Download 001

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

History of electromagnetic theory wikipedia , lookup

Electrification wikipedia , lookup

Opto-isolator wikipedia , lookup

Ohm's law wikipedia , lookup

Mercury-arc valve wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Ground loop (electricity) wikipedia , lookup

Mechanical-electrical analogies wikipedia , lookup

Power engineering wikipedia , lookup

Flexible electronics wikipedia , lookup

Electronic engineering wikipedia , lookup

History of electric power transmission wikipedia , lookup

Metadyne wikipedia , lookup

Alternating current wikipedia , lookup

Circuit breaker wikipedia , lookup

Voltage optimisation wikipedia , lookup

Telecommunications engineering wikipedia , lookup

Electrical engineering wikipedia , lookup

Surge protector wikipedia , lookup

Electrical substation wikipedia , lookup

Ground (electricity) wikipedia , lookup

Stray voltage wikipedia , lookup

Earthing system wikipedia , lookup

Electromagnetic compatibility wikipedia , lookup

Electrical wiring wikipedia , lookup

Mains electricity wikipedia , lookup

Portable appliance testing wikipedia , lookup

Electrician wikipedia , lookup

Electrical wiring in the United Kingdom wikipedia , lookup

National Electrical Code wikipedia , lookup

Transcript
 PAGE 1 OF 20
001
Electrical Safety Policy
OHS-0018
COPY#
Dates
Original: April 2, 2012
Revised: September 09, 2014
Electrical Safety Policy
(EHS-0018)
For
Issued: April 2012
Revised: September 2014
PAGE 2 OF 20
001
COPY#
Electrical Safety Policy
OHS-0018
Dates
Original: April 2, 2012
Revised: September 09, 2014
TABLE OF CONTENTS
PURPOSE ......................................................................................................................................4
SCOPE ...........................................................................................................................................4
DOCUMENT CONTROL .............................................................................................................4
DEFINITIONS...............................................................................................................................5
COVERED WORK .......................................................................................................................7
EXCLUDED WORK.....................................................................................................................8
ROLES AND RESPONSIBILITIES .............................................................................................8
EMPLOYEE INFORMATION AND TRAINING………………………..……………………..9
ARC FLASH HAZARDS………………………………………………….………………….…10
WORK PRACTICES………………………………………………………………………….…11
USE OF EQUIPMENT………………………………………………………………………..…16
PROTECTIVE EQUIPMENT…………………………………………………………...............18
PAGE 3 OF 20
001
Electrical Safety Policy
OHS-0018
COPY#
Dates
Original: April 2, 2012
Revised: September 09, 2014
APPENDICES
APPENDIX A
QUALIFIED WORKERS LIST
APPENDIX B
GROUP # 1 - ELECTRICIANS AND ELECTRICAL
SUPERVISORS
APPENDIX C
GROUP # 2 - HVAC TECHNICIANS AND
SUPERVISORS
APPENDIX D
GROUP # 3 - ENERGY TECHNICIANS AND THEIR
SUPEVISORS
APPENDIX E
GROUP # 4 - STATIONARY ENGINEERS AND THEIR
SUPERVISORS
APPENDIX F
GROUP # 5 - MAINTENANCE WORKERS AND THEIR
SUPERVISORS
APPENDIX G
GROUP # 6 - FLEET SERVICES EQUIPMENT
MECHANICS, AUTOMOTIVE MECHANICS,
AUTOMOTIVE MAINTENANCE CREW LEADER,
FLEET SERVICES SUPERINTENDENT
APPENDIX H
GROUP # 7 – OTHER UNIVERSITY EMPLOYEES
APPENDIX I
APPROACH BOUNDARIES TO ENERGIZED
ELECTRICAL CONDUCTORS
APPENDIX J
SAMPLE ARC FLASH LABELS
APPENDIX K
HAZARD RISK CATEGORY CLASSIFICATIONS
TABLE
APPENDIX L
HAZARD RISK CATEGORY PPE TABLE
PAGE 4 OF 20
Electrical Safety Policy
OHS-0018
001
COPY#
Dates
Original: April 2, 2012
Revised: September 09, 2014
1.0 PURPOSE
The purpose of this policy is to inform interested persons, including employees that Kent State
University is complying with the OSHA Electrical Safety Standard, Title 29 Code of Federal
Regulations 1910.331 - 1910.335 and the National Fire Protection Association 70E (2012
Edition). Kent State University is committed to an employee Safety and Health Program
that meets the standards established by the State of Ohio, Federal Occupational Safety and
Health Administration (OSHA), and local agencies. As a result, Kent State University will
establish written procedures for preventing electric shock, arc flash or other injuries resulting
from direct/indirect electrical contact to employees working on or near energized parts.
If, after reading this policy, you have any questions, please contact your immediate supervisor.
It is the goal of the University to provide clear understanding, safe work practices, and
involvement in the policy from every level within the University.
2.0 SCOPE
All University employees will abide by all procedures set forth in this document. It is
understood that an employee’s failure to follow these policies and procedures may subject that
