Survey
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
UGANDA 1. 2. 3. 4. GENERAL OPERATING ENVIRONMENT ENERGY AND RENEWABLE ENERGY ENVIRONMENTAL GOVERNANCE ORGANIZATIONS, SOURCES, REFERENCES 2 (27) UGANDA report -1GENERAL OPERATING ENVIRONMENT 1.1 Basic Facts & Geography 1.2 People & Society 1.3 Culture & Business Culture 1.4 Infrastructure & Logistics 1.5 Government & Legislation 1.6 Economy & Trade 1.7 Uganda & Finland 1.8 Education 1.9 General Operating Environment - Summary 3 (27) UGANDA report 1.1 BASIC FACTS & GEOGRAPHY Location Area Borders Climate Terrain East-Central Africa 241 550 km2 (82 % land, 18 % water) West: Democratic Republic of Congo (765 km) North: South Sudan (435 km) East: Kenya (933 km) South: Tanzania (396 km), Rwanda (169 km) Tropical Mostly plateau with rim of mountains Source: CIA, World Bank The country is located on the East African plateau. It averages about 1,100 metres above sea level, and this slopes very steadily downwards to the Sudanese Plain to the north. However, much of the south is poorly drained, while the centre is dominated by Lake Kyoga, which is also surrounded by extensive marshy areas. Uganda lies almost completely within the Nile basin. The Victoria Nile drains from the lake into Lake Kyoga and thence into Lake Albert on the Congolese border. It then runs northwards into South Sudan. One small area on the eastern edge of Uganda is drained by the Turkwel River, part of the internal drainage basin of Lake Turkana (Wikipedia.) Although generally equatorial, the climate is not uniform as the altitude modifies the climate. Southern Uganda is wetter with rain generally spread throughout the year. Uganda has substantial natural resources, including fertile soils, regular rainfall, small deposits of copper, gold, and other minerals, and recently discovered oil (World Bank). Agriculture is the most important sector of the economy, employing over 80% of the work force. 1.2 PEOPLE & SOCIETY Population, total Population, growth Population, density Urban population Rural population Population (0-14 years) Population (15-64 years) Population (65 years and above) Life expectancy at birth Major cities(2009) 2009 2010 32,37 mill 33,42 mill 3% 3% 2 162/ km 167/ km2 15 % 15 % 85 % 85 % 49 % 48 % 49 % 49 % 2% 3% 53 54 Capital: Kampala (1,5 mil ) Other: Gulu ( 0,2 mil), Lira (0,1 mil) 2011 34,51 mill 3% … 16 % 84 % 48 % 49 % 3% 54 Source: CIA, World Bank Population of Uganda is about 33 million and it is growing by approx. 3,5 % every year (CIA World Fact Book) Population growth rate is among the highest in the world. Uganda has the second highest total fertility rate in the world, at 6.65 children born/woman (2012 estimates) (Wikipedia). 4 (27) UGANDA report Labour force of population covers 16 million people. The average age in Uganda is relatively low – almost 50% of Ugandans are under 15 years. Life expectancy at birth was 53 years in 2011 (World Bank ). Uganda is one of the poorest nations in the world. 35 % of population lives below poverty line (CIA World Fact Book). Most of the people live on rural areas. Only about 13 % of total population lives in urban areas. Uganda is at the same level as the average for Sub-Saharan Africa in political rights and civil liberty but fares worse in political stability (World Bank). 1.3 CULTURE & BUSINESS CULTURE Language Ethnic groups Religion Official: English Other: Ganda or Luganda, other Niger-Congo languages, Nilo-Saharan languages, Swahili, Arabic Baganda (17%) Banyakole (10%) Basoga (8%) Bakiga (7 %) Iteso ( 6 %) Langi (6 %) Other small ethnic groups (46 %) Christian (84%) Muslim (12%) Other (4%) Source: CIA, World Bank, OECD Uganda is home to many different ethnic groups, none of whom forms a majority of the population. Around forty different languages are regularly and currently in use in the country. English became the official language of Uganda after independence. Swahili, a widely used language throughout eastern and central East Africa, was approved as the country's second official national language in 2005,[45] though this is somewhat politically sensitive (Wikipedia). Ugandan business decisions are often made by a group within the company and there is a premium on consensus. Many Ugandans like to discuss business extensively, and usually seek external advice, before making decisions. When negotiating, companies will respond to your approach in an equal manner. Therefore, if a potential partner demonstrates flexibility and willingness to commit, they will gladly put the same effort into the partnership. Personal contact with potential and existing partners/clients and regular visits to the market therefore of the utmost importance and it is natural for the business relationship to be built with time (Ugandan UK Convention 2012). 5 (27) UGANDA report 1.4 INFRASTRUCTURE & LOGISTICS Railways: Roads: Waterways: Airports: 1 244 km 71 000 km (total) 13 300 km (maintained – 33%) Rivers: There are no long navigable stretches of river in Uganda Ports: Entebbe, Jinja, Port Bell Total: 46 (5 paved) Source: CIA, World Bank, OECD The country‘s infrastructure—including energy, roads, and telecommunication—lags behind that of its neighbours and has been identified as a major binding constraint requiring immediate remedy. With regard to road transport, the focus will be on the construction, upgrading, rehabilitation and maintenance of critical roads that are important to promote production, competitiveness and regional trade. The road infrastructure provides for over 90% of passenger and freight traffic. Only about 25% of national roads are paved. This is further aggravated by the dilapidated status of the rail network of which only 26% is functional. Access to clean water and sanitation remains low in both urban and rural areas. Access to electricity remains very low due to limited national power grid coverage and low generation capacity. With regard to social infrastructure, the focus will be on rehabilitation of health facilities in recognition that the country has a high disease burden especially in communicable diseases. Roads are most commonly used in transportation and they carry over 90% of all traffic. The road network is about 70,750 kilometres, of which 16,300 kilometres is paved. Most roads radiate from Kampala. Uganda has road and rail links to Mombasa, Kenya. The country has over 1000 kilometres of railways which are rarely used. There are also 5 airports with paved runways (Finpro). 