Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Work plan of KNU for ATF2 Men power E-S Kim S-H Shin H-S Kim Y-S Hwang H-J Kim I-M Hwang : ATF2 Beam dynamics : Design and fabrication of IP-BPM and S-band BPM : Fabrication of IP-BPM : Design and fabrication of IP-BPM electronics (Graduate student) : Design and fabrication of IP-BPM electronics : Experimental studies in ATF partly (New post-doc from March 2007) Budgets - KNU has budgets of FY2006 to FY2008 for the R&D of ILC accelerator (~2000MYen/Y). - KNU will also submit proposals for R&D of ILC accelerator to KOSEF and KRF in March 2007. We expect that the budgets in FY2007 will be increased more than the present and thus we need to consider another R&D items that may be performed after completion of S-Band BPM. - KNU R&D peoples for ILC accelerator and detector have a R&D meeting in 6th Dec.. After this meeting, we may inform more detailed accelerator R&D plans in FY2007. Work plan of KNU for ATF2 (R&D items) Beam dynamics R&D Studies of final optics and beam tuning in ATF2 Experimental studies in ATF Instrumentation R&D IP-BPM - Body : design / fabrication / electrical testing - Electronics : design / fabrication /electrical testing S-band BPM - Body : design / fabrication / electrical testing Work plan of KNU for ATF2 (Schedule) IP-BPM - body : design (S-H Shin) until Dec. 2006 at KEK : fabrication (S-H Shin, H-S Kim) starts in Dec. 2006 at Korea - Electronics : design (Y-S Hwang ) (5 Jan. -25 Feb. at KEK) : fabrication (Y-S Hwang, H-J Kim) starts in March 2007 at Korea S-band BPM - body : design (S-H Shin) (1. Feb.~28 Feb. 2007 at KEK) : fabrication (S-H Shin, H-S Kim) starts in March 2007 at Korea