employee to disciplinary action.
3.0 DOCUMENT CONTROL
3.1
Approvals: This procedure as well as all Environmental, Health and Safety
(EH&S) procedures must be approved by the Manager, Environmental Health
and Safety (MEHS).
Approved by:
Date: August 27, 2014
Manager, Environmental Health and Safety
3.2
Responsibility:
3.2.1
The Administrator of this procedure is the MEHS. This includes updating
or revising the procedure, arranging for typing and providing revised
copies to the Master Copy Holder for distribution. The Administrator will
establish a review schedule for this procedure so as to ensure that this
procedure contains only the most current information relevant to existing
federal, state and local laws and regulations governing electrical safety.
PAGE 5 OF 20
Electrical Safety Policy
OHS-0018
001
COPY#
3.2.2
4.0
Dates
Original: April 2, 2012
Revised: September 09, 2014
The Master Copy Holder for this procedure is the MEHS. MEHS is
responsible for ensuring that relevant elements of applicable quality
control procedures governing policies, programs, procedures and
checklists are being followed. This includes the preparation of revisions
to this procedure, obtaining approvals, recording changes, distribution and
compliance with other document(s).
DEFINITIONS
Affected employee An employee whose job requires him/her to operate or use a
machine or equipment on which servicing or maintenance is being performed under
lockout or tagout, or whose job requires him/her to work in an area in which such
servicing or maintenance is being performed.
Authorized employee An authorized employee is one who locks out or tags out
machines or equipment in order to perform servicing or maintenance on that machine or
equipment. An affected employee becomes an authorized employee when that employee's
duties include performing servicing or maintenance covered under this section.
Arc Flash Hazard: A dangerous condition associated with the possible release of
energy caused by an electric arc.
An arc flash hazard may exist when energized electrical conductors or circuit parts
are exposed or when they are within equipment in a guarded or enclosed
condition, provided a person is interacting with the equipment in such a manner
that could cause and electric arc.
Boundaries
Arc Flash Protection Boundary: when an arc flash hazard exists, an approach
limit at a distance from a prospective arc source within which a person could
receive a second degree burn if an electrical arc flash were to occur.
Limited Approach Boundary: A limited approach boundary is the distance from
an exposed energized electrical conductor or circuit part within which a shock
hazard exits.
Restricted Approach Boundary: An approach limit at a distance from an
exposed energized electrical conductor or circuit part within which there is an
increased risk of shock, due to electrical arc over combined with inadvertent
movement, for personnel working in close proximity to the energized electrical
conductor or circuit part
PAGE 6 OF 20
001
COPY#
Electrical Safety Policy
OHS-0018
Dates
Original: April 2, 2012
Revised: September 09, 2014
Building Maintenance Employees While there are many employees associated with
building maintenance; in this case, building maintenance employees include the
following positions: Maintenance Repair Workers, Maintenance Facilities Workers,
Recreation Facilities Workers, Pool Technicians, All Campus Preventive Maintenance
(ACPM) Specialists, and Welder.
Capable of being locked out An energy isolating device is capable of being locked out
if it has a hasp or other means of attachment to which, or through which, a lock can be
affixed, or it has a locking mechanism built into it.
Energized Connected to an energy source or containing residual or stored energy.
Energy isolating device A mechanical device that physically prevents the transmission
or release of energy.
Energy source Any source of electrical, mechanical, hydraulic, pneumatic, chemical,
thermal, or other energy.
Lockout The placement of a lockout device on an energy isolating device, in accordance
with an established procedure, ensures that the energy isolating device and the equipment
being controlled cannot be operated until the lockout device is removed.
Lockout device A device that utilizes a positive means such as a lock, either key or
combination type, to hold an energy isolating device in the safe position and prevent the
energizing of a machine or equipment.
Lockout/Tagout Procedure Form The document outlining the procedures identifying
each isolation point and the method for isolating and locking out or tagging out each
point.
Other Employee Employees whose work operations are or may be in an area
where energy control procedures may be utilized. Other employees shall be
instructed about the procedure and about the prohibition relating to an attempt to
restart or reenergize machine and equipment, which are locked and/or tagged out.