6 (27) UGANDA report 1.5 GOVERNMENT & LEGISLATION Official name Conventional short form Form of state Regions and districts Government Legal system Independence Corruption perception index (2011) Republic of Uganda Uganda Unitary presidential constitutional republic 112 districts President: Lt. Gen. Yoweri Kaguta MUSEVENI Cabinet: Appointed by the president among elected legislators Parties: a multi-party political system Mixed (English common law/Customary law) 9 October 1962 (from the UK) 143 (out of 183 countries) Source: CIA, World Bank Uganda is divided into districts, spread across four administrative regions: Northern, Eastern, Central (Kingdom of Buganda) and Western Uganda‘s institutional framework is characterized by several coordination failures, corruption in public delivery system and generally endemic malaise in most of the public sector departments. These challenges have constrained planning and budgeting processes leading to inefficient resource allocation and poor public service delivery outcomes. The President of Uganda, currently Yoweri Kaguta Museveni, is both head of state and head of government (Wikipedia). Uganda is rated among countries perceived as very corrupt by Transparency International. It is rated at 2.4 on a scale from 0 to 10 (0 stands for most corrupt, 10 for clean). It is ranked as 143rd country out of other countries by Transparency International. One should avoid travelling to the Karamoja-area and to use a plane if going to the Kidepo Valley. Unnecessary travel to northern and north-eastern parts of the country should be avoided because the area has been in the hands of the unstable Lord's Resistance Army’s (LRA) rebel group. Also eastern parts of Uganda to the north from Mount Elgon are dangerous. One should also avoid the bordering regions of DRC and Rwanda and the Semliki national park. Before travelling to Bundibugyo one should check the security situation from local officials (Finpro). 7 (27) UGANDA report 1.6 ECONOMY & TRADE World bank ranking Currency GDP (current US$) (billions) Structure of the economy (% of GDP) - Agriculture - Industry - Services GDP growth (annual %) GNI per capita, PPP (current intl.) Inflation, consumer prices (annual %) Ease of doing business ranking Low income Ugandan shilling (UGX) 2009 $ 15,80 25 % 26 % 49 % 7% $ 1210 13 % 111 (out of 181) 2010 $ 17,20 2011 $ 16,81 25 % 25 % 50 % 6% $ 1250 4% 112 (out of 178) 24 % 25 % 51 % 7% $ 1320 19 % 122 (out of 183) Source: CIA, World Bank Uganda has substantial natural resources, including fertile soils, regular rainfall and sizable mineral deposits of copper and cobalt. The country has largely untapped reserves of both crude oil and natural gas. Agriculture is the most important sector of the economy, employing over 80 % of the work force. The GDP per capita (US dollar) in Uganda was last reported at 508.93 in 2010 (World Bank Data). Uganda is measured as low-income country by GNI: The GNI per capita; Atlas method (US dollar) in Uganda was last reported at $500 in 2010 (World Bank). As a landlocked country situated about 800 km from the Indian Ocean, the country has to rely on its neighbours, particularly Kenya for critical access to the world markets for its exports and imports (CIA) The gross public and private investment growth rates are both projected to increase. Moreover, economic growth has been export-led with the share of exports to GDP rising steadily through the last two decades. But the expanding regional market for Uganda‘s food has for the last five years boosted agriculture. The industrial sector (manufacturing, construction and mining) has improved from the previous near collapse during the turbulent 1980s and accounted for 25% of GDP in 2008/09. The country is a member of the East African Community (EAC) and Common Market for Eastern and Southern Africa (COMESA). The authorities recognize foreign trade as an important stimulus for economic growth and its trade policies aim to contribute to poverty reduction, promotion of employment and diversification and promotion of exports particularly of non- traditional products. These policy objectives have been pursued through continuing liberalization, deregulation, privatization and participation in regional agreements, particularly the EAC. In 2008/2009, Uganda‘s tax-to-GDP ratio was 12.2% of GDP, lower than the 20% average for Sub-Saharan Africa and that of Tanzania and Kenya at 15% and 22%, respectively. 8 (27) UGANDA report Oil production is expected to commence in 2015 with the processing of up to 40,000 barrels of oil per day into diesel, kerosene, and heavy fuel oil that can be used to generate electricity but limited production is expected to start in 2010 mainly targeting power production from gas. In 2011 the economy experienced a perceptible slowdown but real Gross Domestic Product (GDP) growth is projected to improve in 2012 and 2013 (African Development Bank). 