Download Proposed Part 73 Fuel Cycle Facility Security Rulemaking

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Post-quantum cryptography wikipedia , lookup

Mobile security wikipedia , lookup

Information security wikipedia , lookup

Cyberwarfare wikipedia , lookup

Airport security wikipedia , lookup

Security printing wikipedia , lookup

Cyber-security regulation wikipedia , lookup

Computer security wikipedia , lookup

Security-focused operating system wikipedia , lookup

Transcript
Proposed Part 73 Fuel Cycle
Facility Security Rulemaking
Marshall Kohen
NRC Office of Nuclear Security and Incident Response
Fuel Cycle Information Exchange Conference
June 8, 2011
Overview
• Background
• Technical / Regulatory Basis
• Broad Impact of Material Categorization
• Tentative Milestones
Background
• 10 CFR Part 73, Physical Protection of Plants and
Materials, has been revised subpart-by-subpart
over the last 25 years
• Lessons learned ((e.g.,
g threat and implementation))
• Commission directed engagement of a “broad”
range of stakeholders
•
•
Domestic / International
Discussions with licensees, this meeting, Reprocessing
Public Meetings
Technical / Regulatory
Basis
•
•
•
Revise special nuclear material categorization scheme to address
material attractiveness
Make generally applicable Orders accumulated since 9/11/01
Incorporate, as appropriate:
•
•
•
•
Applicable changes from reactors (cyber, safety/security, access
authorization)
Chemical security
Fitness-for-duty (e.g., security work-hour controls)
Energy Policy Act of 2005 (criminal trespass, access authorizations,
enhanced weapons and notification of suspicious activity)
• Effect conforming changes to Part 40
• Continued alignment with INFCIRC/225/Rev. 5
Broad Impact of Material
Categorization
73.25/67
SNM
Transport
Security
73.60
Nonpower
reactors
7x
Reprocessing
Rulemaking
73.45/46/67
Fixed-site
FCF
73.51
ISFSI
73.50
Hot Cells
Material
Categorization
76E
GDP
Security
74
MC&A
Tentative Milestones
• March 2012 – Complete stakeholder engagement
• April 2012 – Complete Technical/Regulatory Basis Document
• Octobe
October 2013
0 3 – Draft
a t Rule
ue
• October 2014 – Final Rule