
Understanding and minimising ADC conversion errors
... The purpose of this document is to explain the different ADC errors and the techniques that application developers can use to minimise them. The ADC (Analog to Digital Converter) is an important peripheral that connects the analog world to the digital world of microcontrollers. In this application n ...
... The purpose of this document is to explain the different ADC errors and the techniques that application developers can use to minimise them. The ADC (Analog to Digital Converter) is an important peripheral that connects the analog world to the digital world of microcontrollers. In this application n ...
AN-6005 Synchronous buck MOSFET loss calculations
... Appendix: Using the efficiency and loss calculation spreadsheet tool The spreadsheet is avaiable at the following : https://www.fairchildsemi.com/design/design-tools/switching-loss-calculation-tool/ The spreadsheet implements the loss calculations described in this app note. To see the sheet in acti ...
... Appendix: Using the efficiency and loss calculation spreadsheet tool The spreadsheet is avaiable at the following : https://www.fairchildsemi.com/design/design-tools/switching-loss-calculation-tool/ The spreadsheet implements the loss calculations described in this app note. To see the sheet in acti ...
MK Dimming Compatibility Guide
... Every dimmer has a defined operating voltage and power rating. Overloading a dimmer with too many lamps or transformers is likely to result in failure to illuminate, flickering or delays in dimming. Lamps might display ‘stepping’ in lumen (light) output at points within the dimming range and occasio ...
... Every dimmer has a defined operating voltage and power rating. Overloading a dimmer with too many lamps or transformers is likely to result in failure to illuminate, flickering or delays in dimming. Lamps might display ‘stepping’ in lumen (light) output at points within the dimming range and occasio ...
INTERNATIONAL STANDARD IEC 60044-2
... Table 2 – Standard values of rated voltage factors .................................................................29 Table 3 – Limits of temperature rise of windings ....................................................................31 Table 4 – Rated insulation levels for transformer primary win ...
... Table 2 – Standard values of rated voltage factors .................................................................29 Table 3 – Limits of temperature rise of windings ....................................................................31 Table 4 – Rated insulation levels for transformer primary win ...
PAM8007
... At this stage it is paramount to notice the necessity of separate grounds. Noise currents in the output power stage need to be returned to output noise ground and nowhere else. Were these currents to circulate elsewhere, they may get into the power supply, the signal ground, etc, worse yet, they may ...
... At this stage it is paramount to notice the necessity of separate grounds. Noise currents in the output power stage need to be returned to output noise ground and nowhere else. Were these currents to circulate elsewhere, they may get into the power supply, the signal ground, etc, worse yet, they may ...
DUP45V6P5 Features Mechanical Data
... written approval of the Chief Executive Officer of Diodes Incorporated. As used herein: A. Life support devices or systems are devices or systems which: 1. are intended to implant into the body, or 2. support or sustain life and whose failure to perform when properly used in accordance with instruct ...
... written approval of the Chief Executive Officer of Diodes Incorporated. As used herein: A. Life support devices or systems are devices or systems which: 1. are intended to implant into the body, or 2. support or sustain life and whose failure to perform when properly used in accordance with instruct ...
AT10.1 SERIES CHARGERS AT10.1 SERIES CHARGERS
... receipt before signing, and notify the delivery person of your findings. If loss or damage is discovered after delivery, notify delivering carrier immediately and request an inspection. The manufacturer does not assume any liability for damage during transportation or handling. Should the goods requ ...
... receipt before signing, and notify the delivery person of your findings. If loss or damage is discovered after delivery, notify delivering carrier immediately and request an inspection. The manufacturer does not assume any liability for damage during transportation or handling. Should the goods requ ...
dc voltage gradient surveys
... The incorporation of our GPS technology has resulted in both speeding up the inspection and improving on our repeatability and accuracy of relocating pipeline coating defects. 4.0 How is the Signal Injected? The technique is a DC method and normally existing cathodic protection systems are used to i ...
... The incorporation of our GPS technology has resulted in both speeding up the inspection and improving on our repeatability and accuracy of relocating pipeline coating defects. 4.0 How is the Signal Injected? The technique is a DC method and normally existing cathodic protection systems are used to i ...
E-MOSFET Characteristics and Parameters
... The conductivity of channel is enhanced by increase VGS and thus pulling more electrons into channel area. ...