Qualified Employee A qualified employee is a person who possesses a
recognized degree, certification, or professional standing, or one who has skills
and knowledge related to the construction and operation of the electrical
equipment and installations and has received training to recognize and avoid the
hazards involved.
Servicing/Maintenance Any activity, such as repairing, adjusting, lubricating or
cleaning equipment where an employee may be exposed to unexpected energization or
startup of equipment or unexpected release of hazardous energy.
PAGE 7 OF 20
001
COPY#
Electrical Safety Policy
OHS-0018
Dates
Original: April 2, 2012
Revised: September 09, 2014
Stored Energy Residual energy that could be potentially hazardous and released
unexpectedly.
Tagout The placement of a tagout device on an energy isolating device, in accordance
with an established procedure, to indicate that the energy isolating device and the
equipment being controlled may not be operated until the tagout device is removed.
Tagout device A prominent warning device, such as a tag and a means of attachment,
which can be securely fastened to an energy isolating device in accordance with an
established procedure, to indicate that the energy isolating device and the equipment
being controlled may not be operated until the tagout device is removed.
Troubleshooting Testing energized circuits. Troubleshooting is the method used to test
energized electrical components with an approved metering or testing device to identify
the presence of voltage, amperage, faults or lack thereof.
Working On (energized electrical conductors or circuit parts): Intentionally
coming in contact with energized electrical conductors or circuit parts with the hands,
feet, or other body parts with tools, probes, or other test equipment, regardless of the
personal protective equipment a person is wearing. There are two categories of
“working on”:
Diagnostic (testing): is taking readings or measurements of electrical equipment
with approved test equipment that does not require making any physical change to
the equipment. An energized work permit is not required for testing or
troubleshooting;
Repair: is any physical alteration or electrical equipment (such as tightening
connections, removing or replacing components, etc.).
5.0
COVERED WORK
5.1
Electrical safety work practices for all personnel working on, near or with the
following installations:
5.1.1 Premises wiring. Installations of electric conductors and equipment within
or on buildings or other structures, and on other premises such as yards,
parking lots, and substations.
5.1.2 Wiring for connection to supply. Installations of conductors that connect
to the supply of electricity.
PAGE 8 OF 20
Electrical Safety Policy
OHS-0018
001
COPY#
Dates
Original: April 2, 2012
Revised: September 09, 2014
5.1.3 Other wiring. Installations of other outside conductors on the premises.
5.1.4 Optical fiber cable. Installations of optical fiber cable where such
installations are made along with electric conductors.
5.1.5 Installations in vehicles and/or equipment.
5.1.6 Generation, transmission and distribution of electric energy (including
communication and metering) located in buildings used for such
purposes or located outdoors.
5.1.7 All other electrical work as required.
6.0
EXCLUDED WORK
6.1
The provisions of CFR 29 1910.331 through 1910.335 do not apply to work performed
by qualified persons on or directly associated with the following installations:
6.1.1
7.0
Communications installations. Installations of communication equipment to
the extent that the work is covered by CFR 29 1910.268
ROLES AND RESPONSIBILITIES
7.1
Manager, Environmental Health and Safety has overall responsibility for
coordinating safety and health programs for the University. The Manager will
review and update the policy as necessary. Copies of the written policy may
be obtained from your immediate supervisor.
7.2
Department Supervisors are responsible for enforcing the operating rules and
practices within their department.
7.3
Employees and/or Student Employees who operate and/or work on or around
electrical equipment at Kent State University are required to be aware of and
follow all procedures listed in the Electrical Safety Policy and the appropriate
Safety Check-Off List.
7.4
Qualified Employees (those familiar with the construction and operation of
equipment and the hazards of working on or near exposed energized parts),
Kent State University employees who are qualified to work on, near, or with
energized electric circuits and equipment are described in Appendix AQualified Workers List.
7.4.1 Task specific qualified Employees: Those employees who by education,
training and evaluation are approved for specific tasks that expose
workers to a limited and specific amount and type of electrical hazards.
PAGE 9 OF 20
Electrical Safety Policy
OHS-0018
001
COPY#
Dates
Original: April 2, 2012
Revised: September 09, 2014
EXAMPLES:


