* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download Z N A L E C K Ý P O S U D O K
Green building wikipedia , lookup
Stalinist architecture wikipedia , lookup
Russian architecture wikipedia , lookup
Green building on college campuses wikipedia , lookup
Architecture of the United States wikipedia , lookup
Architecture of Madagascar wikipedia , lookup
Building material wikipedia , lookup
Architecture of ancient Sri Lanka wikipedia , lookup
Diébédo Francis Kéré wikipedia , lookup
The municipality of Smolník The municipality of Smolník is situated in a narrow valley of Smolnícky potok in the central part of the mountain range of Spišsko-gemerské rudohorie at the height of 561 m above seal level; its surface area is 6,976 ha and it has 1,260 inhabitants. The valley of Smolnícka dolina is narrow; it lacks arable soil and has unfavourable conditions for agriculture. Therefore the source of living of its inhabitants has been the woods, pastures and especially the mining industry. The last tons of ore were mined in Smolník in 1990 and thus the famous and long era of ore deposits and the mining industry in Smolník ended. The valley of Smolnícky potok is delimited by Veľký Vtáčí Vrch (1,046 m above sea level) in the north, by Zenderlin and Tupý Vrch, with the height of 1,031 and 1,046 m respectively, in the south, and by the principal ridge of Slovenské rudohorie Pánsky Vrch, 1,058 m, Hekerová, 1,260 m in the west. Tobacco factory Brief history The tobacco factory in Smolník is the only tobacco factory in Slovakia. Large premises of a massive building, where the Mining Chamber and the first theatre with a turning stage in Europe had their seats, were, after the local resources of silver and copper were mined out, rebuilt into a cigar production factory in 1872. The old manufacturing factory used to employ 1,872 women what back then represented aboveaverage employment in the entire municipality and its surroundings. Men made their living by timber production. This work distribution persists without any change, however, with a lower rate of employment. Women are more suitable for this type of work. The significance of the factory in Smolník producing hand-wrapped cigars is proven by the fact that its employees were at the time of the monarchy and of the Czechoslovak Republic considered as state employees and they were protected by tenure. When the production started, the building also held a maternity school for children of the female packers. Thus the tradition of rolling of quality, nicely scenting cigars was transferred from generation to generation. Whole dynasties of skilful packers were born. The production itself, interrupted only by a short break lasting for approximately one week during the Second World War and invoked by the walling in of the tobacco warehouses due to a fear of plunder, has been going on until the present days. It has not been influenced neither by economic crises, politics, nor military conflicts. 2 Basic data The site is located in the central part of Smolník, whereas its eldest buildings – administrative building and old production building – constitute the principal landmarks of the Main Square. The remaining part of the site consisting of the plot no. 88/1 slightly descends to the valley of Smolnícky potok. This fact is also confirmed by the majority of the buildings which on their southern side have entrances usually at the level of the ground-floor, whereas from the northern side the entrance is at the level of the basement. The real estate is registered in the List of Titles No. 320, cadastral territory of Smolník. The site is enclosed by two types of fences; a part of the lands contains built, hardened storage, parking and handling areas. At present, the buildings are empty since the production of cigars was stopped. The vicinity of the site includes especially housing constructions since Smolník is a small municipality with 1,270 inhabitants. The housing constructions are of average technical condition, whereas all buildings underwent significant reconstructions, they are connected to a new boilerhouse; they have new plastic windows, sanitary facilities, etc. The connection to public municipal and state roads is favourable; all buildings are connected to all available utility networks. These constructions may be used for lease only partially since they are situated in a municipality with a high rate of unemployment, low purchasing power of the population and with conflict groups within the community. 3 Layout The layout of the individual buildings situated in the site according to numbers is marked in the copy of the land map that shows the composition of the site. 4 Old production building Already in 1871, the place of today`s old production building was taken by a two-storey high brick building with cellars which was most probably supplemented by another storey around the year 1900 since this building completely burned down in 1905 and the photo-documentation from that period clearly confirms that on the side of the Main Square the building was a three-storey high brick construction with cellars and three short additional annexes. The roof of the building was a saddle roof; the ceilings of the upper three storeys were made of wood. After the fire, the building was fully reconstructed and most 5 probably used to serve in the same form until 1993 when the building, as a cultural historical monument, was fully reconstructed on the roof, façade and other typical construction elements. Today, the ceilings of the assessed building are predominantly made of concrete, the windows are double-paned windows, the floors are partially made of PVC, partially of parquet wood and the remaining part is made of concrete floors with ceramic tiles and cement surface coating. The roof is equipped with a concrete roof covering. The building is connected to all available utility networks; it has a water distribution system, a sewerage system, central heating and electrical installations with the voltage of 220 and 380 V. In 1975, the side wings at the basement level were supplemented by two garage canopies. 