Download Maximum Net Export Capability requested at POI: MW

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Current source wikipedia , lookup

Electric machine wikipedia , lookup

Ohm's law wikipedia , lookup

Pulse-width modulation wikipedia , lookup

Power inverter wikipedia , lookup

Power engineering wikipedia , lookup

Utility frequency wikipedia , lookup

Electrical substation wikipedia , lookup

Rectifier wikipedia , lookup

History of electric power transmission wikipedia , lookup

Three-phase electric power wikipedia , lookup

Electrification wikipedia , lookup

Islanding wikipedia , lookup

Surge protector wikipedia , lookup

Immunity-aware programming wikipedia , lookup

Variable-frequency drive wikipedia , lookup

Power MOSFET wikipedia , lookup

Opto-isolator wikipedia , lookup

Stray voltage wikipedia , lookup

Resistive opto-isolator wikipedia , lookup

Power electronics wikipedia , lookup

Amtrak's 25 Hz traction power system wikipedia , lookup

Distribution management system wikipedia , lookup

Buck converter wikipedia , lookup

Voltage regulator wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Voltage optimisation wikipedia , lookup

Alternating current wikipedia , lookup

Mains electricity wikipedia , lookup

Transcript
Generator Interconnection Agreement
Generating Facility Data For Synchronous Machines
Required Prior to Initial Synchronization
Generating Facility Name:
Maximum Net Export Capability requested at POI:
Gross Generation Capability:
MW (Gross Generation –Station Service)
MW
Station Service Load (Including Losses):
MW and
Mvar
Generating Facility Owner:
Generating Facility Substation GPS coordinates: Latitude
and Longitude
(decimal degrees)
Complete this data form and provide final design data sheets from vendor which show the following
information (the vendor data sheets must be provided) and Single Line Diagrams of facility:
1. Generator Machine Data:
a. Generator base MVA (impedance base for data below):
MVA
b. Rated power factor of generator:
c. Generator rated voltage:
kV
d. Inertia (wK2), including prime mover:
lbs-ft2 or
kW sec/kVA
All applicable reactance values (unsaturated):
e. 1) Xd
2) Xq
3) X'd
4) X'q
3) X2
4) Xo
5) X''d
6) Xlm
Saturated reactance values:
f.
1) X'd
2) X"d
All applicable time constants (seconds):
g. 1) T'do
2) T"do
3) T'qo
4) T"qo
h. Provide all Saturation diagrams for the generator.
Armature winding sequence resistance data:
i.
1) R0
2) R1
3) R2
j.
Neutral Grounding Resistor (if applicable):
(Ohms)
Final design specifications which are a function of either 1) the generator design or 2) the generator
design and the supporting plant auxiliary system
k. Maximum gross power output of turbine at 95 degree ambient temperature:
MW
l.
MW
Minimum gross power output of turbine at 95 degree ambient temperature:
Page 1 of 4
Dated: 7/31/2017
Generator Interconnection Agreement
Generating Facility Data For Synchronous Machines
Required Prior to Initial Synchronization
m. Maximum gross power output of turbine in the range of 50-70° ambient temperature:
MW
n. Minimum gross power output of turbine in the range of 50-70° ambient temperature:
MW
o. Maximum reactive production at maximum MW output at 95° ambient and rated voltage:
MVAR
p. Maximum reactive absorption at maximum MW output at 95° ambient and rated voltage:
MVAR
q. Attach a copy of the unit capability curve at rated voltage and indicate which curve is appropriate
for a 95° ambient day. If necessary to accurately represent expected operating capability on a
95° ambient day, indicate a sufficient number of unit operating points on the manufacturer
supplied unit capability curve.
r.
Generator Cooling (Open air, TEWAC, Hydrogen, etc.):
s. Generator High/Low voltage limits =
/
kV (or pu)
2. Generator Step-up Transformer Data:
a. Attach transformer test reports showing ratings, impedances, available taps, etc.
b. GSU tap is set to
.
Page 2 of 4
Dated: 7/31/2017
Generator Interconnection Agreement
Generating Facility Data For Synchronous Machines
Required Prior to Initial Synchronization
3. Voltage Ride-Through Capability.
Provide voltage ride-through time duration settings (per-unit voltage set point and corresponding ridethrough time), reflecting the settings for the plant level controller. An example of a voltage ridethrough time duration curve for applicable units is provided below for reference.
POI Voltage (pu)
Southern Balancing Area
Voltage Ride-Through Time Duration Curve
PRC-024-1 - Attachment 2
1.3
1.25
1.2
1.15
1.1
1.05
1
0.95
0.9
0.85
0.8
0.75
0.7
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
0
0.5
1
1.5
2
2.5
3
3.5
4
Time (sec)
Page 3 of 4
Dated: 7/31/2017
Generator Interconnection Agreement
Generating Facility Data For Synchronous Machines
Required Prior to Initial Synchronization
4. Frequency Ride-Through Capability.
Provide frequency ride-through capability settings (frequency set point and corresponding ridethrough time), reflecting the settings for the plant level controller. An example of a frequency ridethrough time duration curve for applicable units is provided below for reference.
Southern Balancing Area
Generator Frequency Ride-Through Capability Curve
PRC-024-1 - Attachment 1
63
62
Frequency (Hz)
61
60
59
58
57
0.1
1
10
100
1000
10000
Time (sec)
Page 4 of 4
Dated: 7/31/2017