7.5
Tasks that avoid opening of electrical enclosures/cabinets that would
expose a worker to 50 volts and above
Ballast and Bulb repair/replacement – provided training and
evaluations have taken place and proper PPE is used at all required
times.
Unqualified Employees Kent State University employees who have
limited knowledge of electrical circuitry and equipment are:
7.5.1
All other University employees
Constant awareness of and respect for electrical hazards, and compliance with all safety rules are
considered conditions of employment. Any employee who fails to follow all safety procedures
may be subject to disciplinary procedures.
8.0
EMPLOYEE INFORMATION AND TRAINING
8.1
The goal of the Kent State University Electrical Safety Policy is to ensure all
employees understand the hazards associated with electric energy and that
they are capable of performing the necessary steps to protect themselves and
their co-workers.
8.2
Every employee at Kent State University who faces the risk of electric related
injury from working on or near energized or de-energized electrical sources
receives training in electrical related safety work practices pertaining to the
individual's job assignment.
8.3
Some of the electrical safety training issues that are covered are indicated below:
Qualified/Authorized Personnel (See Appendix A for Qualified Authorized
Worker List)
These individuals will receive initial and refresher training in:
 Electrical safe work practices – Including University Electrical Safety
Policy
 LOTO training for authorized persons
 Voltage testing safety basics
 Training on employee voltage tester (as many as applies to their duties)
 Arc Flash Risks and Barriers
PAGE 10 OF 20
001
Electrical Safety Policy
OHS-0018
COPY#
Dates
Original: April 2, 2012
Revised: September 09, 2014
Unqualified Persons
These individuals will receive initial and refresher training:
 Basic Electrical Safety
 Basics of LOTO, Labeling, Arc Flash Risks and Barriers
9.0
8.4
Qualified employees are required to take successfully complete all tests as
required by each department. See appropriate Appendix for department
grouping.
8.5
Training is conducted prior to employee assignment to work on or near electrical
equipment or circuitry. Additional training sessions, information and testing are
ongoing and are required by all qualified employees.
8.6
Every employee involved with the Electrical Safety Policy signs a record
verifying that they have received a copy of the policy and the information
presented, and that they will follow all University policies and procedures
regarding electrical safety.
8.7
Each department will be responsible for custody of the signed training records, as
well as all training materials and relevant documentation.
ARC FLASH HAZARDS
Kent State University has completed a partial Arc Flash Survey and will continue to perform arc
flash surveys on new and renovated facilities. Where the arc flash survey has been completed
electrical disconnects, panels, fuses and other electrical service areas will be labeled (see
Appendix J). The labels contain the following information:




