Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
ATACAMA CCAT : The Cornell-Caltech Atacama Telescope A joint project of Cornell University, the California Institute of Technology and the Jet Propulsion Laboratory Riccardo Giovanelli Guiding Principles • Scientific Excellence • Institutional Synergy • Special Niche/High Visibility • Ride the technology wave of large format Bolometer Arrays • At the best possible, easily serviceable Earth location • High synergy with (and enabler to) ALMA CCAT • A unique project geared towards the investigation of cosmic origins, from planets to galaxies, in the FIR/submm niche; • with a focus that emphasizes our institutions’ instrument building talents & development of forefront technologies; • that can sensibly achieve first light by 2012; • that will maintain the US in the forefront of research in one of the most rapidly developing observational/ technological fields; • that will provide strong opportunities for synergistic science with ALMA; • at cost affordable by a small consortium of academic institutions. The CCAT: •A 25m-class FIR/submm telescope that will operate with high aperture efficiency down to l = 200 m, an atmospheric limit •Able to accomodate large format bolometer array cameras (large Field of View ~20’) and high spectral resolution heterodyne receivers •At a very high (elevation > 5000m), very dry (Precipitable Water Vapor column PWV<1 mm) site with wide sky coverage Science Areas: • • • • • Early Universe Cosmology Galaxy Formation & Evolution Disks, Star & Planet Forming Regions Cosmic Microwave Background, SZE and Solar System Astrophysics Major Science Role: Large Scale Surveys (galaxies, debris disks, KBOs), feeder to ALMA How did we get from this: … and this? …to this: … and this Brief technical specs: •f/0.6, very large FOV •Better than 10 micron total budget •Conventional mount design •In a dome •Active primary control •Subarcsec pointing & tracking Full 20’ x 20’ FOV See G. Cortes paper at July Midterm Review Mountain Facility: Observing Level M3 Engineering & Technology Corporation Mountain Facility: First Level Plan M3 Engineering & Technology Corporation Mountain Facility: Second Level Plan M3 Engineering & Technology Corporation Mountain Facility: Building Section M3 Engineering & Technology Corporation Mountain Facility: Exterior M3 Engineering & Technology Corporation Update: Reports from Contractors Several Final Reports Received AMEC Dome Study Report All Three Panel Study Reports (CMA, Xinetics, ITT) Laser Metrology (JPL) Pending M3 Architectural Study, Vertex RSI Mount Study Calibration WFS Study, Systems Engineering Science & Requirements Report, Instrumentation Report M2/M3 Report (CSA Engineering) others Concept Updates Dome Concept Structure Further Developed Shutter Approach Illustrated Mechanisms Further Designed Cost Estimate ~$13m Consistent with Allocated Cost Central Mount Steel Normal and Uplift Rollers Normal Pivot Bearing Bogie Frame Polyurethane Radial Roller Calotte Enclosure Concept Aperture Ring CAP Interface Ring BASE Azimuth Ring Zen=00 Zen=150 Zen=300 Zen=450 Zen=600 Zen=750 Structural Design and Analysis Element Plot General design Steel triangulated frame structure Stiffened ring sections at mechanical interfaces Structural Analysis Preliminary FEA of all-steel enclosure Members optimized under survival load combinations (gravity, wind, snow, ice) Mechanical interfaces modeled with equivalent spring stiffnesses Total Enclosure Mass 140 tonne 120 tonne 50 Base structure: Cap structure: Shutter structure: tonne Cladding/Girts: Azimuth mechanical: Calotte mechanical: TOTAL: 465 tonne 80 tonne 50 tonne 25 tonne Gravity Deflections ~7mm max Concept Updates Mount Developments CAD Model Further Developed Truss Added Mass Estimated Mount Cost Not Yet in Hand Control Analysis