Passive House and High- Performance New
... comfortable year-round. Fresh air and exhaust are provided by an energy recovery ventilator (ERV) that captures heat and regulates humidity. The house has no central heating system or gas meter. Instead, heating and cooling demands are met by a ductless electric heat pump system. Triple-paned window ...
... comfortable year-round. Fresh air and exhaust are provided by an energy recovery ventilator (ERV) that captures heat and regulates humidity. The house has no central heating system or gas meter. Instead, heating and cooling demands are met by a ductless electric heat pump system. Triple-paned window ...
Residential Design – High Density Code (Word
... A22.4 Vehicle movement areas are located a minimum of 3m from any adjoining dwellings and acoustic screening is provided next to any vehicle movement or parking areas along the side or rear boundary ...
... A22.4 Vehicle movement areas are located a minimum of 3m from any adjoining dwellings and acoustic screening is provided next to any vehicle movement or parking areas along the side or rear boundary ...
Aalborg Universitet Heiselberg, Per Kvols
... realized by refurbishing a traditional rural building, “curmà”, widely diffuse in Piedmont Region and, for this reason, represents a good nZEB model at regional and national levels. The new single-storey volume is inserted under the preexisting roof, whose wooden structure and tiles covering were ma ...
... realized by refurbishing a traditional rural building, “curmà”, widely diffuse in Piedmont Region and, for this reason, represents a good nZEB model at regional and national levels. The new single-storey volume is inserted under the preexisting roof, whose wooden structure and tiles covering were ma ...
plan review standards - Williston Fire Department
... Department requires a reasonable period of time to review plans. Although it is expected that plans can be reviewed within a two week time frame, applicants should expect a longer turnaround time for more complex projects. Plans shall be submitted to the Williston Fire Department for the following: ...
... Department requires a reasonable period of time to review plans. Although it is expected that plans can be reviewed within a two week time frame, applicants should expect a longer turnaround time for more complex projects. Plans shall be submitted to the Williston Fire Department for the following: ...
Retrofit net zero-energy commercial buildings PDF
... 50,000 non-residential buildings within New Zealand, with a total floor area of 48.3 million m². Templates of typical non-residential buildings have been developed based on generic New Zealand building information and will be refined using information and data gathered in the Building Energy End-use ...
... 50,000 non-residential buildings within New Zealand, with a total floor area of 48.3 million m². Templates of typical non-residential buildings have been developed based on generic New Zealand building information and will be refined using information and data gathered in the Building Energy End-use ...
ATACAMA RESIDENCE HOTEL
... There will be a maximum amount of optimally directed vacuum tube collectors placed on the roof of the main building. Solar provided energy is used to heat the utilization water and the radiant heating system. The energy is reserved into hot water storage cylinders. From the cylinders a needed amount ...
... There will be a maximum amount of optimally directed vacuum tube collectors placed on the roof of the main building. Solar provided energy is used to heat the utilization water and the radiant heating system. The energy is reserved into hot water storage cylinders. From the cylinders a needed amount ...
Building management systems
... Building management systems Nobbs & Jones supply bespoke heating, ventilation and air conditioning (HVAC) Building Management Systems (BMS) using PLCs designed specifically for the building controls industry. Information such as temperature, humidity, status, etc. can be shared between each of these ...
... Building management systems Nobbs & Jones supply bespoke heating, ventilation and air conditioning (HVAC) Building Management Systems (BMS) using PLCs designed specifically for the building controls industry. Information such as temperature, humidity, status, etc. can be shared between each of these ...
The Skyscraper of the Future: Integrating a Flexible
... new construction, it is not a question of what should be done – it’s a matter of understanding who determines why it should be done. In New York, high-rise development is frequently just meeting code requirements for energy efficiency, which set a minimum baseline. It seems that unless change is man ...
... new construction, it is not a question of what should be done – it’s a matter of understanding who determines why it should be done. In New York, high-rise development is frequently just meeting code requirements for energy efficiency, which set a minimum baseline. It seems that unless change is man ...
iwui code talking points - International Association of Wildland Fire
... 2. It is important to utilize local land use planning guidance that includes GIS mapping that identifies specific WUI areas. It is also important to have a Community Wildfire Protection Plan (CWPP) that helps analyze the wildland fire problem. In addition targeting jurisdictions that have already ad ...
