
G TBT N BWA 2 - Bureau of Product Standards
... requirements for clamping units for conductors from 0,2 mm up to 35 mm (included) IEC 61032: 1997, Protection of persons and equipment by enclosures-Probes for verification IEC 61058-1:2000, Switches for appliances-Part 1: General requirements IEC 61558-1:1997, Safety of power transformers, power su ...
... requirements for clamping units for conductors from 0,2 mm up to 35 mm (included) IEC 61032: 1997, Protection of persons and equipment by enclosures-Probes for verification IEC 61058-1:2000, Switches for appliances-Part 1: General requirements IEC 61558-1:1997, Safety of power transformers, power su ...
Introduction Peak Current Surge/Inrush Measurement
... Features-Peak Current Measurement • Integrates into any UPC-1 or UPC-3 Power Source without hardware modification. • Other UPC-1/3 options may be combined with surge inrush option. • Front panel or remote bus control arms, disarms, and displays surge inrush peak current capture process. • Peak curre ...
... Features-Peak Current Measurement • Integrates into any UPC-1 or UPC-3 Power Source without hardware modification. • Other UPC-1/3 options may be combined with surge inrush option. • Front panel or remote bus control arms, disarms, and displays surge inrush peak current capture process. • Peak curre ...
ultrasonic radar based
... reflected back to the sensor. Travel time of the ultrasonic pulse from sensor to target and back is calculated. Level “C” can be found by multiplying half of this time with the speed of sound in air. The measuring unit final result can be centimeters, feet, inches etc. Level = Speed of sound in air ...
... reflected back to the sensor. Travel time of the ultrasonic pulse from sensor to target and back is calculated. Level “C” can be found by multiplying half of this time with the speed of sound in air. The measuring unit final result can be centimeters, feet, inches etc. Level = Speed of sound in air ...
373-ELR Earth Leakage Protection Relay
... The 373-ELR features two incremental rotary selector switches on the front panel and a series of LED annunciators. The 10 position trip current switch offers selectable earth leakage current settings from 30mA to 10 amps and the 16 position time delay set point switch offers additional delay for fau ...
... The 373-ELR features two incremental rotary selector switches on the front panel and a series of LED annunciators. The 10 position trip current switch offers selectable earth leakage current settings from 30mA to 10 amps and the 16 position time delay set point switch offers additional delay for fau ...
Selector Guide
... Pt100 Ohm RTD DIN -202 to 850°C .................... Pt100 Ohm RTD DIN -331 to 1562°F .................. Pt100 Ohm RTD ANSI -202 to 850°C .................. Pt100 Ohm RTD ANSI -331 to 1562°F ................ J Thermocouple -210 to 760°C .......................... J Thermocouple -347 to 1400°F ...... ...
... Pt100 Ohm RTD DIN -202 to 850°C .................... Pt100 Ohm RTD DIN -331 to 1562°F .................. Pt100 Ohm RTD ANSI -202 to 850°C .................. Pt100 Ohm RTD ANSI -331 to 1562°F ................ J Thermocouple -210 to 760°C .......................... J Thermocouple -347 to 1400°F ...... ...
UNIVERSAL DIGITAL METER • DC Volts and Amps • Thermocouples and RTDs
... Pt100 Ohm RTD DIN -202 to 850°C .................... Pt100 Ohm RTD DIN -331 to 1562°F .................. Pt100 Ohm RTD ANSI -202 to 850°C .................. Pt100 Ohm RTD ANSI -331 to 1562°F ................ J Thermocouple -210 to 760°C .......................... J Thermocouple -347 to 1400°F ...... ...
... Pt100 Ohm RTD DIN -202 to 850°C .................... Pt100 Ohm RTD DIN -331 to 1562°F .................. Pt100 Ohm RTD ANSI -202 to 850°C .................. Pt100 Ohm RTD ANSI -331 to 1562°F ................ J Thermocouple -210 to 760°C .......................... J Thermocouple -347 to 1400°F ...... ...
