Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Appendix I to Annex G Application Summary for CDM 2007 1. CDM 2007 Applies to all Construction Work; including all demolition and dismantling, irrespective of duration or numbers of operatives involved. 2. Construction Work means the carrying out of any building, civil engineering or engineering construction work and includes – a. The construction, alteration, conversion, fitting out, commissioning, renovation, repair, upkeep, redecoration or other maintenance (including cleaning which involves the use of water or an abrasive at high pressure or the use of corrosive or toxic substances), de-commissioning, demolition or dismantling of a structure ; b. The preparation for an intended structure, including site clearance, exploration, investigation (but not site survey) and excavation and the clearance or preparation of the site or structure for use or occupation at its conclusion; c. The assembly on site of prefabricated elements to form a structure or the disassembly on site of prefabricated elements which, immediately before such disassembly, formed a structure; d. The removal of a structure or of any product or waste resulting from demolition or dismantling or dismantling of a structure or from disassembly of prefabricated elements which immediately before such disassembly formed such a structure and e. The installation, commissioning, maintenance, repair or removal of mechanical, electrical, gas, compressed air, hydraulic, telecommunications, computer or similar services which are normally fixed within or to a structure 3. Construction work does not include mineral exploration and extraction; erecting marquees and tents designed for re-erection; general maintenance of fixed plant, except where it is part of other construction work or large enough to be a structure in its own right, (silo, chemical plant, power station generator or large boiler ; tree planting and horticultural work; positioning and siting of movable partitions and displays; surveying (incl. levelling, measuring, examining); other activities such as offshore, ships etc 4. Notification, using a form F10 (Rev) is required if : a. the project lasts more than 30 days or b. involves more than 500 person days 5. An example of a Form F10 is at Appendix 7. 6. Designers duties always apply regardless of notification 7. The requirement to apply notification for 5 persons or more in the previous CDM Regs (1994) no longer applies. Page 1 of 1 D:\81914333.doc