• Study Resource
  • Explore Categories
    • Arts & Humanities
    • Business
    • Engineering & Technology
    • Foreign Language
    • History
    • Math
    • Science
    • Social Science

    Top subcategories

    • Advanced Math
    • Algebra
    • Basic Math
    • Calculus
    • Geometry
    • Linear Algebra
    • Pre-Algebra
    • Pre-Calculus
    • Statistics And Probability
    • Trigonometry
    • other →

    Top subcategories

    • Astronomy
    • Astrophysics
    • Biology
    • Chemistry
    • Earth Science
    • Environmental Science
    • Health Science
    • Physics
    • other →

    Top subcategories

    • Anthropology
    • Law
    • Political Science
    • Psychology
    • Sociology
    • other →

    Top subcategories

    • Accounting
    • Economics
    • Finance
    • Management
    • other →

    Top subcategories

    • Aerospace Engineering
    • Bioengineering
    • Chemical Engineering
    • Civil Engineering
    • Computer Science
    • Electrical Engineering
    • Industrial Engineering
    • Mechanical Engineering
    • Web Design
    • other →

    Top subcategories

    • Architecture
    • Communications
    • English
    • Gender Studies
    • Music
    • Performing Arts
    • Philosophy
    • Religious Studies
    • Writing
    • other →

    Top subcategories

    • Ancient History
    • European History
    • US History
    • World History
    • other →

    Top subcategories

    • Croatian
    • Czech
    • Finnish
    • Greek
    • Hindi
    • Japanese
    • Korean
    • Persian
    • Swedish
    • Turkish
    • other →
 
Profile Documents Logout
Upload
ADP3623 数据手册DataSheet 下载
ADP3623 数据手册DataSheet 下载

... to supply some of the peak currents that are drawn. An improper decoupling can dramatically increase the rise times, cause excessive resonance on the OUTA and OUTB pins, and, in some extreme cases, even damage the device, due to inductive overvoltage on the VDD or OUTA/OUTB pins. The minimum capacit ...
Lessons Learned From Generator Event Reports
Lessons Learned From Generator Event Reports

AN4028
AN4028

... The main feature of this converter is that the input current is almost in phase with the mains voltage; therefore the power factor is close to unity. This is achieved by the controller, the L6564, shaping the input current as a sinewave in phase with the mains voltage. The topology of this power sup ...
Volume 45, Number 1, 2011
Volume 45, Number 1, 2011

... superb audio while complementing the HDTV video performance. The ability to extract and process high-fidelity audio signals is a key differentiator among the hardware choices on the market today. Home theater systems can now offer all the latest features of the High-Definition Multimedia Interface ( ...
SAMPLE OF THE STUDY
SAMPLE OF THE STUDY

Class 4, Wide Input Range, 15-W Power over Ethernet (PoE
Class 4, Wide Input Range, 15-W Power over Ethernet (PoE

... The TPS23756 device has a combined power-over-ethernet (PoE) powered-device (PD) interface and current-mode DC-DC controller optimized specifically for isolated converters. The PoE interface supports the IEEE 802.3at standard. The TPS23756 device supports a number of input voltage ORing options incl ...
International Electrical Engineering Journal (IEEJ) Vol. 7 (2016) No.3, pp. 2196-2203
International Electrical Engineering Journal (IEEJ) Vol. 7 (2016) No.3, pp. 2196-2203

... and coupled energized circuits. ...
A.S. Jurkov, L. Roslaniec, and D.J. Perreault, “Lossless Multi-Way Power Combining and Outphasing for High-Frequency Resonant Inverters,” IEEE Transactions on Power Electronics , Vol. 29, No. 4, pp. 1894-1908, Apr. 2014.
A.S. Jurkov, L. Roslaniec, and D.J. Perreault, “Lossless Multi-Way Power Combining and Outphasing for High-Frequency Resonant Inverters,” IEEE Transactions on Power Electronics , Vol. 29, No. 4, pp. 1894-1908, Apr. 2014.

