SUPERB site
status report for layout v12
S. Tomassini
INFN-LNF
On behalf of SuperB Collaboration
SuperB general meeting– ELBA – May, 29th - June 5th , 2010
Outline
• Update on site and footprint since last
December
• White Paper toward TDR “work update”
(May 2010 – release v12)
Circumference= 1.25 Km
SuperB footprint at LNF
(May 2010)
LER SLCs if arcs
have a vertical offset
of about 20 cm
HER Synchrotron Light Channels and LER injection
(May 2010)
HER injection and ring crossing
DAMPING RING
LINAC
Pumping station
Cryogenic Plant
KLOE C-room
Klystron Hall
Power Supplies
DAFNE
Magnetic
Measurements
DAFNE C-room
S. Tomassini
Reusable Civil Infrastructures: LINAC, Storage Rings, damping Ring…
Collider
hall
Damping
ring
SuperB: Horse-shoe type X-section
3D view
3D view with underground
3D view: LINAC access points
3D view: transfer lines and injection tunnels
3D view: SuperB collider hall and DAFNE
20 m
Cryogenic plant progresses
Dear Bill, Sandro and Giovanni
Please find attached my estimates of the required 4.5 refrigeration
capacity for the Babar solenoid and the final focus superconducting
magnets. These numbers are based on experience with BaBar and the
current conceptual design of the final focus magnet cryogenics. The
capacity numbers are conservative which is where we need to be at this
stage of the design. Based on the information from INFN, it looks as if
the existing Frascati Linde plant is significantly smaller than our
needs. The existing BaBar plant if operated at a flow rate of 150 g/s
nominally produces 1 kW @ 4.2 K. If we were to ship the plant I assume
we wuld also send along our helium compressors as well. The CTI plant
going to Fermilab is specifically being sent without that compressors to
make to allow them to be available for SuperB if needed. I hope this
helps. Please let me know if you have additional questions, comments or
suggestions on this topic.
Cheers, John Weisend
3.13 Site and Utilities
3.13.1 Site geology………………………………………………...01
3.13.2 SuperB footprint at LNF (and Tor Vergata)…………...…02
3.13.3 Tunnels……………………………………………………...03
3.13.4 Ground motion measurement at LNF………(LAPP)…..06
3.13.4.1 Measurement location……………………………...…06
3.13.4.2 Ground motion amplitude with time………………….07
3.13.4.3 Comparison between surface and underground......08
3.13.4.4 Ground motion coherence…………………………....10
3.13.5 AC power…………………(Sanelli-Ricci)……....…………12
3.13.6 Electrical substation……..(Sanelli-Ricci)…………..…….13
3.13.7 Cooling system……………(Pellegrino)…………………..14
3.13.8 Air conditioning…………………(Pellegrino)……………..14
3.13.9 Cryogenic Plant ……………..(G. Delle Monache- John Weisend)
3.13.10 WBS and cost evaluation………………………. (???)
3.13.11 Safety aspects……………………. (S. Vescovi is interested in)
3.13.12 Radiation protection project……… (A. Esposito is interested in)
3.14.13 Environmental Impact study……………………….(S. Vescovi)
Balck= good for WP but preliminary for TDR
Bule= preliminary for WP, not good for TDR
Red= not done yet but planned for TDR
CONCLUSIONS
• The footprint has been updated to the v12 release. Also
the Injection and transfer lines have been updated
according to the last physics calculations.
• The white paper paragraph writing has been finalized.
• Few studies are still ongoing about the positioning of the
tunnel and the various buildings and access pits.
Thank you to the contributors for the great work done up to now.
Preliminary Geological survey
1. On September 14th the first campaign of geological test
started at LNF site: 4 holes of different dept have been
bored in the points reported below. Each hole was tubed
with a plastic pipe with an inner bore of about 70mm.
1. The number of holes was minimized due to budget reasons
2. A second campaign of other four holes is foreseen soon
50m
40m
50m
30m
The second campaign of ground
motion measurement was completed
last October
For results see Benoit talk and LNF note @
http://www.lnf.infn.it/sis/preprint/pdf/getfile.php?filename=LNF-09-13(P).pdf
See also IPAC’10 proceedings.
Electrical substation 150/20 kV
2 transformers 63 MVA each can be allocated
(now 2*10 MVA)
R. Ricci
Cooling and HVAC (Heating, Ventilation and
Air Conditioning) Plants
Gross estimation is:
- Thermal power: 30 Mw
- increase 20 % (inefficiency, contingency, etc.)
- actual power: 36 Mw
- tunnel length 2700m, tunnel volume 62000 m3
-n. of sub-stations: 4
each substation requires:
- Covered technical room = 700 m2
- External technical room (cooling devices)= 1000
m2
L. Pellegrino