• Study Resource
  • Explore Categories
    • Arts & Humanities
    • Business
    • Engineering & Technology
    • Foreign Language
    • History
    • Math
    • Science
    • Social Science

    Top subcategories

    • Advanced Math
    • Algebra
    • Basic Math
    • Calculus
    • Geometry
    • Linear Algebra
    • Pre-Algebra
    • Pre-Calculus
    • Statistics And Probability
    • Trigonometry
    • other →

    Top subcategories

    • Astronomy
    • Astrophysics
    • Biology
    • Chemistry
    • Earth Science
    • Environmental Science
    • Health Science
    • Physics
    • other →

    Top subcategories

    • Anthropology
    • Law
    • Political Science
    • Psychology
    • Sociology
    • other →

    Top subcategories

    • Accounting
    • Economics
    • Finance
    • Management
    • other →

    Top subcategories

    • Aerospace Engineering
    • Bioengineering
    • Chemical Engineering
    • Civil Engineering
    • Computer Science
    • Electrical Engineering
    • Industrial Engineering
    • Mechanical Engineering
    • Web Design
    • other →

    Top subcategories

    • Architecture
    • Communications
    • English
    • Gender Studies
    • Music
    • Performing Arts
    • Philosophy
    • Religious Studies
    • Writing
    • other →

    Top subcategories

    • Ancient History
    • European History
    • US History
    • World History
    • other →

    Top subcategories

    • Croatian
    • Czech
    • Finnish
    • Greek
    • Hindi
    • Japanese
    • Korean
    • Persian
    • Swedish
    • Turkish
    • other →
 
Profile Documents Logout
Upload
Short Circuit Current Calculations
Short Circuit Current Calculations

... “minimum” bolted three-phase short circuit condition. There are several variables in a distribution system that affect calculated bolted 3-phase short-circuit currents. It is important to select the variable values applicable for the specific application analysis. In the Point-to-Point method presen ...
Small scale wind energy harvesting with maximum
Small scale wind energy harvesting with maximum

Collins KWM-380 owner`s manual 2nd edition 1 January 1981
Collins KWM-380 owner`s manual 2nd edition 1 January 1981

503-229
503-229

... loads. To improve the performance, a 30th order lowpass FIR filter is introduced after the measures to attenuate the high frequency components, making the voltage error to contain only lower frequencies. In order to avoid additional phase shift in the closed-loop, this filter is noncausal with zero- ...
M A N U A L  Digital Battery - Drive
M A N U A L Digital Battery - Drive

Guide to the electrical parameter classifications of IEC 60950 and
Guide to the electrical parameter classifications of IEC 60950 and

... Energy Source, ES, and Power Source, PS. There are three classes of each, for energy they are ES1, ES2 and ES3 and for power PS1, PS2 and PS3. The energy sources are not directly classified in J but are classified for a range of parameters. Annex W (informative) does supply a comparison of IEC 60950 ...
MAX16903 Evaluation Kit Evaluates: General Description Features
MAX16903 Evaluation Kit Evaluates: General Description Features

... on +5V output and should be approximately 10I. If using a resistor load, make sure it can handle 5W. 3) Turn on the power supply and electronic load. DMM2 gives the load current while DMM1 gives the output voltage. 4) Increase the load to 1A and observe the output. ...
Comparative Analysis of 150W RF VDMOS Transistors
Comparative Analysis of 150W RF VDMOS Transistors

Aalborg Universitet
Aalborg Universitet

... and it is a condition of accessing publications that users recognise and abide by the legal requirements associated with these rights. ? Users may download and print one copy of any publication from the public portal for the purpose of private study or research. ? You may not further distribute the ...
Diode Failure Scenarios Modes of Failure
Diode Failure Scenarios Modes of Failure

... brushless generator rotating rectifier assemblies.) Cause: Over voltage or current. Usually due to out of phase paralleling, a lightning strike or other abnormal transient. This mode of diode failure may also occur if a voltage is imposed upon the terminals of a brushless generator while it is at re ...
IOSR Journal of Electrical and Electronics Engineering (IOSR-JEEE) e-ISSN: 2278-1676,p-ISSN: 2320-3331,
IOSR Journal of Electrical and Electronics Engineering (IOSR-JEEE) e-ISSN: 2278-1676,p-ISSN: 2320-3331,

... Interleaved buck converter (IBC) has received a lot of attention in applications where non-isolation, step-down conversion ratio, and high output current with low ripple are required, due to its simple structure and low control complexity. However, in the conventional IBC, all semiconductor devices ...
Constructional Project
Constructional Project