... expresses the exact relationship between the output power delivered to the load RL and any pair of outphasing control angles [; ]. This equation holds on the assumption that the combiner inputs are each driven with the specified voltage. As can be seen from (8), output power may be controlled eith ...
v Brochure Company Presentation ()
v Brochure Company Presentation ()

CYB_PDS_Guideform Spec
CYB_PDS_Guideform Spec

TSUS6402 Datasheet
TSUS6402 Datasheet

... liability arising out of the application or use of any product, (ii) any and all liability, including without limitation special, consequential or incidental damages, and (iii) any and all implied warranties, including warranties of fitness for particular purpose, non-infringement and merchantabilit ...
Short-Circuit/Coordination Study and Arc Flash Hazard Study
Short-Circuit/Coordination Study and Arc Flash Hazard Study

... proposed distribution equipment supplied under this Contact, as well as all directly affected existing distribution equipment at the District's facility. The study shall include all portions of the existing and proposed electrical distribution system from the electric utility power source(s) and eme ...
A Guide To Describe The Occurrence and Mitigation Of Switching
A Guide To Describe The Occurrence and Mitigation Of Switching

SKY77161 数据资料DataSheet下载
SKY77161 数据资料DataSheet下载

... This small and efficient module packs full 2010-2025 MHz bandwidth coverage into a single compact package. The PAM meets the stringent spectral linearity requirements of TDSCDMA transmission, with high power added efficiency for power output of up to 28 dBm. A low current pin (VCONT) is provided to ...
Introduction - College of William and Mary
Introduction - College of William and Mary

Service manual (VGD 700-3K)
Service manual (VGD 700-3K)

1100B Technical Specifications - Mitsubishi Electric Power Products
1100B Technical Specifications - Mitsubishi Electric Power Products

... In no event shall MEPPI be liable for the accuracy, completeness or usefulness of the following specifications or for any modification(s) to the following specifications for which MEPPI has not approved or authorized such modifications. Further, MEPPI shall not be liable for any special, incidental, ...
Transmission to Distribution/ End-User Interconnection Guidelines
Transmission to Distribution/ End-User Interconnection Guidelines

... rate regulation. However, under the Energy Policy Act of 2005, DPC is subject to the mandatory reliability and compliance standards that are administered by the FERC. iii) North American Electric Reliability Corporation Reliability Standards In June of 2007, FERC granted The North American Reliabili ...
Switching Control Technique of Phase-Shift- Controlled Full
Switching Control Technique of Phase-Shift- Controlled Full

... 3) A small inductor and large capacitor are added to generate a constant voltage source on secondary side, as proposed in [10]. Although the circulating current is reduced and the zero-current switching (ZCS) is achieved by leading leg of full-bridge converter, this will prevent the leading leg from ...
GE 0106 Basic Engineering II
GE 0106 Basic Engineering II

... concept of phasor representation. RLC serious circuits and series resonance. RLC parallel circuits (includes simple problems in DC & AC circuits). Introduction to three phase system – types of connection, relationship between line and phase values. (qualitative treatment only). ...
Word
Word

BD33C0AWFP
BD33C0AWFP

... noise, input voltage fluctuations, load fluctuations, etc.), please take enough measures to avoid some influence (e.g. insert the filter, etc.). ...
- White Rose Research Online
- White Rose Research Online

... Grid synchronisation is one of the key issues for distributed power generation systems connected to the utility network through power electronic converters. It is also important for devices such as flexible AC transmission systems (FACTs), active power filters, and HVDC converters [1,2]. Among vario ...
Short-Circuit Generator Set for AICHI ELECTRIC CO., LTD.
Short-Circuit Generator Set for AICHI ELECTRIC CO., LTD.

Generic Service Preso
Generic Service Preso

... The dip switches on the interface card select airflow to match the size of the system installed. If they are not verified to be in the position matching the size of the condensing or heat pump unit, the indoor airflow will be grossly over-blown or under-blown. Also, the DELAY and TRIM functions will ...
< 1 ... 145 146 147 148 149 150 151 152 153 ... 1128 >

