Relays and Meters - GE Industrial Solutions
... The Multilin line of protection and control products are based on industry leading technologies essential for the reliable operation of mission-critical applications including generation, transmission, distribution, metering, motors, and communications. Multilin protection relays and systems are com ...
... The Multilin line of protection and control products are based on industry leading technologies essential for the reliable operation of mission-critical applications including generation, transmission, distribution, metering, motors, and communications. Multilin protection relays and systems are com ...
Lutron® Commercial systems technical guide
... GRAFIK Integrale: Control shall provide 4 preset lighting scenes and 'off' for up to 4 control zones. Control shall be capable of storing an additional 12 preset lighting scenes which can be accessed via wallstations and/or control interfaces. Up to 32 zones may be tied together in one system. GRAFI ...
... GRAFIK Integrale: Control shall provide 4 preset lighting scenes and 'off' for up to 4 control zones. Control shall be capable of storing an additional 12 preset lighting scenes which can be accessed via wallstations and/or control interfaces. Up to 32 zones may be tied together in one system. GRAFI ...
MC33814, Two cylinder small engine control IC - Data Sheet
... Powered by SMARTMOS technology, the 33814 delivers a cost-optimized IC solution for managing one and two-cylinder engines. With six drivers, three predrivers, a 5.0 V regulator for the MCU, a protected external sensor supply, and a high level of integration, the IC offers an ideal response to contem ...
... Powered by SMARTMOS technology, the 33814 delivers a cost-optimized IC solution for managing one and two-cylinder engines. With six drivers, three predrivers, a 5.0 V regulator for the MCU, a protected external sensor supply, and a high level of integration, the IC offers an ideal response to contem ...
FM HD Radio System - Gates Harris History
... of the dangers inherent in handling potentially hazardous electrical/electronic circuits. It is not intended to contain a complete statement of all safety precautions which should be observed by personnel in using this or other electronic equipment. The installation, operation, maintenance and servi ...
... of the dangers inherent in handling potentially hazardous electrical/electronic circuits. It is not intended to contain a complete statement of all safety precautions which should be observed by personnel in using this or other electronic equipment. The installation, operation, maintenance and servi ...
SUNNY TRIPOWER 8000TL/10000TL/12000TL/15000TL
... Danger to life due to high The product operates at high voltages. All voltages work on the inverter must be carried out by skilled persons only. Risk of burns from hot surfaces ...
... Danger to life due to high The product operates at high voltages. All voltages work on the inverter must be carried out by skilled persons only. Risk of burns from hot surfaces ...
WT1800 Precision Power Analyzer Getting Started Guide User’s
... To have the instrument’s fuse replaced, contact your nearest YOKOGAWA dealer. Do Not Remove the Case The case should be removed by YOKOGAWA’s qualified personnel only. Opening the case is dangerous, because some areas inside the instrument have high voltages. Ground the Instrument before Making Exte ...
... To have the instrument’s fuse replaced, contact your nearest YOKOGAWA dealer. Do Not Remove the Case The case should be removed by YOKOGAWA’s qualified personnel only. Opening the case is dangerous, because some areas inside the instrument have high voltages. Ground the Instrument before Making Exte ...
LF Installation Instructions
... 2. The actuator is usually shipped with the universal clamp mounted to the “CW” side of the actuator. To test for adequate shaft length, slide the actuator over the shaft with the side marked “CW” (or the “CCW” side if this is the side with the clamp). If the shaft extends at least 1/8” through the ...
... 2. The actuator is usually shipped with the universal clamp mounted to the “CW” side of the actuator. To test for adequate shaft length, slide the actuator over the shaft with the side marked “CW” (or the “CCW” side if this is the side with the clamp). If the shaft extends at least 1/8” through the ...
RC-1160 / RC-1260 3.5 MB
... This manual gives installation and operation information for the Comtech EF Data RC-1160 RC1260 Redundancy Switch Controllers. This manual is intended for anyone who installs or operates the unit. ...
... This manual gives installation and operation information for the Comtech EF Data RC-1160 RC1260 Redundancy Switch Controllers. This manual is intended for anyone who installs or operates the unit. ...
CEAG Central Battery System ZB-S
... The 2-pole, bi-directional CG-S data bus in series integrated in the control module is used for data communication between the Central Battery System and connected substations or monitoring devices like CG-Controller or CG-Vision (visualisation software). With an optional available interface-box eac ...
... The 2-pole, bi-directional CG-S data bus in series integrated in the control module is used for data communication between the Central Battery System and connected substations or monitoring devices like CG-Controller or CG-Vision (visualisation software). With an optional available interface-box eac ...
Previous Page Table of Contents Next...
... of BSU power transfer sequences takes place. When external AC power is initially applied to the aircraft AC buses, the BSUs go through the startup BIT, and then switch to use their respective external AC input buses. As we have seen, BSU No. 1 will be on the LH AC bus, and BSU No. 2 on the RH AC bus ...
... of BSU power transfer sequences takes place. When external AC power is initially applied to the aircraft AC buses, the BSUs go through the startup BIT, and then switch to use their respective external AC input buses. As we have seen, BSU No. 1 will be on the LH AC bus, and BSU No. 2 on the RH AC bus ...