1.7 UGANDA & FINLAND Finnish exports (2011) Finnish imports (2010) 1, 9 mill € (Machinery and equipment; paper and paper products) 1, 4 mill € (Vegetables and fruit) Source: Finnish Customs Trade between Finland and Uganda has been modest. The biggest export products are electric machinery, office machines, telecommunication and sound recording machines and paper and paper products. Imported products from Uganda to Finland are mainly vegetables and fruit. 1.8 EDUCATION Literacy rate, % of people ages 15 and above, 2010 Primary school enrolment, % net, 2009 Higher education: 73 % 94 % (95 % female, 93 % male) Makere University in Kampala (biggest) Source: World Bank Illiteracy is common in Uganda, particularly amongst females. Adult total (% of people ages 15 and above) in Uganda was last reported at 73.21 % in 2010. Public spending on education was at 5.2 % of the 2002–2005 GDP (World Bank Data). The School enrolment; primary (% net) in Uganda was last reported at 90.87 in 2010, according to World Bank. The system of education in Uganda has a structure of 7 years of primary education, 6 years of secondary education (divided into 4 years of lower secondary and 2 years of upper secondary school), and 3 to 5 years of post-secondary education. The present system has existed since the early 1960s (Wikipedia). Although 60,000-70,000 students per year leave school qualified to go on to higher education, only some 35% of them (at most 25,000) are able to find places at the limited number of institutions. Makerere University in Kampala (MUK) accepts some 95% of the total student population in Uganda's universities (Wikipedia). UGANDA report 9 (27) 1.9 GENERAL OPERATING ENVIRONMENT - SUMMARY Instability in southern Sudan is a risk for the Ugandan economy in 2012 because Uganda's main export partner is Sudan, and Uganda is a key destination for Sudanese refugees. Uganda’s Human Development Index (health, education and income) value for 2011 is 0.446—in the low human development category—positioning the country at 161 out of 187 countries and territories (United Nations Development Programme) Poverty levels have declined from 56% in 1991/92 to 31.3% in 2005/06 and Uganda is expected to meet the Millennium Development Goal (MDG) target of halving the poverty rate by 2015. The mineral wealth has the potential to generate increased private sector investments and lasting benefits to the country. The civil strife in Northern Uganda that was perpetrated by the rebel Lord‘s Resistance Army (LRA) seems to have come to an end. This will allow for the re-integration of Northern Uganda with the rest of the economy, and is expected to contribute significantly to economic growth particularly given this region‘s agricultural and mineral potential. 10 (27) UGANDA report -2ENERGY & RENEWABLE ENERGY 2.1 General Situation in Energy Sector 2.2 Energy Policy 2.3 Renewable & Fossil Energy Resources 2.4 Supply & Demand for Energy Solutions 11 (27) UGANDA report 2.1 STATE OF ENERGY SECTOR Total energy consumption: Energy consumption per capita: Electricity consumption: Electricity consumption per capita: Access to electricity: Access to electricity urban population Access to electricity rural population Energy imports (% of energy use) Electricity imports (% of electricity use) Power production capacity: Hydro power production capacity: Electricity production: Hydro electricity production: Share of population using solid fuels: Fossil fuels % of total energy 2009 1990 130 TWh 4,02 MWh/capita 2,07 TWh 0,62 TWh (2000) 68 kWh/capita 9% 5,6 % (1991) 41,8 % (2006) 2,9 % (2006) 2,7 % (2002) 6 % (all petroleum products) -8 % (180 GWh) -115 GWh (2000) 573 MW 159 MW 395 MW 155 MW 2,19 TWh 1,47 TWh 0,77 TWh > 95 % 5,94 % NA (IEA, World Bank, IRENA, UN data, indexmundi.com) Major sources of commercial energy in Kenya are hydropower, petroleum and biomass based energy. Even 95 % of population use traditional solid fuels such as fuel-wood and charcoal in residential sector for heating, light and cooking. Further development of the use of biomass and extension of national electricity grid would reduce this consumption greatly. The lack of diversity in energy sector makes Uganda vulnerable. Self-sufficiency Uganda imports all its petroleum products and there is, as yet, no production in the country; although some local production is expected to begin soon. Petroleum sector is highly vulnerable to political conflicts that may arise in neighbouring countries. Imports come primarily through Kenya (85%) and Tanzania (15%) via trucks. These products account for a significant percentage of the country’s per capita income. Fuel imports in 2009 were US$ 125 million, or 2.9% of total imports. This represents about 4.3% of the total export earnings in 2008/2009. st In the beginning of 21 century Uganda has been net exporter of electricity even though power cuts are common within the country itself. RE could be a sustainable option for a land-locked country with the 6th highest fuel import costs in the world. Electricity availability 9 % of the population had access to electricity in 2009. Only 3% of rural people and 42% of urban people have access to electricity. The transmission network of the country consisted of 1,161.6 km of 132 kV lines, with the distribution network operating at 33 kV. (Reegle Country Profile) 12 (27) UGANDA report Electricity capacity Government prefers to use the BKS Acres Ltd electricity demand projections High case-scenario for 20022025 as the planning tool for future development. Depending on scenario electricity consumption and peak demand will be growing 4-9% annually. The Electricity Supply Situation in Uganda and Future Direction (link) Uganda’s electricity supply depends mainly on hydropower from the Nile. Due to this dependence, the country is facing severe climate change-related risks. Recent persistent droughts have reduced hydropower production from 340 to 140 MW. According to the ERA, the country’s regulator, actual power generation stands at around 400 MW, from an installed capacity of approximately 550 MW. Power shortages have been compensated by installing numerous off-grid systems, and recently a 150 MW grid thermal power system, at the exceptionally high cost of 0.27 US$/ kWh. Commercial losses are at roughly 35% due to poorlymaintained lines. The highly-centralised nature of the country’s electricity infrastructure and the continuing high costs of investment in the large-scale power sector for low population outreach, are hampering further development. Uganda produces small amount of electricity from biomass in sugar industry co-generating of electricity and heat from bagasse. Where the grid is unavailable electricity is generated with diesel generators, batteries and solar photovoltaic systems (PV) run by individuals and businesses. In addition to privately owned generators, government operates diesel generators to meet the energy needs of some rural towns not connected to the grid. There is a need to broaden and diversify power production in Uganda, and to design systems that will provide power to local communities. (Reegle Country Profile), (MBendi), (Helio - Energy Systems) Source: IEA Country Energy Balance, 2009 13 (27) UGANDA report 2.2 ENERGY POLICY Energy policy publications Organizations responsible for energy policies Targets to increase use of renewable energy Subsidies/ Incentives for Renewable Energy The National Energy Policy 2002, Renewable Energy Policy 2007 The Ministry of Energy and Mineral Development increase modern renewable energy share from 4 % (2007) to 61 % (2017) Feed-in Tariffs for renewables The Electricity Act 1999 (link) This act enabled private participation in the electricity sector, and established the Electricity Regulatory Authority (ERA) as the energy regulator for the country. The Act legislated for the unbundling of the former UEB into the three utility groups operating today. The National Energy Policy 2002 (link) The policy goal in the energy sector is to meet the energy needs of the Ugandan population for social and economic development in an environmentally sustainable manner. Specific objectives under the energy policy include assessing the availability and demand of energy resources in the country, improving energy service access to reduce poverty, improve governance in the energy sector and institute improved administrative procedures, and stimulate the economic development of the energy sector, whilst minimising environmental impacts. Renewable Energy Policy 2007 (link) Uganda’s renewable energy policy published by the Ministry for Energy, Minerals and Development (MEMD) in 2007 goal is: “To increase the use of modern renewable energy, from the current 4% to 61% of the total energy consumption by the year 2017”. Its objectives include affordable and reliable energy services as a contribution to poverty eradication. One area is enhancing the modernisation of biomass conversion technologies. The RE Policy establishes a Standardised Power Purchase Agreement and FiT for RE generation projects. Renewable Energy and Energy Efficiency Policy acknowledges a number of key areas for energy efficiency 2 improvements by 2017 including increasing solar water heater installations to 30,000 m , and implementing industrial energy auditing and the dissemination of efficient equipment to industries. Subsidies/Incentives for Renewable Energy Energy planning is guided by The Rural Electrification Strategy and Plan (link) covering the period 2005 to 2011. The objectives of the plan are to achieve equitable regional distribution of energy, maximise the economic, social and environmental benefits of rural electrification subsidies, promote expansion of the grid and development of off-grid electrification, and stimulate innovation within electricity suppliers. Specific objectives of the plan over the previous 2010 plan are to increase the financial resource base available for UGANDA report 14 (27) rural electrification by US$ 40 million per annum, as well as increasing new grid connections by 40,00050,000 per annum. The Renewable Energy Policy establishes a Standardised Power Purchase Agreement and Feed-in Tariffs for renewable energy generation projects. It introduces favourable financial and fiscal regimes for renewable energy technologies, including: preferential tax treatment or tax exemption, accelerated depreciation, provision of risk mitigation mechanisms and credit enhancement instruments, credit mechanisms for renewable energy consumers. In 2011 Uganda announced sophisticated Feed-in-Tariff Program (link) Other The Promotion of Renewable Energy and Energy Efficiency Programme (PREEEP) (link) is a key project by the Ministry of Energy and Mines in collaboration with the German Development Cooperation (GTZ), now the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ), to promote energy efficiency and renewable energy. The government is also promoting the use of energy saving bulbs by distributing approximately 800,000 of them to low-income households. Uganda was included in the 2005 Energy, Environment and Development Network for Africa (AFREPREN/FWD) and Heinrich Böll Stiftung (HBF) study. Uganda, as of September 2011, is also a potential member targeted to join the Eastern African Power Pool (EAPP) (link). Specific objectives of the organisation include optimization of the usage