Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
PHI Generation Telemetry and Metering Requirements up to 20 MW February 21, 2007 1. Generator telemetry or metering will not be required for a generator under 3 MW. These generators net load with generation behind a common billing meter. (If generator exports to PJM, see #3) 2. A generator 3 MW and larger will require generation and billing meter (point of interconnection) telemetry to ACE, DPL or Pepco System Operations. The meter at the Point of Interconnection shall be equipped with a dialup modem with a phone line for remote interrogation. 3. A generator selling power into PJM up to 10 MW in size may send telemetry for its generation meter and point of interconnection meter to PJM via the internet, in lieu sending telemetry directly to ACE/DPL/Pepco, if it authorizes PJM to send the telemetry to ACE, DPL or Pepco. ACE, DPL or Pepco telemetry may be required under special technical circumstances. 4. Any generation/load customer desiring to be served under a generator "Standby" Tariff must have a separate generation meter on its generation, regardless of generator size with modem and phone line for remote dial up interrogation. Telemetry requirements, when generator telemetry is required (up to 20 MW) include: Telemetry protocol must be acceptable to ACE/DPL/Pepco. Telemetry to be sent by Interconnection Customer to ACE/DPL/Pepco via an RTU and dedicated data circuit or other means acceptable by ACE/DPL/Pepco. PJM Attachment H telemetry data point requirements: (same whether via data circuit or internet) Must match legacy SCADA - no Remote trip capability for generator circuit breakers – determined on a case by case basis Telemetry for power quality data - no Circuit breaker status - yes Volts - yes Temperature status - no Amps - yes MW - yes MVAR - yes MWH - yes MVARH - yes Harmonic - no Frequency - no Flicker - no Sag and swell - no 1 Generator metering requirements, when generator metering is required (up to 20 MW) include: Metering shall comply with ANSI and ACE/DPL/Pepco technical requirements (meter model, options and programming) Metering installed at Interconnection Customer’s expense Metering shall be owned, operated and maintained by ACE/DPL/Pepco at its cost unless otherwise arranged or required by PJM, state regulatory commissions or applicable customer Tariffs. ACE_DPL_Pepco telemetry requirements 022107.doc 2