Download Engineer/Consultants Certification for Acceptance and Final Payment

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Stipulatio wikipedia , lookup

Continuous-repayment mortgage wikipedia , lookup

Transcript
EXHIBIT 7-1
ENGINEER/CONSULTANT’S CERTIFICATION
For Acceptance and Final Payment
Owner: ____________________________________________________________________________________
Project No: ________________________________________________________________________________
Project: ___________________________________________________________________________________
Contractor: ________________________________________________________________________________
Engineer: __________________________________________________________________________________
Contract Date: _____________________________________________________________________________
Date of Completion and Acceptance: ___________________________________________________________
The Contractor has notified me that he has completed all work in accordance with the Contract Documents and that
it is functioning properly.
I hereby certify that a final inspection of all work under the Contract Documents was conducted by me and to the
best of my knowledge; the work has been completed in accordance with the drawings and specifications and is
functioning properly.
I have approved all payment estimates, and prepared and received approval of all change orders. I have received the
required certifications; instructions for operating the equipment, manuals, and other documents that are applicable to
this project from the Contractor and have delivered them to the Owner.
The Owner is now responsible for the security, operation, safety, maintenance, and insurance as applicable to the
project. The contractor will warranty all specified work for a period of one year from this date of completion.
Notification has been given to the proper Government agencies that the work is completed.
I recommend, under the provision of the Contract Documents that the Work be accepted and that final payment be
made.
Executed by the Engineer on this __________________day of ___________________________, 20_____.
_________________________________
(Typed Name of Engineer)
_______________________________________
(Signature of Engineer)
(SEAL)
The work described above accepted by the consultant is hereby acknowledged and final payment authorized.
________________________________
(Date)
_________________________________________
(Owner)
Attest: __________________________
(Clerk)
_________________________________________
(Name and Title of Official)
(SEAL)