... 2. It is important to utilize local land use planning guidance that includes GIS mapping that identifies specific WUI areas. It is also important to have a Community Wildfire Protection Plan (CWPP) that helps analyze the wildland fire problem. In addition targeting jurisdictions that have already ad ...
Central Atrium - NSW Department of Education
... system, allowing for natural ventilation 55 per cent of the time. When natural ventilation is not in operation, heating and cooling is mechanically managed by fan coil units. The system operates in two modes, daytime and night time. Initially the BMS was automatically set but following post occupanc ...
... system, allowing for natural ventilation 55 per cent of the time. When natural ventilation is not in operation, heating and cooling is mechanically managed by fan coil units. The system operates in two modes, daytime and night time. Initially the BMS was automatically set but following post occupanc ...
Building Sustainable Mega Skyscr - Illumin
... exterior filter membrane that take up the space of an entire floor at mid to higher levels of the structure and collect harmful carbon dioxide from air and convert it into oxygen, thereby improving the quality inside and around the building. Heat recovery windows will be installed were windows are r ...
... exterior filter membrane that take up the space of an entire floor at mid to higher levels of the structure and collect harmful carbon dioxide from air and convert it into oxygen, thereby improving the quality inside and around the building. Heat recovery windows will be installed were windows are r ...
CLE ARING Elements of an Energy-Efficient House
... Such buildings are also very strong and easily exceed code requirements for areas prone to tornadoes or hurricanes. ...
... Such buildings are also very strong and easily exceed code requirements for areas prone to tornadoes or hurricanes. ...
Construction Concerns: Wood Frame Concealed Spaces
... for the HVAC system. Drywall board can be fastened to one side of the wood studs above the suspended ceiling to form a draft stop, to subdivide the concealed space, and to slow the spread of smoke if there is a fire in the building (as shown in the background room in photo 3). These are required in ...
... for the HVAC system. Drywall board can be fastened to one side of the wood studs above the suspended ceiling to form a draft stop, to subdivide the concealed space, and to slow the spread of smoke if there is a fire in the building (as shown in the background room in photo 3). These are required in ...
greek traditional bioclimatic architecture
... Use of local building materials in traditional architecture, was due to limited transportation potential, in older times. Nevertheless, ecologically was a perfect choice, and contributed substantially to the morphological wealth of Greek traditional architecture. When building materials with special ...
... Use of local building materials in traditional architecture, was due to limited transportation potential, in older times. Nevertheless, ecologically was a perfect choice, and contributed substantially to the morphological wealth of Greek traditional architecture. When building materials with special ...
Construction Revision Materials Unit 1
... ● types of sound insulation: triple glazing, heavy-density blockwork, sound insulation quilt, plasterboard layers, flooring mats, carpeting, acoustic ceilings ● location: floor, wall and ceiling construction between adjacent rooms and flats, party walls, internal partition walls, windows, doors ● pr ...
... ● types of sound insulation: triple glazing, heavy-density blockwork, sound insulation quilt, plasterboard layers, flooring mats, carpeting, acoustic ceilings ● location: floor, wall and ceiling construction between adjacent rooms and flats, party walls, internal partition walls, windows, doors ● pr ...
the church and building law - The Methodist Church of New Zealand
... existing buildings throughout New Zealand, it is likely you will be affected by the Building Act.2004. The Building Act 2004 sets standards and procedures for those involved in building work to ensure buildings are constructed to comply with the current Building Code. The Building Code covers how wo ...
... existing buildings throughout New Zealand, it is likely you will be affected by the Building Act.2004. The Building Act 2004 sets standards and procedures for those involved in building work to ensure buildings are constructed to comply with the current Building Code. The Building Code covers how wo ...
Building Control Guidance Note 24 - Guide 6
... 2. The list of work in Schedule 2B (work that need not be notified to building control) is amended to include the installation of thermal insulation in a roof space or loft space where this is the only work carried out and the work is not carried out to comply with any requirement in the Building Re ...
... 2. The list of work in Schedule 2B (work that need not be notified to building control) is amended to include the installation of thermal insulation in a roof space or loft space where this is the only work carried out and the work is not carried out to comply with any requirement in the Building Re ...