FSL306LR Green Mode Fairchild Buck Switch  FSL306LR — Green Mode Fair
FSL306LR Green Mode Fairchild Buck Switch FSL306LR — Green Mode Fair

... 4. Protection Circuits The protective functions include Overload Protection (OLP), Over-Voltage Protection (OVP), Under-Voltage Lockout (UVLO), Feedback Open Loop Protection (FB_OLP), Abnormal Over-Current Protection (AOCP), and Thermal Shutdown (TSD). All of the protections operate in Auto-Restart ...
Eco-mode: Benefits and Risks of Energy-saving Modes
Eco-mode: Benefits and Risks of Energy-saving Modes

... Eco-mode: Benefits and Risks of Energy-saving Modes of UPS Operation In online mode, the UPS continuously regenerates the output voltage. In eco-mode the load is normally powered by the bypass path, allowing raw mains power to supply the load, and the UPS inverter is engaged only when the utility m ...
3-V to 17-V 1-A Step-Down Converter with DCS
3-V to 17-V 1-A Step-Down Converter with DCS

... The device is packaged in an 8-pin WSON package ...
AN10909 Low V transistors in medium power load switch applications
AN10909 Low V transistors in medium power load switch applications

... representations or warranties, expressed or implied, as to the accuracy or completeness of such information and shall have no liability for the consequences of use of such information. NXP Semiconductors takes no responsibility for the content in this document if provided by an information source ou ...
WT500 Power Analyzer
WT500 Power Analyzer

... The WT500 Power Analyzer features a color TFT and compact body that enables single-phase and three-phase power measurement, achieving ±0.1% basic accuracy, maximum input of 1000 Vrms, 40 Arms and a measurement bandwidth of 100 kHz. ...
IOSR Journal of Electrical and Electronics Engineering (IOSR-JEEE) e-ISSN: 2278-1676,p-ISSN: 2320-3331,
IOSR Journal of Electrical and Electronics Engineering (IOSR-JEEE) e-ISSN: 2278-1676,p-ISSN: 2320-3331,

... ABC and NFC based unified power flow conditioner for compensating power quality problem Neural Network (PNN), fuzzy k-nearest neighbor classifier (FkNN). They have proved that their proposed method was reliable and produces consistently better results. Yuksel Oguz et al. [27] have presented a desig ...
TSS521 Meter-Bus Transceiver
TSS521 Meter-Bus Transceiver

... Figure 4. Single Mode Bus Load At a bus fault the shut down time of VDD (toff) in which data storage can be performed depends on the system current IVDD and the value of capacitor CSTC. See Figure 5, which shows a correlation between the shutdown of the bus voltage VBUS and VDD_off and toff for dime ...
PPT Presentation (Vincent).
PPT Presentation (Vincent).

Power Factor in Electrical Energy Management
Power Factor in Electrical Energy Management

... From the above list, we can see that a low power factor can be a result of the design of the equipment, as in the case of welders, or it can be result from the operating conditions under which the equipment is used, as in lightly loaded induction motors which are probably the worst offenders. Equipm ...
Aalborg Universitet
Aalborg Universitet

... If you believe that this document breaches copyright please contact us at [email protected] providing details, and we will remove access to the work immediately and investigate your claim. ...
RapidLED Coralife BioCube 29 Retrofit
RapidLED Coralife BioCube 29 Retrofit

... hard glue or epoxy and drill them back out so the screw will grip again, or find some other solution. Over tightening may also snap the screw bosses from the hood, in which case, you will have to attempt repair with super glue. For this retrofit, it is easiest to line up one of the rearmost screws a ...
3. Corrosive atmosphere features
3. Corrosive atmosphere features

... To make it easier to upgrade the facility, the distribution busbar will be installed in an IP2x or IPxxb compartment and allow functional units with an output of up to 630 A to be added without interrupting the power supply on these busbars by connecting them with plugs instead of screws. The distri ...
STEVAL-IPM15B motor control power board based on the SLLIMM
STEVAL-IPM15B motor control power board based on the SLLIMM

... The main characteristics of this evaluation board are small size, minimal BOM and high efficiency. It consists of an interface circuit (BUS and VCC connectors), bootstrap capacitors, snubber capacitor, hardware short-circuit protection, fault event and temperature monitoring. In order to increase th ...
< 1 ... 357 358 359 360 361 362 363 364 365 ... 1128 >

