Download 8889-12-SI-EOG-1 - Government Printing Press

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Switched-mode power supply wikipedia , lookup

Rectiverter wikipedia , lookup

Transcript
.1 REGD. GO~~51
Panaji,28th June, 1988 (Ashada 9, 1910)
SERIES I No.
12
OFFICIAL
GAZE
TTE
GOVERNMENTOF,GO A
in====::;
EX·T Rf\ ()RDIN ft RY
GOVERiNMENT OF GOA
Department of Power
Notification
2/20/86-PS&WD
In exercise of the p\lwers conferred by section 23 read with section 51A of the Indian Electricity Act, 1910 (Central Act
9 of 1910), and in supersession of all the existing Notifications in this regard, the Government of Goa hereby frames the
following tariffs.for electrical energy supplied to consumers in the State of. Goa as specified in the Sshedule a.ppended to
this Notification.·
SCHEDULE
I. General· <Jonditioos
l.~h:ese tariffs shall be applicablelfor the bills to be issued from 1..;7-1988..
1. These tariffs: shall be subje'Ct to the terms and conditions for power supply approved from time. to time by the
Government.
2. Supply of energy in all cases shall be subject to the execution· of agreements by consumers~ .
3. As a general rule, no low voltage service shall be given where the connected load is over 100KVA. Exception may be
made in special cases at the discretion of the Chief; Electrical Engineer. .
4. Supply of consumers having· a cOillllected load between 100 KVA to 1000 KVA will be gecaerally at 11 KV, and
between 1000 KVA to 5000 KVA at . 33KV and for more than 5000KVA at nOKV. Exceptions may be made in
special cases at the' discretion of Chief Electrical EngineeT. A rebate .of 1% of the monthly bill corresponding to
·demand· charges and. energy. charges only shall be given to
. H.T. coIisume,rs avaiHng power supply at a voltage of 110 KV and above. HOWeV€T, the voltage of supply shall be at
the discretion of the Chief Electrical Engine€'r.
6. If energy supplied for a. specific purpose under a particular tariff. is used for a~ different purpose not contemplated
in the contract for supply and/or .for whichhighert;,.~riff is applicable it will be deenied as misIise and stealing of CllerS''y,
within the meaning of the Indial1 Electricity Act, 1910. Insnch a case, the energy consumption bills already rendered for
the service shall be revIsed by applying the .appropriate·. higher tariff from the date of cOlmection unless convincing
reasons are adduced thel'eof for adopting a different period; The imposition of this 'higher tariff shall not· relieve the
consumer from any penalties as per law.
1. Surcharge of one p'ercent compound. per month or part thereof shall be levied on all delayed payment of bills. Such
surcharge shall be rounded off to the nearest multiple of 5 paise. Amount less than 3 paise will be ignored and amount of
3 paise or more shall be rounded off to the next multiple of 5 paiSe.
2. If a consumer fails to pay the energy bill pre" santed to him within .the stipulated period, the Electricity Department .
shall have . the right to disconnect the·supply after serving seV6n days clear notice on su,ch· consumer.
3. A consumer· requiring supply fo.r Io.ads not
covered by these tariffs may negotiate for special .tariff With the Electricity Department.
10. 1n case'· of doubts or anomalies in respect of categorisation of any consluneT, the decision of the ·Chief .Electrical
Engineer shaU·be fmal. .
ll. DefinitiOlD!S
11. These tariffs are subject to revisio.n by the Government from time to. time.
1. Connected Io.ad means the sum of rat,:d cana.cities of· all the energy consuming devices which can be operated
siinultaneously.This will be expressed in KWIKVA. One H. P. will be considered equivalent to. one KYA for equipment
rated in H. P .
2,. Maximum demand m€!ans the average KVA supplied during the 30 minutes period (or any other shorter period as may
be prescribed by the Electricity Depar:tment) o.f may,jmumuse in a month.
3. Co.ntract demand means the maximum KVA for which the Electricity pepartment has undertaken to pro.vide facilities
from· time to. time.
