• Study Resource
  • Explore Categories
    • Arts & Humanities
    • Business
    • Engineering & Technology
    • Foreign Language
    • History
    • Math
    • Science
    • Social Science

    Top subcategories

    • Advanced Math
    • Algebra
    • Basic Math
    • Calculus
    • Geometry
    • Linear Algebra
    • Pre-Algebra
    • Pre-Calculus
    • Statistics And Probability
    • Trigonometry
    • other →

    Top subcategories

    • Astronomy
    • Astrophysics
    • Biology
    • Chemistry
    • Earth Science
    • Environmental Science
    • Health Science
    • Physics
    • other →

    Top subcategories

    • Anthropology
    • Law
    • Political Science
    • Psychology
    • Sociology
    • other →

    Top subcategories

    • Accounting
    • Economics
    • Finance
    • Management
    • other →

    Top subcategories

    • Aerospace Engineering
    • Bioengineering
    • Chemical Engineering
    • Civil Engineering
    • Computer Science
    • Electrical Engineering
    • Industrial Engineering
    • Mechanical Engineering
    • Web Design
    • other →

    Top subcategories

    • Architecture
    • Communications
    • English
    • Gender Studies
    • Music
    • Performing Arts
    • Philosophy
    • Religious Studies
    • Writing
    • other →

    Top subcategories

    • Ancient History
    • European History
    • US History
    • World History
    • other →

    Top subcategories

    • Croatian
    • Czech
    • Finnish
    • Greek
    • Hindi
    • Japanese
    • Korean
    • Persian
    • Swedish
    • Turkish
    • other →
 
Profile Documents Logout
Upload
Evaluation of Power Transistors Figure of Merit for Hard
Evaluation of Power Transistors Figure of Merit for Hard

... FOM evaluation was made parametrically, i.e., in dependency on the parameters that are influencing hard-switching commutation mode in the most manners (switching frequency, load current). Figure 2 to Figure 4 are showing results from parametrical experimental analysis of switching performance of tra ...
Tektronix MBD: Products > Current Measurement Systems AM5030
Tektronix MBD: Products > Current Measurement Systems AM5030

Troubleshooting accelerometer installations
Troubleshooting accelerometer installations

... mechanical causes of an overload in the sensor are severe pump cavitation, steam release, impacts from loose or reciprocating parts and even gearmesh. One way to reduce clipping is to use a higher power supply voltage and ensure that the bias voltage is centered between supply voltage and ground vol ...
300 /MPC300T Test Procedure MPC b
300 /MPC300T Test Procedure MPC b

... filter is engaged on the analyzer. Check distributed lines (70V, 100V) with 40 ohm, 20 ohm, or 10 ohm loads to ensure that both channels will produce rated power at 45Hz, 2kHz, and 16kHz. ! THERMAL TEST 1. Set input frequency to 1KHz and short both channels while they are producing power into a load ...
Voltage Quality in the context of EMC
Voltage Quality in the context of EMC

... achieve compatibility. One possible such case can be requirements when incandescent lamps on a large scale are being replaced by low energy lamps using electronics. At medium and high voltage levels, with a lack of comprehensive standards for emissions and immunity, the grid operator or owner should ...
Aalborg Universitet Benchmarking of Grid Fault Modes in Single-Phase Grid-Connected Photovoltaic Systems
Aalborg Universitet Benchmarking of Grid Fault Modes in Single-Phase Grid-Connected Photovoltaic Systems

... One essential basis of the design and control for gridconnected PV inverters is the grid requirements. In some international regulations [3], it is addressed that PV inverters should disconnect from the grid in the presence of abnormal grid conditions in terms of voltage and frequency at the point o ...
A Review of Energy Harvesting From Piezoelectric Materials S. M.Taware
A Review of Energy Harvesting From Piezoelectric Materials S. M.Taware

... portable and wireless devices must be designed to include electrochemical batteries as the power source. The use of batteries can be troublesome due to their limited lifespan, thus necessitating their periodic replacement. In the case of wireless sensors that are to be placed in remote locations, th ...
Overcurrent Protection
Overcurrent Protection

... l.v. source of supply provided by the supply company is 40kA. – All fuses and MCCBs at source of energy must have breaking capacity > 40kA – Fault current protective devices with smaller breaking capacities are generally acceptable if they are backed up by fuses to BS88-2.1 or BS88-6 (Backup protect ...
Space Vector of Three Phase Three level Neutral Point
Space Vector of Three Phase Three level Neutral Point

PPT EN version
PPT EN version

... » Unearthed accessible conductive parts shall be assumed to be connected to an earth terminal » Floating circuit assumed to be connected to an earth terminal at the point which results in the highest working voltage being obtained; » Double insulation: short-circuit across on of the insulation when ...
HIGH PRECISION SOURCE MEASURE UNIT MODEL 52400 SERIES
HIGH PRECISION SOURCE MEASURE UNIT MODEL 52400 SERIES