of energy resources available in the COMESA region, increasing power supply in the region, the reduction of electricity production costs and the creation of an environment that is conducive for investment. Energy for Rural Transformation APL-2 (GEF) (link). Objective of the Second Energy for Rural Transformation (ERT II) Project is to increase access to energy and ICTs in rural Uganda. Uganda Power Sector Development Project (link); in 2007, the World Bank approved funding for the Power Sector Development Operation Project at a cost of US$ 304 million. Its primary objectives are reducing shortterm power shortages and financial imbalances, and longer-term expansion of electricity service. National Development Plan 2010-2014/15; The current NDP sets forth a number of development objectives for the energy sector, in terms of generation facility construction, transmission network extension, the promotion of energy efficiency in the supply side, the strengthening of the institutional and regulatory framework for energy, and the promotion of renewable and atomic energies. Specific areas of action within the Plan include the construction/study and design of the Bujagali, Karuma, Ayago and Arianga large hydropower projects, with a potential capacity of 2,050 MW; the construction of 150 MW of small-hydro capacity, the expansion of the transmission grid to 2,750 km with support for 220 kV and 400 kV operation, the reduction of commercial and technical power losses to 16%, and strengthening of the institutional and human capacity of the energy sector. National Oil and Gas Policy for Uganda (link). The policy goal is to use the country’s oil and gas resources to contribute to early achievement of poverty eradication and create lasting value to society. (Reegle Country Profile) 15 (27) UGANDA report 2.3 RENEWABLE AND FOSSIL ENERGY RESOURCES Significant renewable energy resources Proven oil reserves Wide renewable energy resources 1 000 mil BBL (est. 2011) OPEC Solar energy Uganda has an average of 5-6 kWh/m2/day of solar insolation, with an average of 8 sunshine hours per day, yearly, indicating an excellent potential for solar energy use. Solar energy is currently used primarily for offgrid electrification for rural communities, as well as for solar cooking, and providing water heating and power to public buildings, for example hospitals. An estimated 200 MW of potential electrical capacity are available in Uganda, and currently, a 50MW solar thermal plant, at Namugoga in Wakiso District outside of Kampala, is being investigated by a private firm, Solar Energy for Africa. Solar cooking also holds a significant potential in the country, with a large number of the population living in well-insolated areas, without access to energy services. Currently a solar unit that can be used for lighting and probably to run a radio set costs about US $ 550; a price that is unaffordable to many Ugandans whose annual per capita income is estimated to be less than US$ 350. Moreover, because most of the solar businesses are located in Kampala (the capital) rural towns have a problem accessing solar technologies. Activities in up country districts are on and off with very few programmes in place to disseminate solar energy countrywide. (Reegle Country Profile), (Helio - Energy Systems) Wind energy The average wind speed in Uganda is about 3 metres per second. Wind energy is promising in Uganda, especially along lake shores, hills and the northern flatter parts of Uganda that experience wind speeds of more than 6 m/s that can operate wind turbines. Pereira da Silva et al. (1999) noted that analysis that have been conducted in the country indicate that there are areas where wind speeds could support power generation. But on the whole, wind energy has not been widely used, possibly because of the limited awareness on the way wind energy could be used to produce electricity. A recent study, conducted in conjunction with the ERA, has confirmed that electricity generation through wind is feasible, especially in small industries and in rural areas. (Reegle Country Profile, Uganda Solar Energy Study, Developing Renewables: Uganda Country Study) Biomass energy Bioenergy, apart from hydropower, is considered to be the second significant pillar to secure energy supply, particularly in rural areas. The transition from traditional biomass, which is often perceived as inefficient, to modern biomass and biofuel production and consumption is a main focal area of the government. Kakira Sugar Works (1985) Limited and Kinyara Sugar Limited are both licensed to generate electricity for sale to the national grid from bagasse, providing 12 MW and 5 MW respectively in 2010. Biomass cogeneration from agricultural wastes is seen to hold particular promise as a technology for the country, and a significant peat UGANDA report 16 (27) resource also exists, of which approximately 25 million tonnes is feasibly available for power generation, equivalent to 800 MW of potential capacity for 50 years. A limited program of biogas digester distribution was undertaken in the 1990s, and 50 digesters were installed in five districts in the country by 2004. (Reegle Country Profile) Geothermal energy Uganda has an estimated geothermal resource potential of 450 MW, mainly located in the Western Rift valley part of the country (Katwe Kikorongo, Buranga and Kibiro). Feasibility studies are recommended to improve confidence in the resource and promote development. (Reegle Country Profile, Microearthquake Survey at the Buranga Geothermal Prospect, Geothermal Energy in the Development of Uganda) Hydropower Despite Uganda’s vast hydropower potential, estimated at 3000 MW, less than 