Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
NDT & Corrosion Control Services Work Instruction Document # WI 111-3 Page 1 / 2 Approved By: Issue: 1/1 Date: 20 / 4 / 2000 Title: Calibration of Densitometer REFERENCE: ASME Sec V- SE 1079 Densitometer Manual OPERATION: 1. 2. Connect the power source 9 V dry battery at the rear side of the instrument’s battery chamber. (OR) DC 9V power source through adapter by inserting phone plug into jack in densitometer. Turn the power switch “ON” and allow a minimum of 30 minutes warm - up time (OR manufacture’s recommendation) to stabilize circuitry before starting the calibration. 3. Place the densitometer on a light table. 4. Adjust indication to 0.00 using “Zero” adjustment dial. 5. Select and position for reading the neutral density closest to 0.30, 3.0 and 3.9 on the NBS (National Bureau of Standards.) calibrated step tablet or the step wedge film. 6. Place the neutral density step wedge film under the measuring spot of the instrument with emulsion side up and measure the actual densitometer readings of each neutral density 0.3, 3 and 3.9 of step wedge film or step tablet. 7. Find the variation if any between the actual densitometer reading and neutral density. 8. This variation should not be more than 0.05 density units stated on the step wedge film. 9. If the variation is more than 0.05 density units the instrument should be corrected prior to measuring the densities on production radiographers and recalibration is required. 10. Record the calibrated readings in the format qf-111-5. NDT & Corrosion Control Services Work Instruction Document # WI 111-3 Page 2 / 2 Approved By: Issue: 1/1 Date: 20 / 4 / 2000 Title: Calibration of Densitometer 11. A pressure sensitive label (or) tag that indicates the calibration date, calibration due date and the identification of the person performed the calibration should be attached to the instrument. 12. Periodic calibration should be performed at the beginning of each shift, after 8 hours continuous operation or change of operator or change of apertures. DOCUMENTATION: The calibrated Densitometer shall have a tag depicting the Sr. No. and date of calibration and due for calibration. A Test certificate shall be made and it should posses the following minimum details. 1) 2) 3) 4) 5) Model & Sl. No. Date of calibration Details of calibration Validity of calibration Signature of the person performing the calibration 6) Signature of the person authorizing the calibration.