Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
UF Telecom Standards Overview ITAC-Network Infrastructure Presented By John Madey Associate Director Computing & Networking Services Telecommunications & Network Infrastructure November 12, 2009 Road Map for Today • • • • Standards background Quick overview Highlights Next Steps Background • Current version dated May 2005 • Used as a starting point for new construction design / major renovations • Addresses physical infrastructure – Structured cabling systems – Information transport systems Overview • Sections cover major components: – Telecom Rooms – Backbone Cabling – Horizontal Cabling – Outside Plant – Labeling and documentation • Appendix provide additional detail • Tracked variance requests, industry trends and internal review Highlights • Access to all Telecom Spaces: – Card Access – Page 8 Highlights • Entrance Facility / Main Telecommunications Room/ Telecom Room Backboard: – Use readyspec backboard – Page 8 Highlights • Section 4.0 Telecom Room Size: – 10’ X 12’ space – 5’ X 14’ room with 2 sets of double doors – Stacked – Page 12 Highlights • Section 6.0 Horizontal Pathways: – No “J hooks” for new construction – Use cable tray (conduit stubbed out to tray) – Renovations / existing – some times no choice Highlights • Section 7.0 WAO (Work Area Outlet): – Use to be 3 cables – 2 data one voice – Now – just 2 cables – Minimum – user needs may add more – Page 18 Highlights • Section 8.0 Backbone cabling: – Intra-building fiber – Page 19 Highlights • Section 9.0 Horizontal Cabling: – Reinforce telecom standards must be followed by other low voltage systems. – Page 22 Highlights • Section 11.0 Deliverables: – Page 27 Highlights • Section 17.0 Blue Light Phones -- NEW – New section – Use Talk-A-Phone products – Appendix – installation detail • Section 18.0 Mass Notification System -- NEW – IP Paging via InformaCast – Indoor / Outdoor IP Speakers – Outdoor Loudspeakers Next Steps • Review and incorporate feedback from: – Network community – Facilities Planning & Construction – Consulting Engineers • Send out and present to: – FP&C – overview meeting – PPD – overview meeting – Contractors Contact Info John Madey University of Florida Computing & Networking Services Email: [email protected] Phone: 352.273.1113