10% is currently exploited. Bujagali, the third large hydropower plant on the Nile River is currently under construction, with an anticipated capacity of 250MW. Numerous other hydropower ventures are being investigated by both Ugandan and Japanese contractors, as well as the government. A number of small hydropower plants, with total installed capacity of slightly over 15MW, are in operation in various parts of the country, with a further 60 MW of projects in the development stage. An estimated 1,300 MW of large hydropower and 51.7 MW of small-hydro capacity are yet to be developed in Uganda. (Reegle Country Profile) 2.4 SUPPLY & DEMAND FOR ENERGY SOLUTIONS Households Heat for cooking and warm water Power for lighting, communication and electronics Commercial and public services - including healthcare, education, administration, business Power, heat and cooling Infrastructure - including water supply, sanitation, communication, waste management Power, heat and fuels Traffic and transportation Fuels and power for vehicles UGANDA report 17 (27) Agriculture fuels for vehicles Fertilizer Power and heat for processing crop Industry Heat, cooling and power Tourism - including resorts, lodges etc. Heat, cooling, electricity, warm water Competition Feed-in Tariffs for renewable energy generation projects supports implementation of renewable energy solutions After unbundling, the government proceeded with the process of privatisation. The generation concession license was competed for and won by Eskom Ltd. (link), which took over in April 2003. Umeme Ltd. (link) won the distribution concession, and took over in March 2005. UETCL is the System Operator, the bulk supplier and single buyer of power for the national grid in Uganda. It is the purchaser of all independently generated power in the country that is fed into the national grid. Under the contractual fiscal regime currently operated in the oil and gas sectors, the ownership of the petroleum resource remains with the Government, and the international oil and gas companies are simply contracted as well as licensed by the Government to extract and develop the resource on the Government's behalf, under a production sharing agreement (PSA). (Reegle Country Profile) 18 (27) UGANDA report -3ENVIRONMENTAL GOVERNANCE 3.1 Description of Environmental Governance 3.2 Environmental & Social Requirements for Projects UGANDA report 19 (27) 3.1 DESCRIPTION OF ENVIRONMENTAL GOVERNANCE The Ministry of Environment and Water has an overall responsibility for environmental issues in Uganda. The Ministry has also a Climate Change Unit that facilitates Uganda’s participation in the UNFCC Clean Development Mechanism. The National Environment Management Authority (NEMA) is responsible for coordinating, monitoring, regulating and supervising environmental management in the country. They also supervise EIA activities. Environmental governance has been decentralised in Uganda to the local (regional) level. Uganda has been praised for the decentralisation aimed at empowering local populations, but according to Oosterveer and Van Vliet (2009, 286) the decentralization also has its problems. Three specific tensions are identified: 1. The tension between technical staff and locally elected officials who legitimately claim they represent their constituents. These constituents do not always support the introduction and implementation of environmental protection measures. 2. The tension between different levels of government, particularly between the district level and the national level. 3. The tension between environmental and natural resource management and other policy domains such as health, education, agriculture, and economic development. Environmental considerations must become a part of mainstream local policies and must compete for limited financial resources. In case of environmental impact assessments the decentralization has been executed in the form of privatization. The execution of environmental impact assessments and environmental impact studies are undertaken by developers themselves or by private consulting firms hired by these developers. (Oosterveer & Van Vliet 2010, 288). Uganda has participated in CDM projects, and more are under validation. According to Pöyry evaluation (2009), there are, however, few active CDM project developers and a lack of capability and financial resources to carry projects through the project cycle. This has resulted in projects getting stuck in the CDM process and only two being registered with the UNFCCC. 3.2 ENVIRONMENTAL & SOCIAL REQUIREMENTS FOR PROJECTS The National Environment Impact Assessments Regulations from 1998 include, among other things, terms of reference for EIAs, requirements for public participation, description of the review process and information on postassessment audits. The National Environment (Audit) Regulations state the requirements for persons performing audits. Environmental auditors must be certified and registered at National Environment Management Authority (NEMA) (link). UGANDA report 20 (27) Projects requiring an EIA are listed in the National Environmental Act (link). The most relevant ones from the point of view of renewable energy are: General an activity out of character with its surroundings; any structure of a scale not in keeping with its surroundings; Major changes in land use. Forestry-related activities timber harvesting; clearance of forest areas; reforestation and afforestation, Agriculture large-scale agriculture; use of new pesticides; introduction of new crops and animals; Use of fertilizers. Electrical infrastructure electricity generation stations; electrical transmission lines; electrical substations; Pumped-storage schemes. Waste disposal sites for solid waste disposal; sites for hazardous waste disposal; sewage disposal works; major atmospheric emissions; offensive odours. 