PROOF OF CONCEPTS
ADDENDUM
TO GILIO’S GENERAL PUBLIC PLAN G FOR FULL EVERGLADES RESTORATION
4.SUBMERGENT AQUATIC VEGETATION AS A LAKE REJUVENATION
PLAN G. ELEMENT 2.
IS THERE ANY PROOF THAT DEMUCKING WILL WORK ?
ST. LUCIE WEST SERVICES DISTRICT’S (SLW) a 298 DISTRICT
EXTENSIVE MULTILAKE MAN-MADE SYSTEM
COMPARED TO LAKE OKEECHOBEE (L.O.)
SIMILARITIES : IN DEPTH, LITTORAL ZONES,
POLLUTANT INFLOWS TO LAKE OKEECHOBEE
DIFFERENCES – #1. L.O. HAS MUCH MORE SEDIMENT MUD ( ~
6000 YRS.) VS SLW 25 YRS.
#2. L.O. STAGES VARY GREATLY VS SLW FAIRLY CONSTANT.
#3. SLW GREATER PLANT COVER
OUTFLOWS OF EXCESS WATER- SLW –ABOUT 40 PPB TP VS.
L.O. - 140 TO 75 PPB TP
HENCE: DEMUCK L.OKEECHOBEE LEADS TO LAKES.
SIMILAR TO SLW IN WATER QUALITY FROM NATIVE
PLANT GROWTH. THIS IS AN ESSENTIAL WATER QUALITY
MECHANISM AS NATURE INTENDED.
MONTHLY PPB TP DISCHARGES IN
ALL ST. LUCIE WEST(SLW) LAKES WITH UNDERWATER PLANTS
FROM J. GILIO MANUSCRIPT IN PREP. DATA USED WITH PERMISSION ST. LUCIE WEST SERVICES DISTRICT
PPB TP
PPB TP
Hypereutrophic
LAKE OKEECHOBEE
180
ST. LUCIE WEST
67
Hypereutrophic >100
Eutrophic 30-100
Mesotrophic 10 -30
oligotrophic < 10
EPA/FDEP LIMIT
INTO ENP @10
NOTE. DETECTION
LIMIT ANALYSIS TP
SLW = 40 PPB. THUS
67 REALLY ~40—50.
SLW LAKES HYDROGEOMORPHICALLY SIMILAR TO LO. MEAN DEPTH 8 FT., SAV’S,
EAV’S SIMILAR, HIGH NUTRIENT INPUTS (7,500 HOMES @ 0.75 LBS./1000 SQ.FT.
FERTILIZER/ YR APPLIED. DIFFERENCES – SLW LAKES POLYMICTIC TO DIMICTIC,
LOWER FETCH, YOUNGER, LESS ANOXIC AREA.
Element 3.
SUCK THE MUCK FROM LAKE OKEECHOBEE
Approximately 100 MILLION METRIC TONS
(220,000,000 LBS.)
PHOTO SOURCES SFWMD, CALCULATION BY J. GILIO
MUCK DEPTH AVERAGES 30 CM
TP AVERAGES ABOUT 1200 PPM
16.
ELEMENT 2.
DEMUCK LAKE OKEECHOBEE
ANNUAL WATER INFLOW , TP INFLOW AND TDML GOAL [1974-2013]
TOP LEFT GRAPH SHOWS NON-ATTAIMENT OF TDML OF TOTAL PHOSPHORUS OVER A 40 YR. SPAN. BOTTOM
RIGHT GRAPH DENOTES AN HISTORICAL INCREASE OF TP IN LAKE OKEECHOBEE LEGACY SEDIMENT. Modified
from sfwmd.
TOP
ELEMENT 3. muck removal conclusion
MUCK REMOVAL FROM LAKE OKEECHOBEE
&/OR LIMITED ALUM TREATMENT
•
ADVANTAGES TO REDUCE TP LEVELS
1st SERIAL TREATMENT TRAIN (STT) IS FULL KISSIMMEE RIVER
RESTORATION TO DATE A 5 YR. TP REDUCTION ~ 40% @ HIGH VARIANCE.
•
•
•
•
•
•
•
MAJOR IMPROVEMENT IN-LAKE WATER QUALITY LEAVING LAKE @
SPILLWAY/WEIR FROM ~120 to 80 PPB TP (2014) TO ~ 40 PPB TP.
(2ND STT) ~ 70 to 50% POLLUTANT REMOVAL
•
•
ADVANTAGES TO LAKE OKEECHOBEE ECOLOGY
IMPROVED LAKE WQ AS LAKE REJUVENATION  INCREASED
WATER TRANSPARENCYDEEPER DEPTH SAV’S & EPIPHYTES ->
TP UPTAKE. INCREASED FISH HABITAT AREA, RECREATIONAL USE.
REDUCED POLLUTANT LOADS IN WATER--LESS TOXIC ALGAE
BLOOMS.
•
•
RECYCLE & JOB ADVANTAGES
POTENTIAL RESOURCE RECOVERY OF DRIED MUCK AS TOPSOIL
(SOD FARMS, ETC.) AS NEW INDUSTRY.
3RD STT IS 23,000 AC. TREATMENT WETLAND. TP REDUCTION ~ 40%
FROM 50 TO 30 PPB TP
•
•
4TH STT IS BOLLES LAKE TO BE CONSTRUCTED SIMILAR TO LAKES @
ST. LUCIE WEST BUT WITHOUT ADDED FERTILIZER. POSSIBLE THAT
~INFLOW @ 30 TO OUTFLOW AT 25 PPB TP.
5TH STT IS OVERFLOW INTO 32,000 AC. TREATMENT WETLAND.
EXPECTED DECREASE FROM 25 TO 15 PPBTP INTO CEPP’S FEB A/B.
IF 15 PPB TP ACHIEVEABLE AND SUSTAINED, THEN NATURAL
HYDROPERIODICITY FLOW MAY BE BETTER THAN STA’S & FEB’S TO
INCREASE VOLUME HENCE POSSIBLY REMOVED.
REDUCED SUSPENDED SOLIDS IN FUTURE DISCHARGES, EAST, WEST
& SOUTH.
CRITICAL ASSUMPTIONS
# 1.STA TREATMENT RESULTS IN STA ¾ ACHIEVED 14 PPB TP
[ANNUAL GEOMETRIC MEAN]CHEN, ET AL., 2013 AND THAT
LONGER RESIDENCE TIME, LOWER TP LOADING RATE AND
LOWER INPUT CONCENTRATION WILL REACH THE 10 PPB
LEVEL. # 2.REMOVED MUCK DRIED AND FINAL DEPOSITION ALL
OUTSIDE OF HYDROLOGICAL PLAN 6X FLOW WAY.
•
•
MAJOR QUESTION
TP IN L.O. REMAINS PROBLEMATIC AND SUBJECT TO EXTERNAL
STRESSORS SUCH AS TP INFLOWS >TMDL AND RESUSPENSION
OF LEGACY SEDIMENT TP.
•
•
•
•
DISADVANTAGES
LONG TERM ~ 20 YRS.
COSTS BETWEEN $1 TO $3 BILLION.
LOCALIZED TEMPORARY SEDIMENT DISTURBANCE.