• Study Resource
  • Explore Categories
    • Arts & Humanities
    • Business
    • Engineering & Technology
    • Foreign Language
    • History
    • Math
    • Science
    • Social Science

    Top subcategories

    • Advanced Math
    • Algebra
    • Basic Math
    • Calculus
    • Geometry
    • Linear Algebra
    • Pre-Algebra
    • Pre-Calculus
    • Statistics And Probability
    • Trigonometry
    • other →

    Top subcategories

    • Astronomy
    • Astrophysics
    • Biology
    • Chemistry
    • Earth Science
    • Environmental Science
    • Health Science
    • Physics
    • other →

    Top subcategories

    • Anthropology
    • Law
    • Political Science
    • Psychology
    • Sociology
    • other →

    Top subcategories

    • Accounting
    • Economics
    • Finance
    • Management
    • other →

    Top subcategories

    • Aerospace Engineering
    • Bioengineering
    • Chemical Engineering
    • Civil Engineering
    • Computer Science
    • Electrical Engineering
    • Industrial Engineering
    • Mechanical Engineering
    • Web Design
    • other →

    Top subcategories

    • Architecture
    • Communications
    • English
    • Gender Studies
    • Music
    • Performing Arts
    • Philosophy
    • Religious Studies
    • Writing
    • other →

    Top subcategories

    • Ancient History
    • European History
    • US History
    • World History
    • other →

    Top subcategories

    • Croatian
    • Czech
    • Finnish
    • Greek
    • Hindi
    • Japanese
    • Korean
    • Persian
    • Swedish
    • Turkish
    • other →
 
Profile Documents Logout
Upload
ADVANCES IN INTERPRETING PARTIAL DISCHARGE TEST RESULTS FROM
ADVANCES IN INTERPRETING PARTIAL DISCHARGE TEST RESULTS FROM

... On-line partial discharge (PD) testing has been used for decades to help maintenance personnel detect stator winding insulation problems in motors and generators. Specifically, the test can often find loose, delaminated, overheated, and contaminated windings, well before these problems lead to failu ...
EHV AC Substations : Layout, Equipment, Bus arrangements
EHV AC Substations : Layout, Equipment, Bus arrangements

投影片 1
投影片 1

... With a nonlinear load, you cannot easily predict the relationship between voltage and current — unless you have an exact curve for each device. With equipment containing many solid-state devices, such an approach is impossible. Nonlinear loads are switched on for only part of the cycle, as in a thyr ...
Performance of dissipative dielectric elastomer generators
Performance of dissipative dielectric elastomer generators

... Dielectric elastomer generators are high-energy-density electromechanical transducers. Their performance is affected by dissipative losses. This paper presents a theoretical analysis of a dielectric elastomer generator with two dissipative processes: viscoelasticity and current leakage. Conversion c ...
Isolation Fault Troubleshooting
Isolation Fault Troubleshooting

SAFE EXPERIMENTING IN CLASS MODERN MEASURING
SAFE EXPERIMENTING IN CLASS MODERN MEASURING

Power Electronics Testing
Power Electronics Testing

High Voltage Nanosecond Pulse Measurement Techniques
High Voltage Nanosecond Pulse Measurement Techniques

... EHT nanosecond pulser has a floating output stage, such that both outputs (positive and negative) are galvanically isolated from ground. Typically, the load is also kept floating. In this standard case, grounds come into the system at two locations: the AC cord providing power to the EHT pulser, and ...
3-phase motor control demonstration board featuring IGBT
3-phase motor control demonstration board featuring IGBT

... from the mains before powering the board. When using an oscilloscope with the demonstration board, it must be isolated from the AC line. This prevents shock from occurring as a result of touching any SINGLE point in the circuit, but does NOT prevent shock when touching two or more points in the circ ...
Read the full Audio Express Review on the SM70
Read the full Audio Express Review on the SM70

... satellites. The SM-70 amps were configured as bridged monoblocks. Since these amplifiers are rather different designs, it’s not surprising that they don’t sound identical. Nonetheless, they do have much in common, so I’ll describe them together, noting differences where they exist. The new Monarchy ...
Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application
Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application

... at the transmission grid and ending at the line-side terminals of the main power supply circuit breakers feeding the 13.8 kV and 6.9 kV buses, and at the terminals on the main transformer (MT) side of the generator load break switch (GLBS). The plant switching station is connected to the transmissio ...
A Four-Level pi-Type Converter for Low
A Four-Level pi-Type Converter for Low