Basics of Meter Mounting Equipment
... While single-phase power is needed for most residential applications, three-phase power is used in many other applications. In a three-phase system, the generator produces three voltages. Each voltage phase rises and falls at the same frequency (60 Hz in the U.S., 50 Hz in many other countries); how ...
... While single-phase power is needed for most residential applications, three-phase power is used in many other applications. In a three-phase system, the generator produces three voltages. Each voltage phase rises and falls at the same frequency (60 Hz in the U.S., 50 Hz in many other countries); how ...
AD578_AD579 Very Fast, Complete 10- or 12
... the middle of that code (halfway between the transitions to the codes above and below it). Thus, when properly calibrated, the first transition (from 0000 0000 0000 to 0000 0000 0001) will occur for an input level of +1/2 LSB. ...
... the middle of that code (halfway between the transitions to the codes above and below it). Thus, when properly calibrated, the first transition (from 0000 0000 0000 to 0000 0000 0001) will occur for an input level of +1/2 LSB. ...
Meter services specification guide
... cover) and main service disconnect switches shall be plainly and permanently marked with numbers and/or letters by the owner to indicate the building address or apartment address served. The markings must be either engraved nameplates or clearly legible adhesive-type labels at least one inch high. • ...
... cover) and main service disconnect switches shall be plainly and permanently marked with numbers and/or letters by the owner to indicate the building address or apartment address served. The markings must be either engraved nameplates or clearly legible adhesive-type labels at least one inch high. • ...
Greenwave Meter Instructions (11-13-15)
... the meter and void the warranty. Also, do NOT exchange or adapt the cord/plug that came with the meter in an effort to make it fit non-‐standard outlets in your environment (e.g., ...
... the meter and void the warranty. Also, do NOT exchange or adapt the cord/plug that came with the meter in an effort to make it fit non-‐standard outlets in your environment (e.g., ...
Series 100 Manual (TH-W-APK-00-00-0612-05-A ).indd
... RAtE dSP – This number represents the maximum flow rate to be displayed. In establishing this number, all 6 of the available digits should be used if possible. (This setting is determined below.) RAtE InP – (The Hertz value at the programmed flow rate. This number should be enhanced as follows: For ...
... RAtE dSP – This number represents the maximum flow rate to be displayed. In establishing this number, all 6 of the available digits should be used if possible. (This setting is determined below.) RAtE InP – (The Hertz value at the programmed flow rate. This number should be enhanced as follows: For ...
EX650 Series
... CAUTION: When connecting the test leads to the circuit or device under test, connect the black lead before the red; when removing the test leads, remove the red before the black lead. Disconnect probes and circuit under test after all measurements are completed. The meter displays a high voltage ...
... CAUTION: When connecting the test leads to the circuit or device under test, connect the black lead before the red; when removing the test leads, remove the red before the black lead. Disconnect probes and circuit under test after all measurements are completed. The meter displays a high voltage ...
62-0391 Class 3400 Meter Install Manual - E-Mon
... d. Connect the three AC main power wires (Phases A, B and C) to their respective positions as labeled on terminal block TB1 and tighten to 7 in-lb. After all conductors are connected to each of their respective terminal block positions and tightened down, verify that each terminal block screw is sec ...
... d. Connect the three AC main power wires (Phases A, B and C) to their respective positions as labeled on terminal block TB1 and tighten to 7 in-lb. After all conductors are connected to each of their respective terminal block positions and tightened down, verify that each terminal block screw is sec ...
Insulation coordination studies
... different scenarios, the worst cases overvoltages are determined, both line-to-earth and line-to-line, and used as an input for the insulation coordination procedure. Application of insulation coordination procedure From the worst case overvoltages, resulting from the simulation studies, the require ...
... different scenarios, the worst cases overvoltages are determined, both line-to-earth and line-to-line, and used as an input for the insulation coordination procedure. Application of insulation coordination procedure From the worst case overvoltages, resulting from the simulation studies, the require ...