... A solar cell has a diode structure type which can be characterized by I-V sweep. The nature of energy generation requires the unique load sweep for light forward I-V curve that is used to derive most of the important parameters of a solar cell. A voltage source will then be required for reverse perf ...
Overview of High Performance Analog Optocouplers
Overview of High Performance Analog Optocouplers

... controller, typically a PLC or a microcontroller could also be a sizeable distance. Additional requirement in such an application could be for high voltage insulation or galvanic insulation for safety protection either of operators or expensive digital logic. Both of these critical requirements can ...
2. Traction Drive with PMSM
2. Traction Drive with PMSM

... in particular for urban mass transportation systems. The very real assumptions to PMSM motor usage at railway vehicles, where the very strict legislation focused on EMC of vehicles and interlocking devices is valid, exist in consideration of their favorable properties. The presentation of existence ...
5 - Maryland Public Service Commission
5 - Maryland Public Service Commission

LB3419962001
LB3419962001

... because a wide variation of the switching frequency is necessary to control the output voltage. Some modified converters based on a conventional SRC have been presented to solve these problems. One is a converter that utilizes other control methods without additional hardware. By using a control met ...
2008 IEEE. Personal use of this material is
2008 IEEE. Personal use of this material is

... This paper proposes a new hybrid approach based on GA and fuzzy approximate reasoning for the optimal placement and sizing of capacitor banks in distorted distribution networks with harmonic voltages and currents. GAs use biological evolution and population genetics to search and arrive at a high-qu ...
THE HIGH RESISTANCE GROUNDED POWER SYSTEM
THE HIGH RESISTANCE GROUNDED POWER SYSTEM

... HRG Systems National Electrical Code (2005) ...
HOW TO SPECIFY THE OPTIMUM NON-GAPPED LINE ARRESTERS (NGLA)
HOW TO SPECIFY THE OPTIMUM NON-GAPPED LINE ARRESTERS (NGLA)

... shorter lines or at one third and two thirds of the line length for longer EHV lines. The NGLA can be used separately or together with other systems like controlled switching. The target is always non-tripping due to switching. Typically the energy/charge requirements for these NGLA is one class low ...
Practical realization of propulsion unit with low voltage permanent
Practical realization of propulsion unit with low voltage permanent

... The energy source is a series-parallel connection of modern LiFePo4 cells, which have currently some of the best properties. Parameters of one cell are: nominal capacity C=40 Ah, charging voltage 4.25 V, nominal voltage 3.2 V, the maximum charge and discharge current 3 CA, discharge pulse current 10 ...
PDF
PDF

... more suited to high power applications and they enable the design of multilevel inverters. The II. Photovoltaic and Battery Energy constraints due to commutation phenomena are also reduced and each component supports a much Generation: smaller fraction of the DC-bus voltage when the Photovoltaic (PV ...
SCIENTIFIC PAPERS OF THE UNIVERSITY OF PARDUBICE
SCIENTIFIC PAPERS OF THE UNIVERSITY OF PARDUBICE

... Faculty of Electrical Engineering, University of West Bohemia in Pilsen Eva VEJVODOVÁ Department of Technologies and Measurement, Faculty of Electrical Engineering, University of West Bohemia in Pilsen ...
WECC Type 4 Wind Turbine Generator Model – Phase II
WECC Type 4 Wind Turbine Generator Model – Phase II

... using this new proposed model and gave similar responses as reported previously. This is also documented in [2], which is a freely available report. A perusal of the simulation in [2] will show that a wide range of operating conditions have been simulated based on measured data from several vendors. ...
HINCP Series Basic Control Contactor Panel Interiors Installation
HINCP Series Basic Control Contactor Panel Interiors Installation

... The panel is shipped with an integral transformer, either 115 VAC or 277 VAC. The transformer provided can be determined by the catalog number of the HINCP interior, which ends in either -115 or -277. A red warning label identifying the correct voltage is also applied over the power terminals. Refer ...
Versa-Pac as Flyback
Versa-Pac as Flyback

Stakeholder Comment and Replies Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Alberta Reliability Standard
Stakeholder Comment and Replies Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Alberta Reliability Standard

... of this standard. The removal of these entities would be consistent with the findings of NERC Order 733 which states in paragraph 342: The Reliability Standard applies to facilities 100 kV and above and to transformers with lowvoltage terminals 200 kV and above. Because there are no commercial gener ...
< 1 ... 419 420 421 422 423 424 425 426 427 ... 1128 >

