• Study Resource
  • Explore
    • Arts & Humanities
    • Business
    • Engineering & Technology
    • Foreign Language
    • History
    • Math
    • Science
    • Social Science

    Top subcategories

    • Advanced Math
    • Algebra
    • Basic Math
    • Calculus
    • Geometry
    • Linear Algebra
    • Pre-Algebra
    • Pre-Calculus
    • Statistics And Probability
    • Trigonometry
    • other →

    Top subcategories

    • Astronomy
    • Astrophysics
    • Biology
    • Chemistry
    • Earth Science
    • Environmental Science
    • Health Science
    • Physics
    • other →

    Top subcategories

    • Anthropology
    • Law
    • Political Science
    • Psychology
    • Sociology
    • other →

    Top subcategories

    • Accounting
    • Economics
    • Finance
    • Management
    • other →

    Top subcategories

    • Aerospace Engineering
    • Bioengineering
    • Chemical Engineering
    • Civil Engineering
    • Computer Science
    • Electrical Engineering
    • Industrial Engineering
    • Mechanical Engineering
    • Web Design
    • other →

    Top subcategories

    • Architecture
    • Communications
    • English
    • Gender Studies
    • Music
    • Performing Arts
    • Philosophy
    • Religious Studies
    • Writing
    • other →

    Top subcategories

    • Ancient History
    • European History
    • US History
    • World History
    • other →

    Top subcategories

    • Croatian
    • Czech
    • Finnish
    • Greek
    • Hindi
    • Japanese
    • Korean
    • Persian
    • Swedish
    • Turkish
    • other →
 
Profile Documents Logout
Upload
Product Lines
Product Lines

Grounding and Bonding - Peck Ormsby Construction
Grounding and Bonding - Peck Ormsby Construction

... Terminate the shield drain wire on a dedicated terminal block. Use manufacturer’s terminal block jumpers to interconnect ground terminals. Connection to the panel main ground bus shall be via a green No. 12 conductor to the main ground bus for the panel. ...
Electrical Safety Tester Verification
Electrical Safety Tester Verification

... Canadian Standards Association (CSA), the Association of German Electrical Engineers (VDE and TUV) and the International Electrotechnical Commision (IEC) set forth various standards to ensure that electrical devices meet set requirements for electrical safety. Performing electrical safety tests is d ...
Model MA260
Model MA260

COURSE SYLLABUS Instructor Information
COURSE SYLLABUS Instructor Information

MODEL 19032/19032-P Electrical Safety Analyzer
MODEL 19032/19032-P Electrical Safety Analyzer

... testing, bad product can pass as good product. When a short occurs during testing, proper screening can reduce the damage on the DUT. DUT's have capacitive loads (Cx) from tens of pF to several uF, in a normal state. A micro capacitance will occur on an open circuit interface once the connection is ...
1. Introduction
1. Introduction

... Testing with or without a control: This question was raised by two members present. It was pointed out that the definition of a recloser includes its control and therefore the entire set of type tests must be performed with its intended control. This includes all of the standard operating test duty. ...
ENGLISH User manual
ENGLISH User manual

... If the instrument does not operate properly, before contacting the After-sales Service, please check the conditions of battery and replace it if necessary. Should the instrument still operate improperly, check that the product is operated according to the instructions given in this manual. Should th ...
TRANSFORMER ISOLATION AND OPTICAL ISOLATON
TRANSFORMER ISOLATION AND OPTICAL ISOLATON

Requirements concerning ELECTRICAL AND ELECTRONIC
Requirements concerning ELECTRICAL AND ELECTRONIC

Noise Control in Strain Gage Measurements
Noise Control in Strain Gage Measurements

... cable has two shields, then, ideally at least, a double-foil shield should be used over the strain gage. The two shields should be connected together only at the instrument end of the cable. ...
Digital Ground Resistance Tester Model 4610 & 4610 Kits
Digital Ground Resistance Tester Model 4610 & 4610 Kits

Introduction  - University of Illinois at Urbana
Introduction - University of Illinois at Urbana

ECH8420 DATA SHEET General-Purpose Switching Device Applications
ECH8420 DATA SHEET General-Purpose Switching Device Applications

HIGH PRECISION SOURCE MEASURE UNIT MODEL 52400 SERIES
HIGH PRECISION SOURCE MEASURE UNIT MODEL 52400 SERIES

... A solar cell has a diode structure type which can be characterized by I-V sweep. The nature of energy generation requires the unique load sweep for light forward I-V curve that is used to derive most of the important parameters of a solar cell. A voltage source will then be required for reverse perf ...
chapter 1 - UniMAP Portal
chapter 1 - UniMAP Portal

High voltage pulse generators and spark gap for gaseous discharge
High voltage pulse generators and spark gap for gaseous discharge

particle impact noise detection (pind) combines
particle impact noise detection (pind) combines

... vibration for particle detection. These procedures are (1) monitored vibration with power applied to the device, and (2) Sinusoidal vibration with mechanical shocks applied at various intervals.[3]. The monitored vibration method is usually specified for testing power transistors and diodes. The tec ...
Analysis Result and Study of LED Head Light Sets
Analysis Result and Study of LED Head Light Sets

PDF:121KB
PDF:121KB

Training Slides
Training Slides

Direct Light-Triggered Solid-State Switches For Pulsed Power Applications  J. Przybilla
Direct Light-Triggered Solid-State Switches For Pulsed Power Applications J. Przybilla

Slide 1
Slide 1

T-90 Datasheet - Dexter Research
T-90 Datasheet - Dexter Research

2nd Year 1st Term Lecture Material_01
2nd Year 1st Term Lecture Material_01

< 1 ... 76 77 78 79 80 81 82 83 84 ... 217 >

Electromagnetic compatibility



Electromagnetic compatibility (EMC) is the branch of electrical sciences which studies the unintentional generation, propagation and reception of electromagnetic energy with reference to the unwanted effects (electromagnetic interference, or EMI) that such energy may induce. The goal of EMC is the correct operation, in the same electromagnetic environment, of different equipment which use electromagnetic phenomena, and the avoidance of any interference effects.In order to achieve this, EMC pursues two different kinds of issues. Emission issues are related to the unwanted generation of electromagnetic energy by some source, and to the countermeasures which should be taken in order to reduce such generation and to avoid the escape of any remaining energies into the external environment. Susceptibility or immunity issues, in contrast, refer to the correct operation of electrical equipment, referred to as the victim, in the presence of unplanned electromagnetic disturbances.Interference mitigation and hence electromagnetic compatibility is achieved by addressing both emission and susceptibility issues, i.e., quieting the sources of interference and hardening the potential victims. The coupling path between source and victim may also be separately addressed to increase its attenuation.
  • studyres.com © 2025
  • DMCA
  • Privacy
  • Terms
  • Report