DC MOTOR CONTROLLER USING LINEAR QUADRATIC
DC MOTOR CONTROLLER USING LINEAR QUADRATIC

... Linear Quadratic Regulator (LQR) algorithm is one of the controller methods to control a system. In this project, the LQR was implemented on the PIC microcontroller to control the dc motor. The main objective of this controller is to minimize the deviation of the speed of dc motor. Dc motor speed is ...
Electrical test equipment for use by electricians GS38
Electrical test equipment for use by electricians GS38

... Introduction 1 This guidance is aimed at people who use electrical test equipment on low voltage electrical systems and equipment. These may include electricians, electrical contractors, test supervisors, technicians, managers or appliance repairers (including trades where electrical testing is not ...
ELI-S-250 Spec Sheet
ELI-S-250 Spec Sheet

... Inverter works in conjunction with fluorescent, LED, or incandescent fixtures to create an emergency lighting system. The ELI-S-250 operates a maximum load of 250 Watts at unity power factor. It allows the connected fixture(s) to be on, off, switched or dimmed without affecting emergency operation. ...
DEM 130 Electrical and Electronic Fundamentals Revised
DEM 130 Electrical and Electronic Fundamentals Revised

voltage regulator
voltage regulator

... to another voltage level without affecting the actual power supplied. • The transformer can be used in distribution system for efficiency issues. • The step-up transformer decreases the line current and decreases the power loss on power line. • The transmission/distribution system with transformer c ...
Aalborg Universitet Control and Protection Cooperation Strategy for Voltage Instability
Aalborg Universitet Control and Protection Cooperation Strategy for Voltage Instability

... values than the steady state ones αs , βs [1]. The typical scenario for long term voltage instability due to the load restoration dynamics can be interpreted using P-V characteristic curves as shown in Fig. 1 [2]. Three of the curves which are labeled by “Normal”, “N-1” and “N-2” represent P-V curve ...
Please put your answer in your booklet. No need to write the
Please put your answer in your booklet. No need to write the

... Suppose that two identical resistors are placed in parallel with a 12-Volt battery. The overall current in the circuit is 6 amps. The resistance of each resistor is 4 ohms. 8. If an electric circuit was analogous to a water park, then the battery would be analogous to the ____. a. pipes which carry ...
CBSE 2008 Physics Solved Paper All India XII
CBSE 2008 Physics Solved Paper All India XII

... As size of antenna required is comparable to wavelength of waves, high frequency waves will require smaller antenna. High frequencies are transmitted better as power radiated increases with increasing frequency. Modulation index= ...
Tuning the P700VC in Sens Vector and FVC
Tuning the P700VC in Sens Vector and FVC

... Tuning the drive to the motor is extremely important. The purpose of Autotune is to identify the correct motor flux and stator resistance. This will ensure higher starting torque and better performance at low speed operation. An improperly tuned drive can cause the motor to exhibit instability at lo ...
Delphi DNT04, Non-Isolated Point of Load
Delphi DNT04, Non-Isolated Point of Load

... the pin floating or tie to Vin (module will be On). For negative logic module, the On/Off pin is pulled high with an external pull-up resistor (see figure 27). Negative logic On/Off signal turns the module OFF during logic high and turns the module ON during logic low. If the negative On/Off functio ...
SECTION 264313 SURGE PROTECTIVE DEVICES 03/03/14
SECTION 264313 SURGE PROTECTIVE DEVICES 03/03/14

... 2.2 SURGE PROTECTIVE DEVICE ................................................................................................... 4 ...
Power MOSFET, 24 A, 60 V, Logic Level, N-Channel DPAK
Power MOSFET, 24 A, 60 V, Logic Level, N-Channel DPAK

... are registered trademarks of Semiconductor Components Industries, LLC (SCILLC) or its subsidiaries in the United States and/or other countries. SCILLC owns the rights to a number of patents, trademarks, copyrights, trade secrets, and other intellectual property. A listing of SCILLC’s product/patent ...
Parameters related to voltage issues - entso-e
Parameters related to voltage issues - entso-e

... made for other voltage related non-exhaustive requirements. The level of fault current injection from PPMs and/or HVDC systems will influence the length and depth of a voltage depression during a fault and consequently the recovery period thereafter. Another contributing factor to the length of a vo ...
< 1 ... 355 356 357 358 359 360 361 362 363 ... 1128 >