Sustainable Construction
... maximize comfort for the household. The South facing windows are triple glazed to prevent heat loss. Overhangs are strategically orientated such that they provide shade from the hot summer sun while allowing rays from the low winter sun to penetrate helping to warm the home when most needed. No ...
... maximize comfort for the household. The South facing windows are triple glazed to prevent heat loss. Overhangs are strategically orientated such that they provide shade from the hot summer sun while allowing rays from the low winter sun to penetrate helping to warm the home when most needed. No ...
Plan Submittal – New Commercial Buildings
... 1. Cover sheet - legal job address and APN (assessors parcel number), name, address and phone number of owner, contractor, contact name, address and phone number, title and registration information of project design professional, description of work (including current applicable codes), type of cons ...
... 1. Cover sheet - legal job address and APN (assessors parcel number), name, address and phone number of owner, contractor, contact name, address and phone number, title and registration information of project design professional, description of work (including current applicable codes), type of cons ...
Bury Metropolitan Borough Council
... 4.2.3. Evac-Chairs – These can be used to assist disabled people downstairs and are provided in some buildings. Each wheelchair using or mobility impaired disabled member of staff should be given the opportunity to have an Evac-Chair located adjacent to their place of work. Evac-Chairs are also prov ...
... 4.2.3. Evac-Chairs – These can be used to assist disabled people downstairs and are provided in some buildings. Each wheelchair using or mobility impaired disabled member of staff should be given the opportunity to have an Evac-Chair located adjacent to their place of work. Evac-Chairs are also prov ...
A market overview of erected low-energy buildings in Sweden
... he recently revised directive on the energy performance of buildings (2010/31/EU) contains requirements that all new-build public buildings must meet the requirements for “near zero-energy buildings” by 1st January 2019, and that the same will apply to all buildings with effect from 1st January 2021 ...
... he recently revised directive on the energy performance of buildings (2010/31/EU) contains requirements that all new-build public buildings must meet the requirements for “near zero-energy buildings” by 1st January 2019, and that the same will apply to all buildings with effect from 1st January 2021 ...
Mixed-Use Infill Development General
... within a development parcel. The Planning Board shall approve all lot sizes located within a development parcel. 13.23.3 For the purpose of computing residential density, the minimum land area for each dwelling unit shall be six hundred (600) square feet. Residential density shall be computed based ...
... within a development parcel. The Planning Board shall approve all lot sizes located within a development parcel. 13.23.3 For the purpose of computing residential density, the minimum land area for each dwelling unit shall be six hundred (600) square feet. Residential density shall be computed based ...
Development Application Form
... • Approval is to be obtained from Government Services (Health), and any or all of the following departments, as applicable: Fire Life & Safety, Building Accessibility, Transportation, Environment, and/or Crown Lands. • Builder must maintain reasonable cleanliness of site at all times. • For back lot ...
... • Approval is to be obtained from Government Services (Health), and any or all of the following departments, as applicable: Fire Life & Safety, Building Accessibility, Transportation, Environment, and/or Crown Lands. • Builder must maintain reasonable cleanliness of site at all times. • For back lot ...
EPBD: Buildings directive demands low energy
... The EPBD is implemented in the valid national legislation of all EU member states via national ordinances. The Energy Saving Regulation [EnEV] provides the adaptation of the European directives in Germany and the RT2012 in France. The German EnEV has required again an increased energy standard for n ...
... The EPBD is implemented in the valid national legislation of all EU member states via national ordinances. The Energy Saving Regulation [EnEV] provides the adaptation of the European directives in Germany and the RT2012 in France. The German EnEV has required again an increased energy standard for n ...
Assessing Building Vulnerability - Environment and Natural Resources
... buildings. The FCI will be used to determine if it is cost-effective to invest in repairs or if the GNWT should instead consider building new structures. This project will help adaptation and capital planning within the GNWT by completing a risk evaluation of public buildings in many NWT communities ...
... buildings. The FCI will be used to determine if it is cost-effective to invest in repairs or if the GNWT should instead consider building new structures. This project will help adaptation and capital planning within the GNWT by completing a risk evaluation of public buildings in many NWT communities ...