Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
REPORT NUMBER DO-30571 TE/CRG TITLE Supply and installation of two vacuum insulated transfer lines for cold nitrogen CERN Abstract This technical specification concerns the design, manufacturing, supply and installation of a liquid nitrogen vacuum insulated supply line, and a gaseous nitrogen vacuum insulated exhaust line for a new cryogenic test facility currently under construction in building 180 at CERN. Deliveries are foreseen over four months from notification of the contract. To be considered for this Price Enquiry, the bidder shall have proven experience of at least five years in the design and manufacture of vacuum insulated transfer lines, both flexible and rigid, covered by multilayer insulation, and their installation on the client’s premises. To prove the experience, the bidder shall provide at least three references of project which are similar in scope and complexity during the last five years. Start Time 18-May-17 End Time 08-Jun-17 Cost Range ILO - <200K ACTIVITY CODE 06020205 Main Category Vacuum and low temperature Sub Category Low-temperature Category Storage and transport of cryogens Section Vacuum insulated transfer line İhale Dokümanlarını İncelemek için TIKLAYINIZ REPORT NUMBER DO-30645 TE/LHC TITLE Supply of enamelled vacuum flanges CERN Abstract The purpose of this price enquiry is the award of a contract for the supply of enamelled vacuum flanges (hereinafter referred to, in whole or in part, as the “supply”) in accordance with the price enquiry documents. -- Material Raw material (stainless steel 304L) is not supplied by CERN. -- Manufacturing The contractor shall be responsible for the production of its own manufacturing drawings, applicable to its organization and production methods, in order to produce parts in compliance with CERN technical drawings. The main steps for the manufacture: 1. Rough machining; 2. Stress relieve by heat treatment according to the Annex 1; 3. Finishing of external diameters; 4. Enamelling; 5. Finishing of internal diameters. Start Time 18-May-17 End Time 07-Jun-17 Cost Range ILO - <200K ACTIVITY CODE 06010501 Main Category Vacuum and low temperature Sub Category Vacuum Category Vacuum flanges Section High Vacuum (HV) flange İhale Dokümanlarını İncelemek için TIKLAYINIZ REPORT NUMBER DO-30532 TE/HL/LHC TITLE Supply of universal expansion joint assemblies for the bypass cryostats CERN Abstract This technical specification concerns the supply of 54 universal expansion joints of internal diameters between 50 mm and 80mm and about 2m length for the series of the bypass cryostats of the High Luminosity LHC project at CERN. Deliveries are foreseen over six months from placement of the contract. The firm shall have a proven experience in the design, production and testing of universal expansion joints assemblies and shall give at least three references of projects which are similar in scope, complexity and volume during the last three years. Start Time 18-May-17 End Time 13-Jun-17 Cost Range ILO - <200K ACTIVITY CODE 06010102 Main Category Vacuum and low temperature Sub Category Vacuum Category Vacuum bellows Section Formed - circular İhale Dokümanlarını İncelemek için TIKLAYINIZ