Power engineering



Power engineering, also called power systems engineering, is a subfield of energy engineering that deals with the generation, transmission, distribution and utilization of electric power and the electrical devices connected to such systems including generators, motors and transformers. Although much of the field is concerned with the problems of three-phase AC power – the standard for large-scale power transmission and distribution across the modern world – a significant fraction of the field is concerned with the conversion between AC and DC power and the development of specialized power systems such as those used in aircraft or for electric railway networks. It was a subfield of electrical engineering before the emergence of energy engineering.Electricity became a subject of scientific interest in the late 17th century with the work of William Gilbert. Over the next two centuries a number of important discoveries were made including the incandescent light bulb and the voltaic pile. Probably the greatest discovery with respect to power engineering came from Michael Faraday who in 1831 discovered that a change in magnetic flux induces an electromotive force in a loop of wire—a principle known as electromagnetic induction that helps explain how generators and transformers work.In 1881 two electricians built the world's first power station at Godalming in England. The station employed two waterwheels to produce an alternating current that was used to supply seven Siemens arc lamps at 250 volts and thirty-four incandescent lamps at 40 volts. However supply was intermittent and in 1882 Thomas Edison and his company, The Edison Electric Light Company, developed the first steam-powered electric power station on Pearl Street in New York City. The Pearl Street Station consisted of several generators and initially powered around 3,000 lamps for 59 customers. The power station used direct current and operated at a single voltage. Since the direct current power could not be easily transformed to the higher voltages necessary to minimise power loss during transmission, the possible distance between the generators and load was limited to around half-a-mile (800 m).That same year in London Lucien Gaulard and John Dixon Gibbs demonstrated the first transformer suitable for use in a real power system. The practical value of Gaulard and Gibbs' transformer was demonstrated in 1884 at Turin where the transformer was used to light up forty kilometres (25 miles) of railway from a single alternating current generator. Despite the success of the system, the pair made some fundamental mistakes. Perhaps the most serious was connecting the primaries of the transformers in series so that switching one lamp on or off would affect other lamps further down the line. Following the demonstration George Westinghouse, an American entrepreneur, imported a number of the transformers along with a Siemens generator and set his engineers to experimenting with them in the hopes of improving them for use in a commercial power system.One of Westinghouse's engineers, William Stanley, recognised the problem with connecting transformers in series as opposed to parallel and also realised that making the iron core of a transformer a fully enclosed loop would improve the voltage regulation of the secondary winding. Using this knowledge he built a much improved alternating current power system at Great Barrington, Massachusetts in 1886. In 1885 the Italian physicist and electrical engineer Galileo Ferraris demonstrated an induction motor and in 1887 and 1888 the Serbian-American engineer Nikola Tesla filed a range of patents related to power systems including one for a practical two-phase induction motor which Westinghouse licensed for his AC system.By 1890 the power industry had flourished and power companies had built thousands of power systems (both direct and alternating current) in the United States and Europe – these networks were effectively dedicated to providing electric lighting. During this time a fierce rivalry in the US known as the ""War of Currents"" emerged between Edison and Westinghouse over which form of transmission (direct or alternating current) was superior. In 1891, Westinghouse installed the first major power system that was designed to drive an electric motor and not just provide electric lighting. The installation powered a 100 horsepower (75 kW) synchronous motor at Telluride, Colorado with the motor being started by a Tesla induction motor. On the other side of the Atlantic, Oskar von Miller built a 20 kV 176 km three-phase transmission line from Lauffen am Neckar to Frankfurt am Main for the Electrical Engineering Exhibition in Frankfurt. In 1895, after a protracted decision-making process, the Adams No. 1 generating station at Niagara Falls began transmitting three-phase alternating current power to Buffalo at 11 kV. Following completion of the Niagara Falls project, new power systems increasingly chose alternating current as opposed to direct current for electrical transmission.Although the 1880s and 1890s were seminal decades in the field, developments in power engineering continued throughout the 20th and 21st century. In 1936 the first commercial high-voltage direct current (HVDC) line using mercury-arc valves was built between Schenectady and Mechanicville, New York. HVDC had previously been achieved by installing direct current generators in series (a system known as the Thury system) although this suffered from serious reliability issues. In 1957 Siemens demonstrated the first solid-state rectifier (solid-state rectifiers are now the standard for HVDC systems) however it was not until the early 1970s that this technology was used in commercial power systems. In 1959 Westinghouse demonstrated the first circuit breaker that used SF6 as the interrupting medium. SF6 is a far superior dielectric to air and, in recent times, its use has been extended to produce far more compact switching equipment (known as switchgear) and transformers. Many important developments also came from extending innovations in the ICT field to the power engineering field. For example, the development of computers meant load flow studies could be run more efficiently allowing for much better planning of power systems. Advances in information technology and telecommunication also allowed for much better remote control of the power system's switchgear and generators.
  • studyres.com © 2026
  • DMCA
  • Privacy
  • Terms
  • Report