Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
City of Neola APPLICATION FOR BUILDING PERMIT Before this building permit may be issued, the lot markers and construction area must be flagged _____________________________________________________________________________________________ Date: _________________ Permit No. ________________________ Applicant/Owner: _____________________________________________________________________ Address: __________________________________________ Phone: ___________________________ Contractor’s Name: ____________________________________________________________________ Address: __________________________________________ Phone: ___________________________ Address of property where construction will be done if different than above: _____________________________________________________________________________________ Zoning Classification: ________________________________ Lot Size: __________________________ Work to be completed: Type of work: _____Construct _____Repair _____Remodel _____ New Building _____ Garage _____ Addition _____ Storage Shed _____ Fence _____ Deck _____ Other: ______________________ Description of Construction: _____________________________________________________________ Type of Construction: ___________________________________________________________________ Location of Construction on Property: _____________________________________________________ Estimated Cost: $_________________ Beginning Date: __________________ Estimated Completion Date: ______________________ A site plan showing the location and dimensions of the proposed construction shall accompany this application. The site plan will include the dimensions of the structure and location on the lot with reference to the lot lines. Dimensions will also be needed with reference to other structures on the lot. Designate streets, alleys and direction lot faces. Applicant is responsible for contacting and obtaining clearance from all utilities by call Iowa One Call at 1-800-292-8989. Building materials and any debris from construction must be covered or secured to keep from blowing and littering neighboring properties. Is there utility easements on property? ____________________________________________________ If so, I understand that there is to be no obstruction or building on an easement without the consent of the Planning & Zoning Commission. I understand that there shall be no plantings of any kind in the easements. Is any such plantings occur and it is necessary to dig them up, no compensation will be given. I hereby certify that the above information is correct and that any construction performed under a permit granted in response thereto will be in accordance with all federal, state and municipal building codes. ____________________________________ Signature of Applicant ____________________________________ Signature of Contractor (if applicable) New Construction A fee is required for electric, water and sewer connection, you will need to check with the Water/Wastewater and Electric Superintendent as to the type of materials and connections that need made prior to beginning any work. When electric, water and sewer lines are installed for new building or an addition they shall be inspected by the Water/Wastewater and Electric Superintendent before any fill is replaced or cement is put in place. Connection Fees: _____ $150.00 Electric _____ $100.00 Water Building Permit Fees $1.00 to $500.00 Permit Valuations $500.01 to $2,000.00 Permit Valuations $2,000.01 to $25,000.00 Permit Valuations $25,000.01 to $50,00.00 Permit Valuations $50,000.01 to $100,000.00 Permit Valuations $100,000.01 to $200,000.00 Permit Valuations $200,000.01 to $500,000.00 Permit Valuations Above $500,000.01 Permit Valuations _____ $50.00 Sewer $30.00 $60.00 $100.00 $150.00 $200.00 $300.00 $500.00 $1,000.00 Permit Fee: $__________ _____________________________________________________________________________________ FOR OFFICE USE ONLY Date construction inspected: ___________ Signature: _______________________________________ Date approved by Council: _____________ Amount paid: ____________________________________ __________________________________________________ Mayor