Indicates that Mount Will Probably Meet Scanning/Pointing Requirements CCAT Mount Overview PM Study Point Design Segmentation 6 Annular Rings Segments Max 2m x 2m Wide Latitude in Design Facilitates Replication Only 6 Different Types Size Compatible With Several Manufacturing Techniques Three Panel Studies In Work Composite Mirror Applications, Tucson, AZ Al Sandwich Successfully Used by MAN for SMT, Achieving 14 µ RMS Low CTE, High Specific Stiffness Xinetics Inc., Devens, MA Nanolaminate Front Shell (LLNL Technology) Laminated to SiC Lightweighted Support Structure Proprietary Casting/Sintering Process ITT Industries, Rochester, NY (Former part of Kodak) Borosilicate Glass Forming Proprietary Process for Forming Lightweight Core Between Face and Back Sheets Concept Updates Mirror Segments Xinetics (SiC) Provides a Good Study but Cost is >>> Than Acceptable ITT and CMA Complete Studies Both Have Feasible Designs Both Costs Somewhat Higher than Target Reasonable Way Forward with Both Corrugated Mirror Assemblies Fuse top and bottom plates to corrugated core (1 day) Lightweighting efficiently stiffens face sheets. Corrugated Mirror Benefits Total process time per panel is short (~1 week) Benefit: High production rates, low cost per panel Areal densities below 10kg/m² have been demonstrated Benefit: Meets system requirements for overall weight Inexpensive raw material Benefit: Low cost per panel Several design approaches Benefit: Adequate trade space for design optimization Traditional mirror materials plus innovative manufacturing processes can meet the cost , schedule, and technical requirements of CCAT Submm Camera Strawman First light instrument FOV Nyquist sampling a 5’x5’ FOV at 350 mm: 170 170 pixel array 30,000 pixels, or 6 times that of SCUBA-2 Primary bands 200, 350, 450 mm and 620 mm Driven by similar backgrounds and adequate sampling requirements Filter wheel to change wavelengths Telescope designed with ~20’x20’ FOV; future instruments will take advantage of the entire FOV Study Report Study Report in Work First Draft Book Assembled Process for Review & Revision Defined Target is to Go to Print in Mid December Study Review in preparation (Jan 2006) Site In the highest, driest tropical region on Earth … at an elevation of ~18,000 ft a.m.s.l. (as high as you can drive a truck), in the Atacama region of Northern Chile, it will be the highest observatory on Earth. Sairecabur Toco ACT JNAO Chajnantor Negro MPI Chico ALMA CBI Honar Chascon National Science Preserve (managed by CONICYT) Sub-mm Atmospheric Transmission 3 1.0 2 1.5 1.0 0.8 0.6 0.5 Wavelength (mm) 0.4 0.3 0.2 0.9 0.125 mm 0.25 mm 0.50 mm 0.8 1.0 mm 0.25 mm Band Avg Transmission 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.0 0 200 400 600 800 1000 1200 1400 1600 Frequency (GHz) Atmospheric transmission for different amounts of precipitable water vapor. The horizontal red bars represent the adopted bandpasses and the average transmission for 0.25 mm PWV. C. Chajnantor View to North View to the South Summit (5655m) Possible site (5575m) • Spring 2003 : Partnership initiated • October 2003: Workshop in Pasadena • Feb 2004: MOU signed by Caltech, JPL and Cornell Project Status • Late 2004: Project Office established, PM, DPM hired, Study Phase pace accelerates • July 2005: Study Phase Midterm Review • Early 2006: Preliminary CDR • 2006-2008 Engineering Design Phase, finalize Site Selection • 2008-2012 Construction and First Light Estimated Construction Cost $100M (includes 1st light instrumentation) Cumulative and Yearly Spending Estimated cost of operations ~$5M/yr $120.0 $100.0 Estimated cost of Instrument Upgrade & Development ~$1.5-2M/yr Dollars in Millions (excludes intrument upgrade and development) $80.0 $60.0 $40.0 $20.0 $0.0 2005 2006 2007 2008 2009 2010 Calendar Year 2011 2012 2013