156
Applicable to shop, offi-' For first 30 80 ces, railway,
stations, ho-units , tels, restaurants, photo
S
For EneiKt 120 100graphic
R "studios, :x.:Ray
I
units
E
installation, laundries, dry cleaners, cinemas,
thea~ For next 850
S
120 tres,AIRstation and other units commercial installation'S
All Ibalance ' 130
for lights, fans, ,radios, , consumpheating and other applian-'
N
tion
o
.
ces.
.
1
2
4. Billing demand means either:
i"'
(i) The actual maximum demandduriIig the month; or
(ii) 75'7~ of the contract demand; or
(iii) Acwallllaximum demand dUring the previous 11
(eleven) months; or
(iv) 50 KVA whichever is higher. However, if .the actual'
maximum demand is found to ,be exceeding the
.contracted demand, the
increase in hilling demand beyond the contracted'demand shall, be charged at double the normal
rate.
A. Low tension supply:
,
O
h
a
r
g
e
s
.
:
-
R
s
.
1. (a) Tariff'-LT-D/Domestic KWH/Month Ps/Unit,
Applicable to private For first 30 50 , ,
hOUses. bungalows" chibs, units hostels and
hospitals run
For next 120
on. non-:commerciallin~s,
units'
charitable, educa,tional and religio'lls institutions etc. ¥' ci r
balance 90 for lights, fans, radios, consumpdomesti~ 'heatings
and tion above other household applian1150 units. ,ces.
'l!!linimuni Charges. -Rs. 10/-(Rupees ten) per month for the
first 500 watts and Rs. 10/-(Rupees ten) for fNery additional
500 watts or part thereof of ,the connected load.
, Note. -Combined load ror domestic a..'1d commer.
cial purposes shall be charged at commercial tariff
unless separate meters are provided.
1. (b) TariffLT~D/LIG Monthly charges
,'
Applicable to consumers Rs.5/-per connection of ,Low
Income-Group with a connected load 2x40 watts only
Note. -For any unauthorised increase' in load beyond ~40
watts, penal charges at the rate of Rs. 10/-per month per point
shall be levied and the installation shall be liable for,
disconneCtion.
2. Tariff LT-C/Commercial-KWH/Month Ps/Urut
M
i
n
i
m
u
m
2
0
/
K
W
/
H
P
/
K
V
A
/
I
M
o
n
t
h
,
o
r
p
a
r
t
t lagging; the installation, is liable to be disconnected. Further,
h the Electricity Department reserves the right to install a suitable
e capacitor at its own cost and recover the cost thereo~ as arrears
r of 'energy charges. '
Applicable to consumers
for general motive power
service
Al
consump
l
'tion
upto
20 HP of
connected
load
All
70
4.
Tariff
'9
consump
0
tion
above
20HP
of
connected
e LT-Ag/AgriKWH/Month ' ps/Unit culture
, load
o
to irrigation
35 pumping
Applicable
to Public
LightingAll co'nsump
All consum6 and
f Applicable
purposes, poultry,
system
including tion
signal'
ption .dairy,
dur- piggery,
0 pisciculture,
. agricultural
etc.and
for lights, fans, he'ating ,ingthe
and other appliances.
system,
p'ark . lighting. belonging to .
month
local authorities
suc
3~ Tariff,LT-P/Motive Power KWH/month Ps/Unit
Minimum Charges. --.:..as Rs. 5/-(Rupees five) per monthpei-H.
h
P.of connected load or part thereof subject to a minimum of3
Municipalities/ PaIl;chay
H.P.
at etc. This is also ap
'Minimum
Oharges;
-Rs.
10/-(Rupees
ten)
pers,
Note. -(i) Bonafide lighting of the pumphouse upto 5,% of the
motive power consumption, is per-· mitted under this category
KVA/HP/KW/month
connected load or part thereof. . . plicable to public lighting
and excess consumption
of Government/semi-go
chargeable
at Tariff LTD/Domestic tinder A,l(a).
Note. -(i) Supply Under this tariff will be given for avernment establishment.