... The conductivity of channel is enhanced by increase VGS and thus pulling more electrons into channel area. ...
Technical Information
... Most transformer installations today are used to power circuits containing solid state devices sensitive to electrical noise, transients and voltage spikes. While the possibility of voltage spikes due to lighting strikes on nearby transmission lines exists, the more frequent threat to electronic e ...
... Most transformer installations today are used to power circuits containing solid state devices sensitive to electrical noise, transients and voltage spikes. While the possibility of voltage spikes due to lighting strikes on nearby transmission lines exists, the more frequent threat to electronic e ...
USER MANUAL
... gas formation taking place, caused by overcharging. It is not necessary to disconnect the battery from the charger during long time storage, for example during the winter storage of a ship. The Skylla-TG charger will keep your battery in optimum condition under all circumstances and will prolong the ...
... gas formation taking place, caused by overcharging. It is not necessary to disconnect the battery from the charger during long time storage, for example during the winter storage of a ship. The Skylla-TG charger will keep your battery in optimum condition under all circumstances and will prolong the ...
TOPIC: 191005 KNOWLEDGE: K1.01 [2.8/3.1]
... KNOWLEDGE: K1.01 [2.8/3.1] QID: P3127 (B2826) A motor-driven centrifugal pump exhibits indications of pump failure while being started in an idle cooling water system. Assuming the pump motor breaker does not trip, which one of the following pairs of indications would be observed if the failure is a ...
... KNOWLEDGE: K1.01 [2.8/3.1] QID: P3127 (B2826) A motor-driven centrifugal pump exhibits indications of pump failure while being started in an idle cooling water system. Assuming the pump motor breaker does not trip, which one of the following pairs of indications would be observed if the failure is a ...
Principles of Doubly-Fed Induction Generators (DFIG)
... electric machines have only recently entered into common use. This is due almost exclusively to the advent of wind power technologies for electricity generation. Doubly-fed induction generators (DFIGs) are by far the most widely used type of doubly-fed electric machine, and are one of the most commo ...
... electric machines have only recently entered into common use. This is due almost exclusively to the advent of wind power technologies for electricity generation. Doubly-fed induction generators (DFIGs) are by far the most widely used type of doubly-fed electric machine, and are one of the most commo ...
Electrical Installations Lab AEL-1 Advanced Electrical Laboratories (AEL-LABS):
... The workbench can be supplied with one or two touch screens and computers. Thus, both students and teachers gain quick access to the applications to control them better, obtaining the maximum man-machine interaction. In summary, technology, quality and aesthetics are combined in this piece of furnit ...
... The workbench can be supplied with one or two touch screens and computers. Thus, both students and teachers gain quick access to the applications to control them better, obtaining the maximum man-machine interaction. In summary, technology, quality and aesthetics are combined in this piece of furnit ...
DAC161S997 16-bit SPI Programmable DAC for 4
... When a loop error occurs, the DAC161S997 sets the CURR_LOOP_STATUS and LOOP_STATUS fields in the STATUS register to 1. The LOOP_STATUS field remains set to 1 until the STATUS register is read or the device is reset. If the loop error is cleared, either by the device reasserting the loop current or b ...
... When a loop error occurs, the DAC161S997 sets the CURR_LOOP_STATUS and LOOP_STATUS fields in the STATUS register to 1. The LOOP_STATUS field remains set to 1 until the STATUS register is read or the device is reset. If the loop error is cleared, either by the device reasserting the loop current or b ...
NorMax® - Norelco Oy
... uses reliable overcurrent, short circuit and earth fault current relay protection. Alternative relay according customer needs can be fitted. ...
... uses reliable overcurrent, short circuit and earth fault current relay protection. Alternative relay according customer needs can be fitted. ...
g ESBWR Design Control Document Tier 2
... 8.1.2 Utility Power Grid and Off-site Systems Description ............................................. 8.1-1 8.1.2.1 Utility Power Grid Description......................................................................... 8.1-1 8.1.2.2 Off-site Power System Description .............................. ...
... 8.1.2 Utility Power Grid and Off-site Systems Description ............................................. 8.1-1 8.1.2.1 Utility Power Grid Description......................................................................... 8.1-1 8.1.2.2 Off-site Power System Description .............................. ...