6 Administrative building, Registration No. 167 To the left from the entrance to the site of Imperial Tobacco Slovakia Smolník, there is a threestorey brick administrative building the age of which was in cooperation with the competent employees of the assignor and on the basis of a submitted confirmation of the age of constructions estimated to 98 years. The construction is built on the plot no. 88/1, whereas it has its own individual registration no. 167. From the construction point of view, the building is a massive brick construction (the walling in the lower part of the construction is of the width of more than 100 cm) with double-paned windows, panel doors, stone staircases, wooden roof load-bearing construction with concrete, sandwich roof covering. The building contains administrative, as well as small accommodation premises. The building is connected to all available utility networks. 7 Fitter`s shop In 1969, the whole site underwent a considerable reconstruction and modernization. Within the framework of the works performed in this period, a fitter`s shop and an additional warehouse directly connected to the boiler-house were added. As it results from the attached ground-plan and volume schemes, the given building could form a functional unit with the boiler-house. The building has the form of a hall with a brick external cladding and a roof construction on steel bar joists. The building is heated by the nearby boilerhouse. The windows are steel double-paned windows; the doors are plain steel and wooden doors. The flooring is mainly made of concrete, the plasters are whitewashed. The building is connected to all available utility networks. Boiler-house A boiler-house was built in the same period as the fitter`s shop and currently burns wooden waste, whereas combustion gases are taken away by waste gas flues through separators into the brick factory chimney of the height of 35.6 m. The building has the form of a hall with a brick external cladding and a roof construction on steel bar joists. The windows are steel double-paned windows; the doors are plain steel and wooden doors. The flooring is mainly made of concrete, the plasters are whitewashed. 8 Boarding-house One of the eldest buildings of the site was reconstructed in 1974 and the former maternity school was transformed into a boarding house for visitors and a wood workshop. The submitted confirmation of the age of buildings clearly shows that the building was originally launched into use in 1910. From the ground plan point of view, the building is made of two interlocked wings forming the letter L. It is a simple, two-storey high brick construction and its roof is covered with Eternit. The external façade plaster is slightly damped, the windows are simple wooden windows, the doors are simple wooden doors and the building has sheet-metal constructions such as water-troughs and downpipes. The entrance to the building is assured by concrete stairs. The building also contains a small kitchen. 9 Wood workshop One of the eldest buildings of the site was reconstructed in 1974 and the former maternity school was transformed into a boarding house for visitors and a wood workshop. The submitted confirmation of the age of buildings clearly shows that the building was originally launched into use in 1910. From the ground plan point of view, the building is made of two interlocked wings forming the letter L. The boardinghouse and the wood workshop are two independent buildings due to substantial layout differences. From the construction point of view, it is a simple, two-storey high brick construction and its roof is covered with Eternit. The external façade plaster is slightly damped, the windows are simple wooden windows, the doors are simple wooden doors and the building has sheet-metal constructions such as water-troughs and downpipes. The entrance door is a wooden, double-wing door equipped with a terrace blind. The building also holds a device for the release of wood-shavings from the building. The building is connected to all available utility networks. Diesel-aggregate The north-western side of the site no. 88/1 constituting the principal part of the assessed site contains a simple one-storey brick rectangular building built in 1970 which holds a spare power source –a power aggregate. The building is not registered in the List of Titles as an individual construction. The external walls are of the width of 38 cm; the roof is flat and equipped with strips of the S-type, the entrance door is a simple sheet-metal door. 10 Warehouse of raw materials and finished products The eldest