Switch Mode Power Supply (15/25/35/50/75/100/150/200/350
... • Global Standards: Conforms to CE (all models), Approved for UL (all models) and CCC (15 to 150-W models). • Easy mounting to DIN Rails with Mounting Brackets. * Refer to Period and Terms of Warranty on page 39. Refer to Safety Precautions for All Power Supplies and Safety Precautions on page 36. ...
... • Global Standards: Conforms to CE (all models), Approved for UL (all models) and CCC (15 to 150-W models). • Easy mounting to DIN Rails with Mounting Brackets. * Refer to Period and Terms of Warranty on page 39. Refer to Safety Precautions for All Power Supplies and Safety Precautions on page 36. ...
www.colehersee.com.au
... starting the engine while the other is used to power auxiliary loads. A battery selector switch enables the use of the first battery, the second battery or both batteries simultaneously. A dual battery system with a battery selector switch provides backup starting power in an emergency. One applicat ...
... starting the engine while the other is used to power auxiliary loads. A battery selector switch enables the use of the first battery, the second battery or both batteries simultaneously. A dual battery system with a battery selector switch provides backup starting power in an emergency. One applicat ...
Adders - La Salle University
... Addition requires only combinatorial logic, the output depends solely on the input and not on any previous state of the system (i.e. no memory is ...
... Addition requires only combinatorial logic, the output depends solely on the input and not on any previous state of the system (i.e. no memory is ...
fr-e700 instruction manual (basic)
... accidentally touch the charged inverter circuits and get an electric shock. z Before wiring or inspection, power must be switched OFF. To confirm that, LED indication of the operation panel must be checked. (It must be OFF.) Any person who is involved in wiring or inspection shall wait for at least ...
... accidentally touch the charged inverter circuits and get an electric shock. z Before wiring or inspection, power must be switched OFF. To confirm that, LED indication of the operation panel must be checked. (It must be OFF.) Any person who is involved in wiring or inspection shall wait for at least ...
4g magnet power supply
... dual units may be paralleled externally by the user to provide the full current capability to a single load, but this requires some special operational considerations. ...
... dual units may be paralleled externally by the user to provide the full current capability to a single load, but this requires some special operational considerations. ...
impedance-based fault location methods for transmission line
... (WRIG) and doubly-fed induction generator (DFIG) are the three common generators used for wind power plants. Therefore, models for these induction generators are developed and the control schemes for each type are simulated to represent a working wind plant. Pitch angle control and variable slip con ...
... (WRIG) and doubly-fed induction generator (DFIG) are the three common generators used for wind power plants. Therefore, models for these induction generators are developed and the control schemes for each type are simulated to represent a working wind plant. Pitch angle control and variable slip con ...
Fundamentals Handbook
... dealing primarily with single-phase equipment, often at the rack level. Many existing computer rooms and small to mid-sized data centers have single-phase loads at the rack level. Ground-up designs are increasingly moving three-phase power to the point of utilization to gain efficiencies and reduce ...
... dealing primarily with single-phase equipment, often at the rack level. Many existing computer rooms and small to mid-sized data centers have single-phase loads at the rack level. Ground-up designs are increasingly moving three-phase power to the point of utilization to gain efficiencies and reduce ...
VACON NXS NXP User Manual
... 5. Obey the installation instructions, see Chapter 5.7 Cable installation. 6. Find information on the control connections in Chapter 6.2.2 Control terminals. 7. If the Start-Up wizard is active, select the language of the keypad and the application. Accept the selections with the Enter button. If th ...
... 5. Obey the installation instructions, see Chapter 5.7 Cable installation. 6. Find information on the control connections in Chapter 6.2.2 Control terminals. 7. If the Start-Up wizard is active, select the language of the keypad and the application. Accept the selections with the Enter button. If th ...
Series-Parallel Networks
... For many single-source, series-parallel networks, the analysis is one that works back to the source, determines the source current, and then finds its way to the desired unknown. In Fig. 7.1(a), for instance, the voltage V4 is desired. The absence of a single series or parallel path to V4 from the s ...
... For many single-source, series-parallel networks, the analysis is one that works back to the source, determines the source current, and then finds its way to the desired unknown. In Fig. 7.1(a), for instance, the voltage V4 is desired. The absence of a single series or parallel path to V4 from the s ...
Electrical substation
A substation is a part of an electrical generation, transmission, and distribution system. Substations transform voltage from high to low, or the reverse, or perform any of several other important functions. Between the generating station and consumer, electric power may flow through several substations at different voltage levels.Substations may be owned and operated by an electrical utility, or may be owned by a large industrial or commercial customer. Generally substations are unattended, relying on SCADA for remote supervision and control.A substation may include transformers to change voltage levels between high transmission voltages and lower distribution voltages, or at the interconnection of two different transmission voltages. The word substation comes from the days before the distribution system became a grid. As central generation stations became larger, smaller generating plants were converted to distribution stations, receiving their energy supply from a larger plant instead of using their own generators. The first substations were connected to only one power station, where the generators were housed, and were subsidiaries of that power station.