Warning or Danger
o Warning for disconnects with incident energies ≤ 40 cal/cm2
o Danger for disconnects with Incident energies > 40 cal/cm2
Hazard Boundaries
Incident Energy
Voltage/Shock Hazard with cover removed
University Employees will be taught how to apply the information on the labels to setup the
appropriate boundaries and what PPE is necessary to protect them from Arc Flash and shock
hazards.
PAGE 11 OF 20
Electrical Safety Policy
OHS-0018
001
COPY#
Dates
Original: April 2, 2012
Revised: September 09, 2014
Where an Arc Flash Survey has not been completed or Arc Flash Labels are not present, Kent
State University is following the guidance in the National Fire Protection Association (NFPA)
70E, 2012 Edition, and safety-related work practices (Appendices I, K, and L). The work
practices have been established to protect against arc flash hazards resulting from either direct or
indirect electrical contacts of 50 volts or more when work is performed near or on equipment of
circuits that are or may be energized
9.1 Approach boundaries to energized electrical conductors or circuit parts for shock
protection (Please see Appendix I, or NFPA 70E, 2012 Edition Table 130.2(c)).
9.2 Arc Flash Protection Boundary
9.2.1 Voltage levels between 50 Volts and 600 Volts. In those cases where
detailed arc flash hazard analysis calculations are not performed for
systems that are between 50 volts and 600 volts, the Arch Flash Protection
Boundary shall be 4.0 ft, based on the product clearing time of 2 cycles
(0.033 seconds) and the available bolted fault current of 50 kA or any
combination not exceeding 100 kA cycles (1667 ampere seconds). When
the product of clearing times and bolted fault current exceeds 100 kA, the
Arc Flash Protection Boundary shall be calculated.
10.0
WORK PRACTICES
Safety-related work practices have been established to prevent electric shock or other injuries
resulting from either direct or indirect electrical contacts, when work is performed near or on
equipment or circuits that are or may be energized.
10.1
Pre-job Briefing
A pre-job briefing on the type of work being performed and
what is involved should always be done first. When simple lockout/tagout is
performed and an employee is simply verifying a zero energy state on equipment
with only one energy source, and only one employee is conducting the work then
a job briefing is only necessary at the beginning of a work shift. Items to be
covered include:










Information needed to perform the job
Teamwork requirements
Safety items such as a review of the hazards involved
Personal protective equipment and clothing requirements
Lockout/tagout requirements
Hot work or other special issues
Expected outcomes
What to do if there is a problem or unexpected response
Emergency procedures
Emergency escape routes
PAGE 12 OF 20
Electrical Safety Policy
OHS-0018
001
COPY#
10.2
Dates
Original: April 2, 2012
Revised: September 09, 2014
Electrical Safe Work Condition
Energized electrical conductors and circuit parts to which an employee might be
exposed shall be put into an electrically safe work condition before an employee
performs work if any of the following conditions exists:

The employee is within the limited approach boundary

The employee interacts with equipment where conductors or circuit parts are
not exposed, but an increased risk of injury from an exposure to an arc flash
hazard exists.
The employee is within the arc flash boundary with exposed energized
electrical conductors or circuit parts.