21 (27) UGANDA report -4ORANIZATIONS, SOURCES, REFERENCES 4.1 Organizations & Funding Possibilities 4.2 Sources of Information, References & Links UGANDA report 22 (27) 4.1 ORGANIZATIONS & FUNDING POSSIBILITIES ENERGY The Ministry of Energy and Mineral Development (MEMD) (link) Responsible for overall management of the country’s energy sector, dealing with policy formulation, implementation and monitoring. Rural Electrification Agency (REA) (link) Facilitates provision of electricity in rural areas. The REA was established as a semi-autonomous Agency by the Minister of Energy and Mineral Development through Statutory Instrument 2001 no. 75, to institute the Government's rural electrification function under a public-private partnership. It functions as the secretariat of the Rural Electrification Board (REB), which carries out the Minister's rural electrification responsibilities, as defined in the Electricity Act of 1999. National Environment Management Authority (NEMA) (link) Principal agency in Uganda charged with the responsibility of coordinating, monitoring, regulating and supervising environmental management in the country. Other key actors Directorate of Water Resources Development Private Sector Foundation Uganda Uganda Investment Authority Uganda Manufacturer’s Association Uganda Renewable Energy Association Uganda Small Scale Industries Association Other Government Ministries, including District Local Governments The electricity sector was unbundled in 2001 and the responsibilities, previously solely carried out by Uganda Electricity Board (UEB), transferred to various companies: Uganda Electricity Generation Company Ltd (UEGCL) Responsible for the majority of all generation in the country at two stations: the Nalubaale and Kiira Power Stations. The business (and notably, not the assets) was privatised on concession terms for up to 20 years. Private participants in the generation sector include sugar processing and mining companies, as well as by endogenous firms such as Tronder Power Limited and South Asia Energy Management Systems Ltd. 23 (27) UGANDA report Uganda Electricity Transmission Company Ltd (UETCL) (link) Uganda Electricity Transmission Company Ltd (UETCL, www.uetcl.com): The UETCL is responsible for power transmission at 132kV and above including exports to Kenya and Tanzania, and is to buy most of the power from power generators. It is to remain a government utility body for some time. Uganda Electricity Distribution Company Ltd (UEDCL) (link) The UEDCL exists mainly to distribute and sell power to end users. (Reegle) The Electricity Regulatory Authority (ERA) (link) Established following the enactment of the Electricity Act 1999. The ERA is responsible for: o Issuing licenses for electricity generation, transmission, distribution, supply, import and export, o Reviewing and approving tariffs, o Establishing and enforcing sector standards, o Advising minister on matters affecting the electricity sector. OTHER The African Development Bank (AfDB) (link) Has 18 on-going projects in Uganda. Projects are related to, for example infrastructure development and agriculture. AfDB has a field office in Kampala. The World Bank (link) Is implementing 18 projects in Uganda. 5 of these are carbon offsetting projects. WB has a representation in Kampala. UNDP Is active in Uganda, with an office in Kampala. The UNDP focuses in Uganda on poverty reduction, democratic governance and crisis prevention and recovery. One of cross cutting themes is energy and the environment with several projects. UNEP Has a regional office in Kenya with projects in Uganda. GEF (Global Environment Facility) Many of the projects are funded by GEF. GEF projects concentrate mainly on biodiversity, climate change and land degradation. UGANDA report 24 (27) Nordic Development Fund Supports projects in Uganda. The Ministry for Foreign Affairs of Finland Has a few projects in Uganda The nearest Finnish embassy is in Kenya. Clean Development Mechanism (CDM) (link) projects Uganda has participated in UNDP’s capacity building programme for CDM projects, CD4CDM. The Ministry of Water and Environment is the national focal point for CDM. Uganda Municipal Waste Compost Programme and Uganda Nile Basin Reforestation Programme are the two currently approved projects. The Uganda National Chamber of Commerce and Industry (link) Is located in Kampala. The services of UNCCI include: maintaining structured forms of dialogue to promote public-private partnerships, disseminating up-to-date Business Information and Opportunities, Business Advisory Services, facilitation of Joint venture and Business matchmaking and inward and outward trade and investment missions. There are many NGOs in Uganda. Global Environment Facility (GEF) (link) has listed 23 NGOs accredited by the Facility. NGOs seem to concentrate mostly on rural livelihoods and biodiversity. 