Download Power Factor Fact Sheet

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Decibel wikipedia , lookup

Telecommunications engineering wikipedia , lookup

Wireless power transfer wikipedia , lookup

Standby power wikipedia , lookup

Voltage optimisation wikipedia , lookup

Power over Ethernet wikipedia , lookup

History of electric power transmission wikipedia , lookup

Electric power system wikipedia , lookup

Audio power wikipedia , lookup

Alternating current wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Power factor wikipedia , lookup

Mains electricity wikipedia , lookup

Electrification wikipedia , lookup

Power engineering wikipedia , lookup

AC adapter wikipedia , lookup

Transcript
Lost in translation
Keen to know if the electrical current
coming into your business is talking the
same language as your output power?
It’s all about Power Factor.
• Higher and better quality voltage regulation. You can avoid
unreliable equipment performance due to lower voltages
caused by poor Power Factor.
• Increased capacity to serve actual working power
requirements.
• Reduction in operational downtime caused by overloading
of electrical assets. Improved Power Factor will release
the stress on internal infrastructure.
• Lower transmission and distribution losses in your
electrical system.
• Avoidance of increased costs for new installation because
of the need to oversize cables, switchboards and other
electrical equipment due to poor Power Factor.
• Some electricity network companies charge large
power users when their Power Factor falls below
0.95 lagging – and there’s a potential extra hit with kVA
demand charges. You’ll save money with improved
Power Factor by lowering your kVA demand charges
and/or reactive charges.
THE INS ’N OUTS
You’ll see immediate improvements in performance and
cost savings when you optimise your Power Factor.
• If Power Factor is consistently below 0.95 lagging,
the most effective solution is to install Power Factor
corrective equipment. It uses automatically controlled
capacitor banks to improve power quality.
SERIOUS COST SAVINGS
The effect on monthly Power Factor penalty charges
following installation of correction equipment
$1,400
1.00
$1,200
0.98
0.96
$1,000
0.94
$800
$600
$400
PF correction equipment installed in July
0.92
PF improves to 0.97 and penalty
charges decrease dramatically
0.90
0.88
$200
$0
Power Factor
WHAT WILL IMPROVED POWER
FACTOR DELIVER?
• The corrective equipment is designed and sized to match
your site conditions and electrical load profiles.
• We can provide ongoing monitoring of your equipment
once it’s installed. A monthly fee will cover annual inspections
and monthly retrospective data checks.
• As a valued customer, we can advise immediately on your
current Power Factor level and whether your network charges
include a reactive penalty for poor Power Factor and/or a kVA
demand based charge.
Monthly PF penalty charges
Power Factor measures just how effectively
your electrical equipment is converting live
current into useful output power, like heat,
light or mechanical motion. If it’s not up to
scratch, there’s no mistaking the message –
it could be costing you money. We can check
your current Power Factor and help you make
some chunky improvements.
0.86
Jan
Feb
Mar Apr May Jun Jul
Monthly PF penalty charges
Aug Sep Oct Nov Dec
Monthly average PF
0.84
ALL THE HELP YOU NEED FROM
YOUR ACCOUNT MANAGER
Your Account Manager can set the wheels in motion by:
• Advising on your current level of Power Factor.
• Letting you know if your network is charging penalties for
poor Power Factor or kVA demand based charges.
• Discussing the process of installing corrective equipment
and payment options.
Deferred payment option
We can also discuss the option of deferring the cost of Power
Factor correction equipment through monthly instalments on
your electricity invoice. This can be done over 12, 24 or 36 months,
with payment in full should your contract be broken during the
repayment term.
We can manage the whole process from start to finish
WE’RE HERE TO HELP
For more information please contact your
Account Manager or our Business team on:
P: 0800 271 271 E: [email protected]
Inspect
Analyse
Quote
Install
Commission