10.2.1 Energized work shall only be permitted where the university
can demonstrate that de-energizing introduces additional
hazards or increased risk. A Energized Work Permit is
required for all energized work.
10.2.1.1 Examples of increased or additional hazards include, but
are not limited to, interruption of life support equipment,
deactivation of emergency alarm systems, shut-down of
hazardous location ventilation equipment, or removal of
illumination for an area.
10.2.1.2 Examples of work that may be performed on or
near exposed energized conductors or circuit parts because of
infeasibility due to equipment design or operational
limitations include:



Testing
Troubleshooting
Steps required to verify an electrical safe work condition
10.2.2 Conductors and parts of electric equipment that have been deenergized but have not been locked out or tagged shall be
treated as energized parts.
10.3
Control of Hazardous Energy Program (Lockout/Tagout)
While any employee is exposed to contact with parts of fixed electric equipment
or circuits which have been de-energized, the circuits energizing the parts shall be
locked out, tagged out, or both locked and tagged out in accordance with the Kent
State University Control of Hazardous Energy Program (Lockout/Tagout).
PAGE 13 OF 20
001
Electrical Safety Policy
OHS-0018
COPY#
Dates
Original: April 2, 2012
Revised: September 09, 2014
10.3.1 As used in this section, fixed equipment refers to equipment
fastened in place or connected by permanent wiring
methods.
10.4
Vehicular and Mechanical Equipment
Any vehicle or mechanical equipment capable of having parts of its structure
elevated near energized overhead lines shall be operated so that a clearance of 10
ft. (305 cm) is maintained. If the voltage is higher than 50kV, the clearance shall
be increased 4 in. (10 cm) for every 10kV over that voltage. However, under any
of the following conditions, the clearance may be reduced:
10.4.1 If the vehicle is in transit with its structure lowered, the clearance
may be reduced to 4 ft. (122 cm). If the voltage is higher than
50kV, the clearance shall be increased 4 in. (10 cm) for every 10
kV over that voltage.
10.4.2 If insulating barriers are installed to prevent contact with the lines,
and if the barriers are rated for the voltage of the line being
guarded and are not a part of or an attachment to the vehicle or its
raised structure, the clearance may be reduced to a distance
within the designed working dimensions of the insulating barrier.
10.4.3 If the equipment is an aerial lift insulated for the voltage involved,
and if a qualified person performs the work, the clearance
(between the uninsulated portion of the aerial lift and the power
line) may be reduced to the distance given in the Approach
Distances for Qualified Employees Table. Appendix I.
10.4.4 Employees standing on the ground may not contact the vehicle or
mechanical equipment or any of its attachments, unless:
10.4.4.1 The employee is using protective equipment rated for the
voltage; or
10.4.4.2 The equipment is located so that no uninsulated part of its
structure (the portion of the structure that provides
conductive path to employees on the ground) can come
closer to the line than permitted in this section.
PAGE 14 OF 20
001
Electrical Safety Policy
OHS-0018
COPY#
Dates
Original: April 2, 2012
Revised: September 09, 2014
10.4.4.3 If any vehicle or mechanical equipment capable of having
parts of its structure elevated near energized overhead
lines is intentionally grounded, employees working on
the ground near the point of grounding may not stand at
the grounding location whenever there is a possibility of
overhead line contact.
10.4.4.4 Additional precautions, such as the use of barricades or
insulation, shall be taken to protect employees from
hazardous ground potentials, depending on earth
resistivity and fault currents, which can develop within
the first few feet or more outward from the grounding
point.
10.5
Illumination
10.5.1 Employees may not enter spaces containing exposed energized parts,
unless illumination is provided that enables the employees to perform
the work safely.
10.5.2 Where lack of illumination or an obstruction precludes observation of the
work to be performed, employees may not perform tasks near exposed
energized parts. Employees may not reach blindly into areas that may
contain energized parts.
10.6
Confined or Enclosed Work Spaces
10.6.1 When an employee works in a confined or enclosed space (such as a
manhole or vault) that contains exposed energized parts, the employer
shall provide, and the employee shall use, protective shields,
protective barriers, or insulating materials as necessary to avoid
inadvertent contact with these parts.
10.6.2 Doors, hinged panels, and the like shall be secured to prevent their
swinging into an employee and causing the employee to contact
exposed energized parts.
10.6.3 Refer to Kent State University Confined Space Program.
10.7
Conductive Materials and Equipment
Conductive materials and equipment shall not be inside the Limited approach
boundary to exposed energized conductors or circuit parts.
PAGE 15 OF 20
001
Electrical Safety Policy
OHS-0018
COPY#
10.8
Dates
Original: April 2, 2012
Revised: September 09, 2014
Portable Ladders
Portable ladders shall have nonconductive side rails if they are used where the
employee or the ladder could contact exposed energized parts.
10.9
Conductive Apparel
10.9.1 Conductive articles of jewelry and clothing (such a watch bands, bracelets,
rings, key chains, necklaces, metalized aprons, cloth with conductive
thread, or metal headgear) may not be worn if they might contact exposed
energized parts.
10.9.2 Metal frame glasses (prescription or otherwise) shall be covered with arc
rated shield and secured with approved strap whenever qualified worker
is inside the limited approach boundary to live parts.
10.9.3 Such articles may be worn if they are rendered nonconductive by
covering with approved and rated insulated protective