Users Manual - Fluke - UCSD Physics
... Examine the meter carefully, familiarizing yourself with the layout of the input terminals, rotary switch, pushbuttons and display. Notice the Warning information and summary of power-on options engraved into the rear panel. If you have used a multimeter before, simply examining your meter will prob ...
... Examine the meter carefully, familiarizing yourself with the layout of the input terminals, rotary switch, pushbuttons and display. Notice the Warning information and summary of power-on options engraved into the rear panel. If you have used a multimeter before, simply examining your meter will prob ...
- Landis+Gyr
... compensation). This means the meters measurement circuit is unaffected by the compensation allowing both the measured values and the compensated values to be displayed at the same time. The meter retains its uncompensated values along with copper losses, iron losses and the compensated values. This ...
... compensation). This means the meters measurement circuit is unaffected by the compensation allowing both the measured values and the compensated values to be displayed at the same time. The meter retains its uncompensated values along with copper losses, iron losses and the compensated values. This ...
File - Catalina Spas
... approximately 1,000 PPM of sodium bromide. For example, if your start-up TDS was 300 and you added 2.5 bottles of Catalina Spa-kle granular sodium bromide to your 1700 litre spa, your TDS count will now be 1,300 (1,000 PPM of NaBr plus 300). You can verify this with sodium bromide test strip if desi ...
... approximately 1,000 PPM of sodium bromide. For example, if your start-up TDS was 300 and you added 2.5 bottles of Catalina Spa-kle granular sodium bromide to your 1700 litre spa, your TDS count will now be 1,300 (1,000 PPM of NaBr plus 300). You can verify this with sodium bromide test strip if desi ...
The HAPIRAT, a Ham Audio Panel Interface for Receiving
... become a completely separate hamshack function. We cannot expect a transceiver to include all the necessary audio and control functions, especially when there are several rigs in the shack, several microphones to choose from, and several different operating modes. Although the features listed below ...
... become a completely separate hamshack function. We cannot expect a transceiver to include all the necessary audio and control functions, especially when there are several rigs in the shack, several microphones to choose from, and several different operating modes. Although the features listed below ...
esr - Slot Tech
... gradually dries out and the ESR value will rise up with time. The rise in ESR value increases both voltage drops within the capacitor and the heat, produced in the capacitors due to resistive heating. If you don’t test electrolytic cap for ESR, you may not be able to solve the problem. A high ESR va ...
... gradually dries out and the ESR value will rise up with time. The rise in ESR value increases both voltage drops within the capacitor and the heat, produced in the capacitors due to resistive heating. If you don’t test electrolytic cap for ESR, you may not be able to solve the problem. A high ESR va ...
Model 5132 Party-Line Interface Module
... For compliance with international broadcast audio level standards two versions of the Model 5132 are available. The Model 5132S supports SMPTE® audio levels where the analog audio reference level is +4 dBu. The Model 5132E supports applications that require European Broadcast Union (EBU) compliance ...
... For compliance with international broadcast audio level standards two versions of the Model 5132 are available. The Model 5132S supports SMPTE® audio levels where the analog audio reference level is +4 dBu. The Model 5132E supports applications that require European Broadcast Union (EBU) compliance ...
IOSR Journal of VLSI and Signal Processing (IOSR-JVSP)
... and delay, the proposed level shifter named Single Supply Level Shifter (SSLS) has been designed .In this paper single supply level shifter for low power high speed application have been presented and it shows better performance in terms of power consumption , delay as compared to conventional level ...
... and delay, the proposed level shifter named Single Supply Level Shifter (SSLS) has been designed .In this paper single supply level shifter for low power high speed application have been presented and it shows better performance in terms of power consumption , delay as compared to conventional level ...