Power engineering



Power engineering, also called power systems engineering, is a subfield of energy engineering that deals with the generation, transmission, distribution and utilization of electric power and the electrical devices connected to such systems including generators, motors and transformers. Although much of the field is concerned with the problems of three-phase AC power – the standard for large-scale power transmission and distribution across the modern world – a significant fraction of the field is concerned with the conversion between AC and DC power and the development of specialized power systems such as those used in aircraft or for electric railway networks. It was a subfield of electrical engineering before the emergence of energy engineering.Electricity became a subject of scientific interest in the late 17th century with the work of William Gilbert. Over the next two centuries a number of important discoveries were made including the incandescent light bulb and the voltaic pile. Probably the greatest discovery with respect to power engineering came from Michael Faraday who in 1831 discovered that a change in magnetic flux induces an electromotive force in a loop of wire—a principle known as electromagnetic induction that helps explain how generators and transformers work.In 1881 two electricians built the world's first power station at Godalming in England. The station employed two waterwheels to produce an alternating current that was used to supply seven Siemens arc lamps at 250 volts and thirty-four incandescent lamps at 40 volts. However supply was intermittent and in 1882 Thomas Edison and his company, The Edison Electric Light Company, developed the first steam-powered electric power station on Pearl Street in New York City. The Pearl Street Station consisted of several generators and initially powered around 3,000 lamps for 59 customers. The power station used direct current and operated at a single voltage. Since the direct current power could not be easily transformed to the higher voltages necessary to minimise power loss during transmission, the possible distance between the generators and load was limited to around half-a-mile (800 m).That same year in London Lucien Gaulard and John Dixon Gibbs demonstrated the first transformer suitable for use in a real power system. The practical value of Gaulard and Gibbs' transformer was demonstrated in 1884 at Turin where the transformer was used to light up forty kilometres (25 miles) of railway from a single alternating current generator. Despite the success of the system, the pair made some fundamental mistakes. Perhaps the most serious was connecting the primaries of the transformers in series so that switching one lamp on or off would affect other lamps further down the line. Following the demonstration George Westinghouse, an American entrepreneur, imported a number of the transformers along with a Siemens generator and set his engineers to experimenting with them in the hopes of improving them for use in a commercial power system.One of Westinghouse's engineers, William Stanley, recognised the problem with connecting transformers in series as opposed to parallel and also realised that making the iron core of a transformer a fully enclosed loop would improve the voltage regulation of the secondary winding. Using this knowledge he built a much improved alternating current power system at Great Barrington, Massachusetts in 1886. In 1885 the Italian physicist and electrical engineer Galileo Ferraris demonstrated an induction motor and in 1887 and 1888 the Serbian-American engineer Nikola Tesla filed a range of patents related to power systems including one for a practical two-phase induction motor which Westinghouse licensed for his AC system.By 1890 the power industry had flourished and power companies had built thousands of power systems (both direct and alternating current) in the United States and Europe – these networks were effectively dedicated to providing electric lighting. During this time a fierce rivalry in the US known as the ""War of Currents"" emerged between Edison and Westinghouse over which form of transmission (direct or alternating current) was superior. In 1891, Westinghouse installed the first major power system that was designed to drive an electric motor and not just provide electric lighting. The installation powered a 100 horsepower (75 kW) synchronous motor at Telluride, Colorado with the motor being started by a Tesla induction motor. On the other side of the Atlantic, Oskar von Miller built a 20 kV 176 km three-phase transmission line from Lauffen am Neckar to Frankfurt am Main for the Electrical Engineering Exhibition in Frankfurt. In 1895, after a protracted decision-making process, the Adams No. 1 generating station at Niagara Falls began transmitting three-phase alternating current power to Buffalo at 11 kV. Following completion of the Niagara Falls project, new power systems increasingly chose alternating current as opposed to direct current for electrical transmission.Although the 1880s and 1890s were seminal decades in the field, developments in power engineering continued throughout the 20th and 21st century. In 1936 the first commercial high-voltage direct current (HVDC) line using mercury-arc valves was built between Schenectady and Mechanicville, New York. HVDC had previously been achieved by installing direct current generators in series (a system known as the Thury system) although this suffered from serious reliability issues. In 1957 Siemens demonstrated the first solid-state rectifier (solid-state rectifiers are now the standard for HVDC systems) however it was not until the early 1970s that this technology was used in commercial power systems. In 1959 Westinghouse demonstrated the first circuit breaker that used SF6 as the interrupting medium. SF6 is a far superior dielectric to air and, in recent times, its use has been extended to produce far more compact switching equipment (known as switchgear) and transformers. Many important developments also came from extending innovations in the ICT field to the power engineering field. For example, the development of computers meant load flow studies could be run more efficiently allowing for much better planning of power systems. Advances in information technology and telecommunication also allowed for much better remote control of the power system's switchgear and generators.
  • studyres.com © 2026
  • DMCA
  • Privacy
  • Terms
  • Report