Power engineering



Power engineering, also called power systems engineering, is a subfield of energy engineering that deals with the generation, transmission, distribution and utilization of electric power and the electrical devices connected to such systems including generators, motors and transformers. Although much of the field is concerned with the problems of three-phase AC power – the standard for large-scale power transmission and distribution across the modern world – a significant fraction of the field is concerned with the conversion between AC and DC power and the development of specialized power systems such as those used in aircraft or for electric railway networks. It was a subfield of electrical engineering before the emergence of energy engineering.Electricity became a subject of scientific interest in the late 17th century with the work of William Gilbert. Over the next two centuries a number of important discoveries were made including the incandescent light bulb and the voltaic pile. Probably the greatest discovery with respect to power engineering came from Michael Faraday who in 1831 discovered that a change in magnetic flux induces an electromotive force in a loop of wire—a principle known as electromagnetic induction that helps explain how generators and transformers work.In 1881 two electricians built the world's first power station at Godalming in England. The station employed two waterwheels to produce an alternating current that was used to supply seven Siemens arc lamps at 250 volts and thirty-four incandescent lamps at 40 volts. However supply was intermittent and in 1882 Thomas Edison and his company, The Edison Electric Light Company, developed the first steam-powered electric power station on Pearl Street in New York City. The Pearl Street Station consisted of several generators and initially powered around 3,000 lamps for 59 customers. The power station used direct current and operated at a single voltage. Since the direct current power could not be easily transformed to the higher voltages necessary to minimise power loss during transmission, the possible distance between the generators and load was limited to around half-a-mile (800 m).That same year in London Lucien Gaulard and John Dixon Gibbs demonstrated the first transformer suitable for use in a real power system. The practical value of Gaulard and Gibbs' transformer was demonstrated in 1884 at Turin where the transformer was used to light up forty kilometres (25 miles) of railway from a single alternating current generator. Despite the success of the system, the pair made some fundamental mistakes. Perhaps the most serious was connecting the primaries of the transformers in series so that switching one lamp on or off would affect other lamps further down the line. Following the demonstration George Westinghouse, an American entrepreneur, imported a number of the transformers along with a Siemens generator and set his engineers to experimenting with them in the hopes of improving them for use in a commercial power system.One of Westinghouse's engineers, William Stanley, recognised the problem with connecting transformers in series as opposed to parallel and also realised that making the iron core of a transformer a fully enclosed loop would improve the voltage regulation of the secondary winding. Using this knowledge he built a much improved alternating current power system at Great Barrington, Massachusetts in 1886. In 1885 the Italian physicist and electrical engineer Galileo Ferraris demonstrated an induction motor and in 1887 and 1888 the Serbian-American engineer Nikola Tesla filed a range of patents related to power systems including one for a practical two-phase induction motor which Westinghouse licensed for his AC system.By 1890 the power industry had flourished and power companies had built thousands of power systems (both direct and alternating current) in the United States and Europe – these networks were effectively dedicated to providing electric lighting. During this time a fierce rivalry in the US known as the ""War of Currents"" emerged between Edison and Westinghouse over which form of transmission (direct or alternating current) was superior. In 1891, Westinghouse installed the first major power system that was designed to drive an electric motor and not just provide electric lighting. The installation powered a 100 horsepower (75 kW) synchronous motor at Telluride, Colorado with the motor being started by a Tesla induction motor. On the other side of the Atlantic, Oskar von Miller built a 20 kV 176 km three-phase transmission line from Lauffen am Neckar to Frankfurt am Main for the Electrical Engineering Exhibition in Frankfurt. In 1895, after a protracted decision-making process, the Adams No. 1 generating station at Niagara Falls began transmitting three-phase alternating current power to Buffalo at 11 kV. Following completion of the Niagara Falls project, new power systems increasingly chose alternating current as opposed to direct current for electrical transmission.Although the 1880s and 1890s were seminal decades in the field, developments in power engineering continued throughout the 20th and 21st century. In 1936 the first commercial high-voltage direct current (HVDC) line using mercury-arc valves was built between Schenectady and Mechanicville, New York. HVDC had previously been achieved by installing direct current generators in series (a system known as the Thury system) although this suffered from serious reliability issues. In 1957 Siemens demonstrated the first solid-state rectifier (solid-state rectifiers are now the standard for HVDC systems) however it was not until the early 1970s that this technology was used in commercial power systems. In 1959 Westinghouse demonstrated the first circuit breaker that used SF6 as the interrupting medium. SF6 is a far superior dielectric to air and, in recent times, its use has been extended to produce far more compact switching equipment (known as switchgear) and transformers. Many important developments also came from extending innovations in the ICT field to the power engineering field. For example, the development of computers meant load flow studies could be run more efficiently allowing for much better planning of power systems. Advances in information technology and telecommunication also allowed for much better remote control of the power system's switchgear and generators.
  • studyres.com © 2026
  • DMCA
  • Privacy
  • Terms
  • Report