equipment such as gloves. It is still recommended to remove to
protect from heat that could be caused by arc flash and still
cause injury.
10.10 Housekeeping Duties
10.10.1 Where live parts present an electrical contact hazard, employees may
not perform housekeeping duties within the limited approach
boundary, unless adequate safeguards (such as insulating equipment
or barriers) are provided.
10.10.2 Electrically conductive cleaning materials (including conductive
solids such as steel wool, metalized cloth, and silicon carbide, as well
as conductive liquid solutions) may not be used within the Restricted
Approach Boundary unless procedures are followed which will
prevent electrical contact.
10.11 Interlocks
10.11.1 Only a qualified person following the requirements of this section may
defeat an electrical safety interlock, and then only temporarily while he
or she is working on the equipment.
10.11.2 The interlock system shall be returned to its operable condition when this
work is completed.
PAGE 16 OF 20
001
Electrical Safety Policy
OHS-0018
COPY#
11.0
Dates
Original: April 2, 2012
Revised: September 09, 2014
USE OF EQUIPMENT
The following Electrical Safety Related Work Practices have been adapted from
CFR 29 1910.334, Use of Equipment.
11.1
Portable Electric Equipment
11.1.1 Portable Electric Equipment applies to the use of cord and plug connected
equipment, including flexible cord sets (extension cords).
11.1.2 Equipment must be handled in a way that will not cause damage. Electric
cords connected to equipment may not be used for hoisting or lowering
the equipment; may not be fastened with staples or hung in a manner that
could damage the outer jacket or insulation.
11.1.3 A visual inspection shall be exercised before use on each shift for external
defects and for evidence of possible internal damage. If a defect or
evidence of damage is noted, remove the equipment from service and
return it to the Department Supervisor.
11.1.4 Attachment plugs that are to be connected to a receptacle shall be checked
to ensure that they are of proper mating configuration.
11.1.5 A flexible cord used with grounding type equipment shall contain an
equipment-grounding conductor.
11.1.6. Attachment plugs and receptacles may not be connected or altered in a
manner that would prevent proper continuity of the equipmentgrounding conductor at the point where plugs are attached to
receptacles.
11.1.6.1 Additionally, these devices may not be altered to allow the
grounding pole of a plug to be inserted into slots intended for
connection to the current carrying conductors.
11.1.6.2 Adapters that interrupt the continuity of the equipment grounding
connection may not be used.
11.1.7 Portable electric equipment and flexible cords used in highly conductive
work locations (such as those inundated with water or other conductive
liquids), or in job locations where employees are likely to contact water
or conductive liquids, shall be approved for those locations and shall be
ground fault protected (GFCI).
PAGE 17 OF 20
001
Electrical Safety Policy
OHS-0018
COPY#
Dates
Original: April 2, 2012
Revised: September 09, 2014
11.1.8 Employees hands may not be wet when plugging and unplugging flexible
cords and cord and plug connected equipment, if energized equipment is
involved.
11.1.9 Energized plug and receptacle connections may be handled only with
insulating protective equipment if the condition of the connection could
provide a conducting path to the employee's hand (if, for example, a cord
connector is wet from being immersed in water).
11.1.10 Locking type connectors shall be properly secured after connection.
11.2
Electric Power and Lighting Circuits
11.2.1 Load rated switches, circuit breakers, or other devices specifically
designed as disconnecting means shall be used for the opening,
reversing, or closing of circuits under load conditions.
11.2.2 Cable connectors not of the load break type, fuses, terminal lugs, and
cable splice connections may not be used for such purposes, except
in an emergency.
11.2.3 After a circuit is de-energized by a circuit protective device, the
circuit may not be manually re-energized until it has been determined that
the equipment and circuit can be safely energized.
11.2.4 Repetitive, manual re-closing of circuit breakers or reenergizing circuits
through replaced fuses is prohibited.
11.2.4.1 When it can be determined from the design of the circuit and the
overcurrent devices involved that the automatic operation of a
device was caused by an overload rather than a fault condition,
no examination of the circuit or connected equipment is needed
before the circuit is re-energized.
 A qualified-Authorized person shall investigate and
document that the circuit is safe to re-energize.
11.3
Overcurrent protection of circuits and conductors may not be modified, even on a
temporary basis, beyond that allowed by 29 CFR 1910.304(e).
11.4
Test Instruments and Equipment
11.4.1 Only qualified persons may perform testing work on electric circuits or
equipment.
PAGE 18 OF 20
Electrical Safety Policy
OHS-0018
001
COPY#
Dates
Original: April 2, 2012
Revised: September 09, 2014
11.4.2 Test instruments and equipment and all associated test leads, cables,
power cords, probes, and connectors shall be visually inspected for
external defects and damage before the equipment is used.
11.4.2.1 If there is a defect or evidence of damage that might expose an
employee to injury, the defective or damaged item shall be
removed from service and forwarded to the employee’s
Supervisor.
11.4.2.2 No employee may use it until repairs and tests necessary to
render the equipment safe have been made. Repairs shall
only be done by approved/authorized department personnel.
11.4.3 Test instruments and equipment and their accessories shall be rated with
an overvoltage category of 3 or better for the circuits and equipment to
which they will be connected and shall be designed for the environment in
which they will be used.