Power engineering



Power engineering, also called power systems engineering, is a subfield of energy engineering that deals with the generation, transmission, distribution and utilization of electric power and the electrical devices connected to such systems including generators, motors and transformers. Although much of the field is concerned with the problems of three-phase AC power – the standard for large-scale power transmission and distribution across the modern world – a significant fraction of the field is concerned with the conversion between AC and DC power and the development of specialized power systems such as those used in aircraft or for electric railway networks. It was a subfield of electrical engineering before the emergence of energy engineering.Electricity became a subject of scientific interest in the late 17th century with the work of William Gilbert. Over the next two centuries a number of important discoveries were made including the incandescent light bulb and the voltaic pile. Probably the greatest discovery with respect to power engineering came from Michael Faraday who in 1831 discovered that a change in magnetic flux induces an electromotive force in a loop of wire—a principle known as electromagnetic induction that helps explain how generators and transformers work.In 1881 two electricians built the world's first power station at Godalming in England. The station employed two waterwheels to produce an alternating current that was used to supply seven Siemens arc lamps at 250 volts and thirty-four incandescent lamps at 40 volts. However supply was intermittent and in 1882 Thomas Edison and his company, The Edison Electric Light Company, developed the first steam-powered electric power station on Pearl Street in New York City. The Pearl Street Station consisted of several generators and initially powered around 3,000 lamps for 59 customers. The power station used direct current and operated at a single voltage. Since the direct current power could not be easily transformed to the higher voltages necessary to minimise power loss during transmission, the possible distance between the generators and load was limited to around half-a-mile (800 m).That same year in London Lucien Gaulard and John Dixon Gibbs demonstrated the first transformer suitable for use in a real power system. The practical value of Gaulard and Gibbs' transformer was demonstrated in 1884 at Turin where the transformer was used to light up forty kilometres (25 miles) of railway from a single alternating current generator. Despite the success of the system, the pair made some fundamental mistakes. Perhaps the most serious was connecting the primaries of the transformers in series so that switching one lamp on or off would affect other lamps further down the line. Following the demonstration George Westinghouse, an American entrepreneur, imported a number of the transformers along with a Siemens generator and set his engineers to experimenting with them in the hopes of improving them for use in a commercial power system.One of Westinghouse's engineers, William Stanley, recognised the problem with connecting transformers in series as opposed to parallel and also realised that making the iron core of a transformer a fully enclosed loop would improve the voltage regulation of the secondary winding. Using this knowledge he built a much improved alternating current power system at Great Barrington, Massachusetts in 1886. In 1885 the Italian physicist and electrical engineer Galileo Ferraris demonstrated an induction motor and in 1887 and 1888 the Serbian-American engineer Nikola Tesla filed a range of patents related to power systems including one for a practical two-phase induction motor which Westinghouse licensed for his AC system.By 1890 the power industry had flourished and power companies had built thousands of power systems (both direct and alternating current) in the United States and Europe – these networks were effectively dedicated to providing electric lighting. During this time a fierce rivalry in the US known as the ""War of Currents"" emerged between Edison and Westinghouse over which form of transmission (direct or alternating current) was superior. In 1891, Westinghouse installed the first major power system that was designed to drive an electric motor and not just provide electric lighting. The installation powered a 100 horsepower (75 kW) synchronous motor at Telluride, Colorado with the motor being started by a Tesla induction motor. On the other side of the Atlantic, Oskar von Miller built a 20 kV 176 km three-phase transmission line from Lauffen am Neckar to Frankfurt am Main for the Electrical Engineering Exhibition in Frankfurt. In 1895, after a protracted decision-making process, the Adams No. 1 generating station at Niagara Falls began transmitting three-phase alternating current power to Buffalo at 11 kV. Following completion of the Niagara Falls project, new power systems increasingly chose alternating current as opposed to direct current for electrical transmission.Although the 1880s and 1890s were seminal decades in the field, developments in power engineering continued throughout the 20th and 21st century. In 1936 the first commercial high-voltage direct current (HVDC) line using mercury-arc valves was built between Schenectady and Mechanicville, New York. HVDC had previously been achieved by installing direct current generators in series (a system known as the Thury system) although this suffered from serious reliability issues. In 1957 Siemens demonstrated the first solid-state rectifier (solid-state rectifiers are now the standard for HVDC systems) however it was not until the early 1970s that this technology was used in commercial power systems. In 1959 Westinghouse demonstrated the first circuit breaker that used SF6 as the interrupting medium. SF6 is a far superior dielectric to air and, in recent times, its use has been extended to produce far more compact switching equipment (known as switchgear) and transformers. Many important developments also came from extending innovations in the ICT field to the power engineering field. For example, the development of computers meant load flow studies could be run more efficiently allowing for much better planning of power systems. Advances in information technology and telecommunication also allowed for much better remote control of the power system's switchgear and generators.
  • studyres.com © 2026
  • DMCA
  • Privacy
  • Terms
  • Report