Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Insert title Work Method Statement Insert Title Warning You cannot undertake this activity in the rail corridor unless you have completed a pre work brief and work site protection plan. Reference should also be made to the Protocol for Entering the ARTC Rail Corridor and the Business Rules for Working in the ARTC Rail Corridor Minimum Personal Protective Equipment (PPE) requirements must also be met in line with the Personal Protective Equipment (PPE) Work Instruction. Work Activity: Insert Title WMS No: Insert document number Coverage: ARTC employees, and contractors directly managed by ARTC Version No: insert version number Developed by: Insert position title What are the tasks involved? Instructions: (delete this row before completing the statement) List the tasks in a logical order This document is uncontrolled when printed Approved by: Date Approved: insert date Insert position title What are the hazards and risks? What are the control measures? Related Documents List the hazards and risks that may cause harm Describe what needs to be done to control the risks. What will make the task as safe as possible? Note: ensure control measures are clear and precise List specific sections of documents if critical to control measures (and include hyperlinks where possible) Version Number: insert version number Date Reviewed: insert date Page 1 of 2 Insert title Work Method Statement References Standards, Codes of Practice, Guidance: Plant / Equipment / Tools: Include any specific references critical to the tasks. Be specific and include hyperlinks where possible List any specific plant / equipment / tools that must be used. Training Requirements: Inspection / Testing requirements: Include any specific requirements critical to the tasks List any specific requirements critical to the tasks Remove all yellow highlighted text before finalising This document is uncontrolled when printed Version Number: insert version number Date Reviewed: insert date Page 2 of 2