electricity wikipedia , lookup
ORBEON INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS FOR ORBEON CEILING MOUNTED LED LUMINAIRE CAUTION HIGH VOLTAGE LIGHT FIXTURES AND WIRING SHOULD BE SERVICED BY A QUALIFIED ELECTRICIAN READ THOROUGHLY BEFORE INSTALLING WARNING! Fixtures must be grounded and installed in accordance with the National Electrical Cole and all local codes. Failure to do so may increase the RISK OF PERSONAL INJURY, PROPERTY DAMAGE, FIRE AND DEATH. Install and use so fixture failures do not cause a hazard and use only in environments for which the product is specifically marked. WARNING! This product contains chemicals know to the State of California to cause cancer, birth defects, and/ or other reproductive harm. Thoroughly wash hands after installing, handling, cleaning, or otherwise touching this product. CAUTION! Follow ALL luminaire and control recommendations, product markings, instructions, restrictions and warnings regarding luminaire operation and burning position. Luminaire label shows electrical and environmental requirements and restrictions. All electrical work must be done by a qualified electrician. Turn off electric power to all affected circuits and allow to cool before servicing. Carefully read these instructions before installing product. If you do not understand these instructions, before starting any work, contact your Hubbell Lighting distributor or [email protected] or (864) 678-1000. Give instructions to facility owner/manager for future reference. ORBEON INSTALLATION INSTRUCTIONS page 2 WARNING: TO AVOID DAMAGE TO LED LAMPS, AC POWER SUPPLY MUST BE TURNED OFF BEFORE CONNECTING OR DISCONNECTING SECONDARY WIRING CONNECTIONS. INSTRUCTIONS: (ENSURE THAT POWER IS TURNED OFF) 1. Verify that input power is 120-277 VAC. 2. Loosen Phillips screw that holds the bracket to the housing. Remove bracket from Orbeon housing. 3. If provided with the optional bird guard, secure bracket to the housing using screws provided. 4. Attach the mounting bracket to the junction box (by others) using screws (by others). Junction box may be recessed (as shown), surface mounted or suspended. Assure bracket is square with traffic for aesthetics. Observe “street side” label if directional optics are provided. Street side label should be mounted to match the direction of traffic flow. Concrete (by others) Ceiling Surface Conduits and Primary Wiring (by others) Mounting Bracket .75 2 3.5 1.75 4 2.75 Screw 3 Bird Guard Align the guard such that this notch is opposite of the screw 6.0 ORBEON INSTALLATION INSTRUCTIONS page 3 5. Hook the Orbeon housing on to the bracket. 6. Connect the power leads supplied on Orbeon to the power leads in the junction box. 7. Rotate the Orbeon housing upwards to close the fixture. Stuff wiring into junction box. Junction Box (by others) 5 6 Connect Leads 5 7 Orbeon LED Housing 8. Tighten the Phillips screw loosened in step 2 to secure the Orbeon housing. 8 9 9. Turn the power on and test. Generic Model Details May Vary