Measurement & Control for the AC Power Industry
... The relays can be individually programmed to operate from any channel or register, above or below a setpoint value, with or without start up inhibit, programmable hysteresis or deviation or as a timer. Dual PID control is available. Programmable LATCH ON or LATCH OFF (for fail-safe applications) on ...
... The relays can be individually programmed to operate from any channel or register, above or below a setpoint value, with or without start up inhibit, programmable hysteresis or deviation or as a timer. Dual PID control is available. Programmable LATCH ON or LATCH OFF (for fail-safe applications) on ...
Meter Specs - Electro Industries
... Fixed Window (Block) Average interval shall be user-settable from one (1) second to eighteen (18) hours. Sliding Window (Rolling Block) Average sub-interval shall be user-settable from one (1) second to eighteen (18) hours. The number of sub-intervals in the Sliding Window (Rolling Block) Average sh ...
... Fixed Window (Block) Average interval shall be user-settable from one (1) second to eighteen (18) hours. Sliding Window (Rolling Block) Average sub-interval shall be user-settable from one (1) second to eighteen (18) hours. The number of sub-intervals in the Sliding Window (Rolling Block) Average sh ...
Shark 270_Generic_Sp..
... Fixed Window (Block) Average interval shall be user-settable from one (1) second to eighteen (18) hours. Sliding Window (Rolling Block) Average sub-interval shall be user-settable from one (1) second to eighteen (18) hours. The number of sub-intervals in the Sliding Window (Rolling Block) Average sh ...
... Fixed Window (Block) Average interval shall be user-settable from one (1) second to eighteen (18) hours. Sliding Window (Rolling Block) Average sub-interval shall be user-settable from one (1) second to eighteen (18) hours. The number of sub-intervals in the Sliding Window (Rolling Block) Average sh ...
APM Report No. 60
... tests due to lack of flexibility in both performance and positioning. There are some limited use instruments available that are suitable for QC tests, which have an ionization chamber permanently attached or contained within the casing. This type of unit may not be appropriate for exposures performe ...
... tests due to lack of flexibility in both performance and positioning. There are some limited use instruments available that are suitable for QC tests, which have an ionization chamber permanently attached or contained within the casing. This type of unit may not be appropriate for exposures performe ...
Peak programme meter

A peak programme meter (PPM) is an instrument used in professional audio for indicating the level of an audio signal.There are many different kinds of PPM. They fall into broad categories:True peak programme meter. This shows the peak level of the waveform no matter how brief its duration.Quasi peak programme meter (QPPM). This only shows the true level of the peak if it exceeds a certain duration, typically a few milliseconds. On peaks of shorter duration, it will indicate less than the true peak level. The extent of the shortfall is determined by the 'integration time'.Sample peak programme meter (SPPM). This is a PPM for digital audio which shows only peak sample values, not the true waveform peaks (which may fall between samples and be up to 3 dB higher in amplitude). It may have either a 'true' or a 'quasi' integration characteristic.Over-sampling peak programme meter. This is a sample PPM in which the signal has first been over-sampled, typically by a factor of four, to alleviate the problem with a basic sample PPM.In professional usage, where consistent level measurements are needed across an industry, audio level meters often comply with a detailed formal standard. This ensures that all meters that comply with the standard will give the same indication on a given audio signal. The principal standard for PPMs is IEC 60268-10. It describes two different quasi-PPM designs which have their roots in meters originally developed in the 1930s for the AM radio broadcasting networks of Germany (Type I) and the United Kingdom (Type II).The term Peak Programme Meter usually refers to these IEC-specified types and similar designs.PPMs were originally designed for monitoring analogue audio signals but are now also used with digital audio.PPMs do not provide effective loudness monitoring. Newer types of meter do, and there is now a push within the broadcasting industry to move away from traditional level meters such as those featured in this article to two new types: loudness meters based on EBU Tech. 3341 and oversampling true PPMs. The former would be used to standardise broadcast loudness to −23 LUFS and the latter to prevent digital clipping.