Download CURRICULUM VITAE - Planning Engineer Est.

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

PRINCE2 wikipedia , lookup

Construction management wikipedia , lookup

Transcript
CURRICULUM VITAE
JOHN. K. BABY
Mobile: +971 0566875455
Email: [email protected]
Hometown: Kozhikode, Kerala
Current location: Abu Dhabi, United Arab Emirates
Job Designation: Planning Engineer in Nael & Bin Harmal Hydroexport Est. (NBHH)
CAREER OBJECTIVE:
To obtain a demanding position in a well established Organization
where in I can utilize my skills thereby contributing to the organization’s growth and where
my loyalty will be rewarded with career advancement and guidance.
PROFILE SNAPSHOT:
Post graduate engineer with more than 5 years of diversified
experience in planning & project management of Oil & Gas Marine structures, Infrastructure
(roads, structures and bridges) & Building projects
KEY AREAS & SKILLS: Planning, Project Management, Primavera 6, MS Project, Scheduling,
Costing, Budgeting, FIDIC, Oil & Gas, Roads, Bridges, Buildings, Real estate, Infrastructure,
Offshore, Piping, Drainage
ACADEMIC QUALIFICATION
Masters of Technology in Construction technology & Management (2011) from NITK,
Surathkal, Mangalore India
Bachelors of Technology in Civil Engineering (2009) from CET, Trivandrum, India
SOFTWARES LEARNED
* Primavera P6 * Web Primavera * MS Project * Open Project * Microsoft Office * AutoCAD *
WORK EXPERIENCE
Dec-2014 to
present
Project
Work Profile
Nael & Bin Harmal Hydroexport Est. as Lead Planning engineer for Central Island



Civil, Buildings, Structural (PEB’s), Underground piping, Piling, Sea water intake
works for Central Island & West island in Upper Zakum (UZ750) oil field.
(Offshore)
Client : Petrofac & ZADCO
Preparation of Baseline program, Revision & updating of program In P6.
Preparation of monthly & weekly programs.
Allocation of resources & productivity analysis.
Nov-2012Nov-2014
Work profile










Project
Details
Sep 2011 Oct- 2012
Project
Details






Updating & preparation of progress measurement system (PMS)
Attending meeting with clients.
Preparation of reports.
Al Watanyiah united engineering & contracting co. Muscat, Oman as Planning
engineer
Preparation of Baseline schedule, revision & updating schedule In Primavera P6
Preparation of overall construction program, monitoring project progress against
Planned Schedules, earned value analysis, analysis in the change of contract
scope / delay if any, etc.
Preparation of daily, weekly & monthly progress reports and presentations.
Dashboards, look-ahead programs, bar charts, turnaround document & S-curves
Preparing Cost curve based on Cash flow (Cost control) and budget preparation
for the projects.
Allocation of Resources for getting optimal result (Resource leveling)
Preparing & presenting project status reports for weekly internal review
meeting, Consultant meeting & Sub contractor meeting.
Proactively anticipate potential schedule issues and advise management.
Preparing extension of time (EOT) & other claims.
Preparation of various types of MIS reports for Top Management.
Tender program preparations.
Construction of Roads, Bridges & structures (Highway projects) –
1. Construction of Asphalt road to Wadi Al Sahtan in Rustaq, Oman (100
Million USD project) - Design & Build
2. Dualization of Al Rustaq Escarpment road (Governorate of South Al
Batinah) (90 Million USD project) - Design & Build











With Synergy Property Development Services Pvt. Ltd, Bangalore, as Project
Engineer – Planning & Co-ordination
Construction of TCS Campus at Infopark, Cochin, Kerala, India (Buildings &
Infrastructure) – 100 million USD project
Contractors: M/s Simplex Infrastructures and M/s L&T ECC.
Planning & Site Management
Review / approve contractor's work program submissions
Updating progress in Primavera 6 & MS Project
Preparing monthly progress reports
Estimate change of orders and evaluation of claims
Establish and monitor construction work schedules
Coordination with various service agencies of MEP & Fit-out.
Allocation of various tasks to fit out sub-contractors.
Estimate the quantities as per drawing & co-ordination of procurement
With Bangalore Metro rail Corporation as Trainee Engineer
Project Details

Construction of Bangalore Metro rail.
Work profile





Prepared a revised schedule on Primavera P6.
Suggest a new management hierarchy utilizing Primavera P6.
Preparation of Base Line Plan and generation of S Curves.
Continuous monitoring via Daily, Weekly & Monthly Progress Reports.
Analysis of Equipment and Resource Usage, Earned value analysis & study of
tender documents
Work profile
July 2010 –
June 2011

ACADEMIC PROJECTS
M Tech
In Bangalore Metro Rail Corporation Ltd. (BMRCL)
“Monitoring of Bangalore metro rail project (2 Billion USD) using Primavera P6”
B Tech
“Design and cost Comparison between IS 456 and IS 13920”. The Project was done in STAD
TRAININGS
1. Basic H2S training (Valid up to Feb 2017)
2. Travel safely by boat (TSBB) training (Valid up to Feb 2019)
3. ZADCO offshore, sea survival & firefighting.
PROFESSIONAL CERTIFICATIONS


Pursuing PMP
Pursuing a membership in MICE.
PERSONAL PROFILE
Date of Birth
Father’s Name
Mother’s Name
Languages
Marital status
Gender
Nationality
:
:
:
:
:
:
:
May 21th 1987
K.P BABY
ANNIE BABY
English, Hindi, Malayalam
Single
Male
Indian
DECLARATION
I hereby declare that the information furnished above is true to the best of my knowledge.
Place: Kozhikode
Date:
JOHN.K. BABY