IDini]Jlum of 3 BHP. If any load less than 3 BHP is' requiredThis is an optionaltadff
(ii). The power faetor
should
not in any case
All
cansum-'
,100 fall
by the consumer, minimum bill shall becha.rged on the ,basis 'applicabl
, below'to 0.85
lagging. If the power
. consumeril
ptionfactor is lower than,0.85
of load of 3 BHP.
lagging, the consumer shall install, capacitors to bring the,
e
: is found
power
factorload
to atup..
least 0.85. In ca~e the .power factor
,having
connected
(ii) The Power Factor.should not in any care fall below 0.85
.
to be lower than ,
lagging. If the,'power factor'is lower than 0.85
0.85 lagging, a penal charge at the rate of 2.5%. on the
laggL.'1g,theconsumer shall install capa~ citors to bring the
to energy charges onlyshaU be
to 150monthly
.KV A bill,
onlycorresponding
as
an
power factor to at least 0.85 lagging. In'case the power faCtor,
,levied.
In
case
the
power
factor
is less thaliO.7 lagging, the
alternative .t
th
tariff
is found to be lower than 0.85 lagging, .penalcharges at rate of
installation
is
liable
to
be
disconnected.
Further,the Electricity
o
e
2:5% on the monthly bill corresponding to the energy charges
Department
re.;.,
HT-I/Industrial described
only shall be levied: In case the power facto·r is less than 0.7
above. The option once ex
. ercised cannot be changed
withi
th period o 12
n
e
f
billin months
fro the,
g
m
date of option.
ter
3. Hire of H. T~ me-: tering equipment (including C.T.P.T.
Unit)Rs: 200/-per month
B. Temporary Supply:'
o
1. Hire volts of 220/230
Rs. 5/per month part
energy mer
ter
thereof
2:, Hire of 400/440 volts'
Rs. 10/-per month part o
energy methereof
r
of
~8TH"UNEJ 1988 (A.SHADA 9~ 1910)
recover the cost incurred thereon as' arrears. of energy
charges. . . .
serves the right to install a suitable_ capacitor at its own cost
and recover the cost thereof as arrears of energy charges.
, . ". :.' '. ".. r-'.~ "' "'.'
7. Tariff HT-I (Industrial) '.' <
. i.
I.," r' toni .
Applicable to consumers
for general motive power
service
Al
consump
l
'tion
upto
20 HP of
connected
load
All
70
Applicable to supplyof power at 11 KV and above, to
industries, factories,water and sewage pumping and other
purposes as may be decided by Chief Electrical Engineer.
Demand Charges Plus
'9
a) Rs.30/-per' month ..All consumption per KVA '. of Billing
Deupto . 50;000 mand .upto . contract De-.units -.:; 80 mand. . ,
.. ps/unit ' , . i;i, ..,
consump
0
tion
above
b ) For billing'demand' All consumptiollo in· excess of
20HP
of
contract deabove 5Q,OJ)JI mand Rs. 50/-per KVA units
connected
5. Tariff LT-PL/Public
.....,....·90 pel' month. ps/unit
KWH/Month
P~/Unit
, load
Applicable
to Public Lighting
All consum6
Lighting
Note.-(it) .Lighting up'to 10% of the monthly .energy .
system including signal'
ption . dur0
cpnsnmption> is allowed lmderHTl;,tafiif, for bonafide
system, and
ingthe
factory righting purposes. ~ce~: i~ chargeable at Tariff
p'ark . lighting. belonging to .
month
Minimum Charges; The mnumum charges per month shall
LT-C/Coll)Jll~I'cialundeI'~.,2.::
local
authorities
be Rs.
65/-(Rupeessuc
sixty as
five) per KW o[cOll1llected load.
The connected loadh for the purpose. of billing.shall be the
. (b) ~or staff quarters,' rest/~est lious~:/,f:ltfgeilighting
Municipalities/
PaIl;chay on thefirst day and the last day of
in the colony situated separately from"the main f~tory and when
average of the connectedload
at
etc. This
is also ap
the month,
in queStion.
distribution lines, service lines, meters, etc. are, permitted to'
s,
beown:ed:imd maintained by RT. consumers, all
L
plicable to public lighting
energyconslimed shall be charged at Tariff LT;:.D/ Domestic
,,-Standard public . lighting fixtures with
of Note.
Government/semi-go
under A~l(a).· '.
out lamps shall be pl'O'vided and. maintained by the
vernment establishment.
