Purpose Summarize Monday’s workshop Update on the Radio System – confirm staff’s recommendation Jail Expansion – discussion/direction Discussion of next steps in budget process 1 Summary – Monday’s Workshop Reviewed Ad Valorem funded CIP projects Gained Board direction Re-directed over $20,000,000 in eliminated and delayed projects 2 #41 - Radio System Upgrade Continue - $2,477,000 Eliminate - $5,209,000 Continue is for the upgrade of 5 controllers to extend the life of the radio system ($296,000). Continue for additional tower. This site will enhance South County coverage. One time cost of $2,181,000. 3 Jail Expansion 4 Options Continue with Phase II construction at GMP of $30,500,000 Consider re-design strategy Delay project 5 Project Overview: Expand facility to approximately double the current capacity (528 beds); provide additional support areas. This is a two phase project. The first phase provided Work Release, Video Visitation, Training / Armory, and maintenance buildings. Phase II will focus on inmate housing, medical housing / infirmary, intake and release, and courtroom areas. 6 ORIGINAL BUDGET: PROJECT BUDGET: CONSTRUCTION $47,653,000 BUDGET: $45,190,000 Design $3,085,000 GMP I $11,605,000 GMP II $30,500,000 7 JAIL EXPANSION - GMP I Buildings Provided: A 80-bed Work Release Video Visitation Training/Armory Maintenance Facilities Other Provisions: Site work, stormwater, sewer system, and domestic water for the jail expansion (GMP II) are included in part of GMP I. Schedule: • Construction Started: April 2007 • Estimated Completion: August 2008 8 JAIL EXPANSION - GMP I Budget: (cont’d) $11,605,000 Accomplishments to Date: • Work release is occupied and operational • Interior finishes and fixtures are in progress on Video Visitation and Training/Armory • The walls and tie beams are complete on the Maintenance Building 9 Jail Expansion – GMP II ORIGINAL PROJECT: Expand current facility to add an estimated 448beds. Housing area will provide for juvenile detention and special classification inmates. Also included are new inmate intake and release, arraignment/appellate courtrooms, personal property storage (inmates), transportation and sally-port areas. This phase provides funding for permit requirements, surveying, security system, security fencing and other building infrastructure for both GMP I and GMPII. 10 Jail Expansion – GMP II (cont’d) SCHEDULE: • Estimated Start: July 2008 • Estimated Completion: July 2010 BUDGET: $30,500,000 ACCOMPLISHMENTS TO DATE: • Project team performed value engineering to streamline project scope 11 Jail Expansion – GMP II (cont’d) ACCOMPLISHMENTS TO DATE (Cont’d): • Guaranteed Maximum Price is projected for BCC approval in May 2008 • Annual Jail Inmate Population Trends and Statistics report has been prepared by the Sheriff’s Dept. • Delay of GMP II will require additional funding to complete remaining elements of GMP I 12 Re-design Strategy Consider reduction of project scope/budget Project 3 to 5 month to re-design changes Possible redesign items: Delete 2 additional pods (128 beds) 320 beds remaining after re-design Remove the Sally Port Roof Reduce facility by a maximum of 10,000 square feet 13 Redesign Strategy (cont’d) Remove second floor property storage area Reduce FFE items Reduce Contingency Amendment to Design contract will be required for re-design. 14 Project Financing Substantially Ad Valorem Will use “best use” approach of cash on hand – borrow for Jail vs. Murdock 15 Board Discussion 16 Next Steps – Budget Process Next Meeting – May 19th Department - Reviews Focus on efficiency savings Some level of service reductions Current year savings 17