Download Workplace Injury Management Q16I01

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts
no text concepts found
Transcript
Insert title
Work Method Statement
Insert Title
Warning
You cannot undertake this activity in the rail corridor unless you have completed a pre work brief and work site protection plan.
Reference should also be made to the Protocol for Entering the ARTC Rail Corridor and the Business Rules for Working in the ARTC Rail Corridor
Minimum Personal Protective Equipment (PPE) requirements must also be met in line with the Personal Protective Equipment (PPE) Work Instruction.
Work Activity:
Insert Title
WMS No: Insert document number
Coverage:
ARTC employees, and contractors directly managed by ARTC
Version No: insert version number
Developed by:
Insert position title
What are the tasks involved?
Instructions: (delete this row before
completing the statement)
List the tasks in a logical order
This document is uncontrolled when printed
Approved by:
Date Approved: insert date
Insert position title
What are the hazards and risks?
What are the control measures?
Related Documents
List the hazards and risks that may cause
harm
Describe what needs to be done to control the risks.
What will make the task as safe as possible?
Note: ensure control measures are clear and precise
List specific sections of
documents if critical to
control measures (and
include hyperlinks where
possible)
Version Number: insert version number
Date Reviewed: insert date
Page 1 of 2
Insert title
Work Method Statement
References
Standards, Codes of Practice, Guidance:
Plant / Equipment / Tools:
Include any specific references critical to the tasks.
Be specific and include hyperlinks where possible
List any specific plant / equipment / tools that must be used.
Training Requirements:
Inspection / Testing requirements:
Include any specific requirements critical to the tasks
List any specific requirements critical to the tasks
Remove all yellow highlighted text before finalising
This document is uncontrolled when printed
Version Number: insert version number
Date Reviewed: insert date
Page 2 of 2