Electricity .l)epartment. Special lighting fixtures,
This is an optionaltadff
All cansum-'
,100
(c) The Power factor shall
in any case fall below 0.85
filament lamps,
'applicabl
to . fluorescent
consumeril tubes and other
ption fittings
lagging. In ca:se'the powerfactoris~bUrrd to be lower than 0,85
eshall be ~upplied by the concerned Municipalities/
/Panchayts
which shall
also bear the cost of main
:
,having
connected
load up..
laggmg, penal chargOO{),ttlie rate 0[ 0.5% in the monthly
.
tenance, handling of . filament, .mercury vapours,
bill correspo:n.ding to d~and ch¥gesand. energy charge.S.
.
OJiIY'sl1J:~Jl ,be levIed for eveIJ: 0.01 which ,the p!,ow~r.f~ctRr,
fluorescent or any other lamps of different wattages
to 150 .KV A only as
an
f~P$' below 0.85 laggmg. In case 'th~PQwer faGt()r is~less
at the rate of Re.1/-per .month per fixture/lamp.
thanO.y lagging; the installati?l!-.1$ JiablE~,,~orCH~-'
alternative
th residential
tariff
In the case of.tpt<ivate
co~onies, the street
o
e will. have to be provided as . well as
connectlon~Further, the ElectrlCI.ty Departmept.re:serves the
'lighting fixtures,
etc.
HT-I/Industrial
described
;right to install capacitors toiInprorve the power f&.ctor
maintained by them. .
above. The option once ex
alid·recover the cost·incurredtlrereon as arrears of energy
B. High tension supply.
. ercised cannot be changed
Applicable to consumers
Al
70
6. Tariff
withi
th Hl'-M/Mixed.
period o 12
consump
l
n Appli~'abl'a
e
to bulkf supply of power at>11KV and above
for general motive power
'tion
upto
billin
months
fro the,
to consumers such
as railways, M.E.S .. ed.u20 HP of
gcationalinstitutions,mnon-industrial establishments, etc. having service
date
of option.
connected
a mixed
load with pre-dominantly lighting or non-industrial
ter
load
load of-more than 50% of the connected load. .
3. Hire of H. T~ me-: tering equipment (including C.T.P.T.
'9
All consump
Unit)Rs:
200/-per
month charges Ps/Unit
0
Demand
Charges
Plus' Energ-s
tion
above
B. Temporary Supply:'
Rs.volts
30/-perof
month
All consumption
KVA.of
220/230
o
1. a)
Hire
Rs. 5/perper
month
part billing
20HP
of
Deupto
50,000 mand
deunits-90 mand
energyupto
me-contract
r
ter
thereof
connected
charges.
2:,b)Hire
400/440
volts'All conSumption
Rs. 10/-perinmonth
o
For of
billing
demand
excesspart
of contract
, load
energy mer
deabove
5,000 mand. Rs. 50/-perthereof
K'vA units -100 per month.
Applicable to: Public
consum- Ps/uni..t
6
8. Tariff Lighting
HT-O/Optional.All
KWH/Month'
system including signal'
ption . dur0
ingthe
Note. The p'Ower factor shall not in any case fall below 0.85 system, and
month
lagging. In case the power factor is found to be lower than p'ark . lighting. belonging to .
,i
0.85 lagging, penal charges at the rate of 0.5% on the monthly local authorities
suc
. Minimum Charges.-Rs.20/as per month·per H.P. of coonected
h
bill correspondh'1g to de~and charges and energy charges oniy
load or part thereof subjectrtoa mininium ·of70 H.P, . '. .
shall be levied for every 0.01 by which the power factor falls Municipalities/ PaIl;chay
below 0.851agging. In case the pQlWer factor is less than 0.7 at etc.
This-(a)
is also
ap upitO 10'% of the monthly energy
. Note.
Lighting
lagging, the installa.t1.on is liable
s,
consumption is allowed u.llder HTO tariff for the
. for disconnection. Further, the Electricity DepartlIlent reserves plicable
to public lighting purposes: Excess 'is chargeable at
,oon8fidefactorylighting
the right to install ca,pacitors to improve the power factor and
of Government/semi-go
Tariff LT-C/Commercial under A-2.
vernment establishment.
This is an optionaltadff
All cansum-'
,100
'applicabl to . consumeril
ption
e
:
,having connected load up..
, ;~;~
•J
not
B.EIUEB i :No,
t!.'