25 (27) UGANDA report 4.2 SOURCES OF INFORMATION, REFERENCES & LINKS The World Fact Book The Uganda National Chamber of Commerce and Industry Business Link National Board of Customs of Finland Business Link National Council of Education Education Link World Bank General Link CIA General Link Embassy of Finland General Link Global Environment Facility NGO Information General Link International Tax Deloitte Taxation highlights in Uganda 2012 Business Link Country Energy Information Developing Renewables Business Link Doing Business World Bank Business Link Economic Outlook AfDB, UN, OECD Economy Link Country Risk Classification Finnvera Economy Link Corruption Perceptions Index Transparency International Society Link Country BTI Transformation Level BTI Group Economy Link International Energy Association General Link International Renewable Energy Agency (IRENA) General Link Country profile, energy maps, tools, programs, organizations & institutions General Link Clean energy info portal General Link Government Link Environmental Governance Link Environmental Governance Link Renewable Energy Country Profiles Open Energy Info Country Energy Profile & Information Reegle Renewable Energies in Africa European Commission, Joint Research Centre Global Environment Facility Clean Development Mechanism BTI analyzes and evaluates the quality of democracy, a market economy and political mgmt. in 128 developing and transition countries The GEF unites 182 countries in partnership with intl. institutions, civil society organizations, and the private sector to address global env. issues United Nations Framework Convention on Climate Change The Energy and Environment Partnership Africa Project funding Business Link MBendi Economy, Risks, Industry, Business, Energy and a lot of other information Business Link African Development Bank (AfDB) Contains structured and analysed information on economic, political and social status General Link Directory of Development Organizations Contains list of development organizations in the country Society Link 26 (27) UGANDA report United Nations Development Programme (UNDP) Oil and Gas Profile Un-political information on country's status on environmental, social and financial situation General Link A Barrel Full Business Link The Electricity Supply Situation in Uganda and Future Direction Rugumayo The Ministry of Energy and Mineral Development General Link Energy Systems: Vulnerability Adaptation - Resilience (VAR) 2009 Byakola, Mukheibir Helio General Link The Electricity Act 1999 Electricity Regulatory Authority Government Link The Energy Policy for Uganda 2002 Rural Electrification Agency Government Link The Renewable Energy Policy for Uganda Rural Electrification Agency Government Link Strategic Plan 2005-2011 Rural Electrification Agency Government Link Uganda launches sophisticated feed-in tariff program Renewable Energy World Article Government Link Energy Programme Uganda Promotion of Renewable Energy and Energy Efficiency Programme Business Link Uganda: Energy for Rural Transformation APL-2 (GEF) The World Bank Project Business Link Electricity Sector Development Project The World Bank Project Business Link National Oil and Gas Policy for Uganda The Ministry of Energy and Mineral Development Government Link Solar Energy Study The National Association of Professional Environmentalists (NAPE) Environmental Governance Link Uganda country study: Energy and Policy Developing Renewables Government Link Uganda: Micro-earthquake Survey at the Buranga Geothermal Prospect The Federal Institute for Geosciences and Natural Resources (BGR) Business Link Department of Geological Survey and Mines General Link National Environment Management Authority (NEMA) Environmental Governance Link The Ministry of Energy and Mineral Development (MEMD) Government Link Rural Electrification Agency Government Link Uganda Electricity Transmission Company (UETCL) Business Link Uganda Electricity Distribution Company (UEDCL) Business Link Electricity Regulatory Authority Government Link Geothermal Energy in the Development of Uganda Paul Gipe Isabirye Mugadu Environmental Systems and Local Actors: Decentralizing Environmental Policy in Uganda Oosterveer, Van Viet Published: In Environmental Management 45: 284295, 2010 Environmental Governance Capacity Building for the CDM in Uganda Pöyry Published: Econ Pöyry Report, Commissioned by NORAD 2009 Environmental Governance South African company which won the energy generating concession in Uganda in 2003 Business Eskom Link 27 (27) UGANDA report Umeme Electricity distribution Business Link African Energy Supplying solar, wind and power backup equipment on a wholesale basis Business Link Alternative Energy Africa Information portal about alternative energy in Africa Business Link Inforse-Africa International network for sustainable energy Business Link Business Link Business Link Business Link Business Link Cleantech Knowledge Hub Business Link The World Council for Renewable Energy Business Link International Network for Sustainable Energy Business Link African Wind Energy Association Renewable Energy World Conferences & Expo in Africa Renewable Energy Africa How We Made It in Africa Insight into business in Africa Herana Gateway African higher education research Education Link African Rural Energy Enterprise Development Community-based organization developing a strategy for improved access to energy Government Link African Center for Economic Transformation An economic policy institute supporting the longterm growth with transformation of African economies Government Link Nordic Development Fund Project funding Business Link Government Link Government Link Business Link Africa and Europe in Partnership The Foundation for the Development of Africa Non-profit organization supporting sustainable development European Biomass Industry Association Global Network on Energy for Sustainable Development GNESD is a knowledge network facilitated by UN Environmental Programme Government Link Global Village Energy Partnership GVEP works with local businesses in developing countries to increase access to modern energy Business Link World Resources Institute WRI works with governments, companies, and civil society to build solutions to urgent env. Changes Government Link Economy Link The World Bank