building of the assessed site is situated under the old production building behind a small courtyard and according to the submitted confirmation of the age of buildings it was built already in 1840. This building currently serves for storage of semi-finished and finished products. It is a brick hall-type three-storey building with iron-concrete ceilings, whereas the underground floor – basement is set in the terrain only by its southern half, since the northern part (similarly to other buildings) is at the level of the modified terrain. The roof load-bearing construction above the last storey was originally made of wood with an inclination of approximately 10 %. During the reconstruction of the middle roof cladding, its structural layout was modified and thus considerably heightened the originally flat saddle roof. The above mentioned works were performed in 1990. The roof covering is made of zinccoated sheet-metal plates, the windows are predominantly simple steel windows, the doors are panel and plain doors. The flooring is partially made of concrete, partially of parquet wood and partially of beech parquetry. The external walls in the lower part are of the width of 70 cm. The lower construction does not show any obvious full-area dampness despite the fact that the building was built in the 19th century. Heating of the building is provided centrally from the boiler-house. 11 Production building, Section A – Reg. No. 167 Production building, Section B – Reg. No. 167 In 1969, in addition to other buildings, two new blocks with saddle roofs for the production of cigars were also built. Both parts of the production building have the same registration number 167. The structural layout of these buildings corresponds with the construction tendencies of the 1960s. The load-bearing structure consists of an ironconcrete frame set on a coherent monolithic ironconcrete foundation plate. There are five storeys above its level, whereas the lowest level in Section B of this complex clearly forms a basement. The beam filling consists of inserted porous concrete panels of 12 the width of 38 cm. Both production buildings may use one freight elevator located in Section B. The roofs of both buildings were originally flat onecladding roofs insulated with gas-silicate panels. However, climatic conditions of the location required a change in the structural layout of the roof cladding, as well as of these buildings and therefore the original one-cladding roofs were replaced with wooden saddle roofs with coherent sheets and zinc-coated sheetmetal covering. Section B is only partially equipped with cellars. The building is heated from the central boilerhouse by means of medium-pressure steam. The windows of the building are new plastic windows, the doors are plain, the flooring is mainly made of PVC, the tiles in sanitary facilities are ceramic, the plasters are whitewashed. 13 The site also contains several independent buildings which served for the assurance of production, in particular: Oil management Waste water treatment plant Tool-shed no. 1 Tool-shed no. 2 Warehouse of fuels and lubricants Gatehouse Fences o barrier fences o mesh fences External modifications o water tank o new and original water feeder line 14 o o o o o o sewerage system rainwater disposal system caliduct steam pipeline hardened surfaces – cobble-stones hardened surfaces - concrete Lands 1. Lands registered in the List of Titles No. 320 Register C This concerns the lands under the buildings and the related lands with utility networks and inner-site roads. The lands are situated in the centre of the municipality of Smolník, the intensity of use is average, they comprise standard constructions with regular technical equipment. It concerns a typical commercial location, the equipment of the lands with utility networks is at a very good level, the buildings are connected to all available utility networks. Plot No. Type of land Formula 888/3 Built-in area and courtyard 944/1 garden 944/2 garden 117 Total Share acreage Acreage in m2 117.00 1/1 117.00 1143 1,143.00 1/1 1,143.00 1/1 512.00 512 Total acreage 512.00 1,772.00 15 2. Lands registered in the List of Titles No. 320 – Register E This concerns the lands under the buildings and the related lands with utility networks and inner-site roads. The lands are situated in the centre of the municipality of Smolník, the intensity of use is average, they comprise standard constructions with regular technical equipment. It concerns a typical commercial location, the equipment of the lands with utility networks is at a very good level, the buildings are connected to all available utility networks. 3. Lands – permanent grasslands – Register E This concerns the lands around the water tank, situated outside the built-in territory of the municipality, marked as permanent grasslands. This concerns lands without use, without utility networks, with a relatively good access from the municipality. Generally, these lands are not usable and they are only relevant for those who own the water tank. Plot No. Type of Formula land Total Share acreage Acreage in m2 2414 Permanent grasslands 10272 10,272.00 1/1 10,272.00 2428 Permanent grasslands 36635 36,635,00 1/1 36,635.00 2432 Permanent grasslands 13681 13,681.00 1/1 13,681.00 2436/2 Permanent grasslands 728 728.00 1/1 728.00 Total acreage 61, 316.00 16 17 18