" (1)) For staff quarters, rest/guest' houses, street
lighting in the colony situated separately from the '
main factory and when distribution' lines,', service
lines, meters, etc. are permitted to be owned and
maintai.'1.ed,by H.T.consumers, all energy consumed,
shall be charged at Tariff LT,;.D/Domestic under
A-1(a).
(c) The power factor shall not in any case fall below 0.85 lagging. In case the power factor is
found to be lower than 0.85 lagging, ,penal charges ' at the rate of 0.5% in the monthly bill
corresp6nding to energy charges only shall be levied for every ,
0.01 which the'power factor falls below 0.85 lagging. Incase the power factor is less than 0.7
lagging, ,
'" t!1e installation is liable for disconnection. FUrther, the Electricity Department reserves the
right to install capacitors, to improve the power factor and, recOVer the cost incurred thereon
as arrears Of energy, charges;
9. Tariff HT-Ag/AgricultUral KWH/Month Ps/Unit '
Applicable to supply, of ,All COllSum'" 35
power at 11 KV and above ption
to agricultural consumers, .Lift Irrigation Schemes,
agricultural farms, etc.
.f
Minimum Oharges. -Rs. 10/-(Rupees ten) per month per It. P. ofconriected load or part
thereof subject to a minimum of 70 H.P. '
Note. -(a) Bo:nafide lighting of the pumphouse upto 5% of the motive power consumption'is
permitted under this category and excess consumption i.e; , chargeable at Tariff LT-D/Domestic
under A.l(a)".
(b) For street l'ighting and other lighting situated ' separately from 'the pumphotise' and when
distribution lines, service lines, meters, etc. are permitted, to be around orin~in1::ained by the
H.T.con~umer, all energy consumed shall be charged at Tariff
L~-D/Domesticunder A~l(a).
Note. -(2) The
energy charges
are at double the
rates
in
the,
respective
category
of
permanentsupply:
',
11.
Tariff-liT/
Temporar
y.
Applicahle
to supply
of power
at l1KV
and
above;.
Demand Charges
Plus' Energy charges
(a) Rs.
50/-per
month At
double the
per KVA of
Billing rate
in the
Demand
upto Conrespective
tract
Demand.
category of
(c) The power factor shall not in any case fall
, below 0.85 lagging. In case the power factor is found ' to be lawer than 0.85 lagging, penal
charges at, the rate of 0.5% iIi the monthly billoorresponding to energy, charges only shall be
levied for every, 0.01 which the power factor falls below 0.85 lagging.,In ' case the power factor
is less than 0.7 lagging; the installation is ,liable for disconnection~Further, ,the Electricity
Department 'reserves the right to install capacitors to improve the' power factor, and recover the
cost incur?ed thereon as arrears of, energy charges..
C. Temporary Supply.
10. Tariff LT-Temporary Energy Minimum charges charges
1) Applicable to lights, fans and small appli, ances.
a) For single phase See' Rs. 2O/-per
only . note -2 day for supply upto 3 daysandRs. 10/-per day thereafter
b) For three phase, , supply
2) Applicable to motive power
3) Touring talkies and cinemas
Rs. 100/-per period of service not , exceeding one month
Rs. 20/-per
H.P. of con~ nE~cted, load or part thereof
Rs. 180/-for a period of
'supply upto 15 days; Rs. 360/-for a' period of supply exceeding 15 days but not
, exceeding one month.
Note. -(1) The above temporary tariffs are applic9,hle for temporary supply for a period not exceeding one month which may be extended beyond that period with the prior 'permission of ,the
Elec· tricity Department.
(b) For
Billing
Demand,
supply.
in excess of
Contract
Demand, Rs.
100/per
KVA
permoonth.
Note,-(a)
Ap'Plicable
for temporary
supply, for
a period-not
exceeding six
inonth~ which
may be ex
ed with prior permission of the Electricity De-'
partment.
(b) The powerfacto([' shall not in any case fall below 0.85 lagging. In case the power facto~ is
found to be lowe(['than 0.85 lagging, penal, charges at the rate 0.5% on the, monthly bill
corresponding to demandchargesand energy charges only shall be levied for every 0.01 hy
which the power factor falls below 0.85 lagging. In case the power factor is
, less' than 0.7 lagging, the installation is liahle for disconnection; Further, the Electricity
Department reserves the right to tilstall ca:p.acitors to improve the power factor' and reCOver
the cost theI"eOn as arrears of energy charges.
IV. 'Meterr Renta;} Charges
A. Permanent Supply:,'
1. Hire of 22()/230 Re.-1/-per mOllth v9lts energy me-, ter
Applicable to consumers
2.
for general motive power
service
Al
consump
l
'tion
upto
20 HP of
connected
load
28TH JUNE) 1988
(A8HADA9) 1910)
70
'9
All
consump
0
tion
above
20HP
of
'ter
connected
3.
, load
Applicable to Public Lighting
All consum6
system
including
signal'
ption
.
dur0
thereof (including
system,
and
ingthe
.
Unit)
p'ark . lighting. belonging to .
month
The
aborv~'
charges are suc
payable on expiry ,of the lastdate of
local
authorities
as
payment mentioned therein
h the monthly energy bilL
Municipalities/
PaIl;chay
By order
and in the name
of the Gove:l.'llor of Goa. '
at etc. This is also ap
Sublw...sh
V. Elekar) Under Secretary (Industries, and
s,
Labour).
plicable to public lighting
of 27th
Government/semi-go
Pa,naji,
June, 1988.
vernment
establishment.
~~*.,-,-This is an optionaltadff
All cansum-'
,100
law 'applicabl
(legal and to
Legislative
. consumerilAffairs) Department
ption
e
(ELECTION
BRANCH)
:
,having connected load up..
.
Notification, '
.
3-1-87/Elec
to 150 .KV A only as
an
The
following Notification.
No., 56/88-XXXXII dated 6th
alternative
.t
th
tariff
June, 1988 issued by
o the eElection ComM.
Raghu..ohandar)
Addl. Chief Electoo'al Officer.
HT-I/Industrial
described
above.'16th
The option
once ex
Panaji,
June, 1988.
. ercised cannot be changed
withi
th Election
periodCommission
o 12 of India'
n
e
f the 6th June) 1988.
'New Delhi) dated
billin months
fro the,
Jyai8tlw
g
m 16, 1910 (8)
date of option.
,Notification
ter
',In exercise of the 'powers conferred by rules 5 and 10 of
3. Hire of H. T~ me-: tering equipment (including C.T.P.T.
the Conduct of Elections Rules, 1961, and clause'(d) of
Unit)Rs: 200/-per month
sub-paragraph (1) and suh-paragrar:!l
B. Temporary Supply:'
(2) of paragraph 17 and paragraph 18 of the Election
1. Hire(Reservation·
volts of 220/230
Rs. 5/per
month1968,
part theo
Symbols
and Allotment)
Order,
energy
mer
ter
thereof
Election Commission of India hereby
2:,
Hire
of
400/440
volts'
Rs.
10/-per
month
part
o
, makes 'the following, further amendment in its notification
me-dated the 13th November,
thereof1984, published' asr
No.energy
56/84.,1,
O. N. 124(.E) , in the Gazette of Iridia, Extraordinary, Part
II, Section 3' (iii), dated the, 16th Norvember, 1984, and as
amended from time to time, namely. --'In Table 4 or the said notification, agrunst item
10. Madhya Pradesh, under cohimn2, the entry ,"51.
Tractor" shall be included.
2,. The above inclusion, shall
1?e
deemed to be operative
with retro~pective effect from 26th May. 1988 and is· only for
the bye-election froni9-Gohad
'assembly constituency, in Madhya Pradesh currently under
process and sha11 cease to be operative with the completion
of said bye;.election in Madhya Pradesh State.
[No.56/84-XXXXII]
By order,
,R. P. BHALLA
HiI'e of 400/440 Rs.
2/-pel' month mission of
Illdia, New Delhi is
hereby published for
volts energy me-general
information. ' '
.
Tempora
ry Disconnection
Charges
, For 1 1) service:
51" For ,3 tf;
service: Rs. 10/-
Hire of H. T. me-' Rs.
400/-per month or
tering equipment part
SECRETARY. '
GOVT. PRINTING PRESS -GOA
Omprenaa NadolUil -
Go..;
PRIOE -Rs. 0..{,'O Ps.