11.5
Testers and Leads shall be rated for the same voltages and
categories (no mix and match).
Use of Flammable or Ignitable Materials
11.5.1 Where flammable materials are present, electric equipment capable of
igniting them shall not be used, unless measures are taken to prevent
hazardous conditions from developing.
11.5.2 Such materials include, but are not limited to: flammable gases, vapors or
liquids; combustible dust; and ignitable fibers or filings.
11.5.3 Electrical installation requirements for locations where flammable
materials are present on a regular basis are contained in 29 CFR
1910.307.
12.0
PROTECTIVE EQUIPMENT
12.1 Personal Protective Equipment
12.1.1 Personal protective equipment requirements are contained in
CFR 29 1910.137, Electrical Protective Equipment
12.1.2 Employees working in areas where there are potential electrical hazards
shall be provided with, and shall use, electrical protective equipment
that is appropriate for the specific parts of the body to be protected and
for the work to be performed.
PAGE 19 OF 20
001
Electrical Safety Policy
OHS-0018
COPY#
Dates
Original: April 2, 2012
Revised: September 09, 2014
12.1.3 Protective equipment shall be maintained in a safe, reliable condition and
shall be periodically inspected or tested.
12.1.4 If the insulating capability of protective equipment may be subject to
damage during use, the insulating material shall be protected. (For
example, an outer covering of leather is sometimes used for the
protection of rubber insulating material.)
12.1.5 Employees shall wear nonconductive head protection wherever there is a
danger of head injury from electric shock or burns due to contact with
exposed energized parts.
12.1.6 Employees shall wear protective equipment for the eyes and face wherever
there is danger of injury to the eyes or face from electric arcs, flashes,
blasts or Electrical shock. (See Appendix L)
12.1.7 Undergarments shall be made of non-melting or untreated natural fiber.
Waste bands are exempt from this requirement.
12.2
General Protective Equipment and Tools
12.2.1 When working near exposed energized conductors or circuit parts nearer
than the Limited Approach Boundary, each qualified employee shall use
insulated tools or handling equipment if the tools or handling equipment
might make contact with such conductors or parts.
12.2.1.1 If the insulating capability of insulated tools or handling
equipment is subject to damage, the insulating material shall be
protected.
12.2.2 Fuse handling equipment, insulated for the circuit voltage, shall be used to
remove or install fuses when the fuse terminals are energized.
12.2.3 Ropes and hand lines used near exposed energized parts shall be
nonconductive.
12.3
Protective shields, barriers, or insulating materials
12.3.1 Protective shields, barriers, or insulating materials shall be used to protect
each qualified employee from shock, burns, or other electrically related
injuries while that employee is working near exposed energized parts
which might be accidentally contacted or where dangerous electric
heating or arcing might occur.
PAGE 20 OF 20
001
Electrical Safety Policy
OHS-0018
COPY#
Dates
Original: April 2, 2012
Revised: September 09, 2014
12.3.2 When employees are exposed to live parts nearer than the restricted
approach boundary they must create an electrical safe working
condition or guard the live parts to prevent accidental damage
(voltage rated gloves are only considered proper guarding for the
parts a worker intends on contacting).
12.4
Alerting Techniques
12.4.1 The following alerting techniques shall be used to warn and protect
employees from hazards that could cause injury due to electric shock,
burns, or failure of electric equipment parts:
12.4.1.1 Safety signs, safety symbols, labels, or accident prevention tags
shall be used where necessary to warn employees about
electrical hazards that may endanger them, as required by CFR
29 1910.145.
12.4.1.2 Barricades shall be used in conjunction with safety signs where it
is necessary to prevent or limit employee access to work areas
exposing employees to uninsulated energized conductors or
circuit parts.
12.4.1.3 Conductive barricades may not be used where they might cause
an electrical contact hazard.
12.4.1.4 If signs and barricades do not provide sufficient warning and
protection from electrical hazards, an attendant shall be stationed
to warn and protect employees.
APPENDIX A
Qualified Workers List
Group # 1 – Electrical Workers and Electrical Supervisors
Group # 2 – HVAC Technicians and HVAC Supervisors
Group # 3 – Energy Technicians and their Supervisors
Group # 4 – Stationary Engineers and Their Supervisors
Group # 5 – Building Maintenance Workers and Their Supervisors
All Campus Preventive Maintenance (ACPM) Specialists
Maintenance Repair Workers,
Maintenance Facilities Workers
Recreation Facilities Workers
Pool Technicians
Plumbers
Steamfitters
Welder
Water Treatment Technicians
Group # 6 - Fleet Services Employees and Their Supervisors
Equipment Mechanics Automotive
Mechanics
Automotive Maintenance Crew Leader
Fleet Services Superintendent
Group # 7 – Other University Employees
Manufacturing Laboratory
Technician Equipment Laboratory
Technician Research Engineer
APPENDIX B
Qualified Workers – Group # 1
Electricians and Electrical Supervisors
Qualified Person per NFPA
70 E (Definitions)
“One who has skills and knowledge related to the construction and operation of the
electrical equipment and installations and has received safety training on the
hazards involved”
Kent State University Electricians are considered “qualified” to work on electrical
systems and equipment. As a requirement for employment, Kent State University
Electricians are required to successfully pass a written and “hands-on” electrical test
as well as provide proof of extensive electrical work experience. In addition to their
previous safety training, each electrician is required to take regularly scheduled
electrical safety courses provided by the university. Specialized training is also
provided to the electricians for electrical work that requires additional skills such as
medium voltage switching.
Where the Kent State University Arc Flash Study has been completed the label is used
to determine boundary distances, shock hazard, and incident energy. From this
appropriate PPE can be selected. Where the study has not been completed at the date
of this publication, thus, NFPA 70E tables and other sections have been used as the
standard for the safe work practices and levels of required PPE required by the
electricians (including the Electrical Supervisor) (See Part IV).
All university electricians are provided FR rated 8 cal/cm2, long sleeve shirt and pants
as their daily uniform.
Part I
Kent State University Electrical Safety Procedure Checklist
Part II
Energized Electrical Work Permit Chart
Part III
Energized Electrical Work Permit
Part IV
Engineered Safe Work Practices
Part I
UNIVERSITY FACILITIES MANAGEMENT
ELECTRICAL SAFETY PROCEDURE CHECKLIST
DATE: ___________
TIME: ____________
EMPLOYEE: ________________________________________________________________
DESCRIPTION OF JOB: _______________________________________________________
WORK LOCATION: __________________________________________________________
WORK ORDER #: _____________________________________________
DATE & TIME SUPERVISOR VISITED JOB SITE FOR SAFETY CHECKS: _______________
YES
NO
ELECTRICAL SAFETY CHECK OFF LIST
PERSONAL PROTECTIVE EQUIPMENT
REQUIREMENTS
I have reviewed this job assignment with my supervisor and have
been made aware of possible safety issues and proper procedures
to follow.
 Lockout/Tag Out
Do I know and understand the proper procedures to do the job?
 Ground fault protection
 500V insulated gloves
Do I have the right PPE and tools for the job I’ve been assigned?
Have I informed the affected personnel that I will be de-energizing
the panel, circuit, and/or equipment and have I relayed the
approximate time of the outage?
Is my work environment well lit?
 5 KV gloves
15 KV gloves
 Protective sleeves
 Electrical hard hat
 Insulator boots
Is my work area free of water, tripping hazards or any other
hazards?
If I have identified any safety hazards, have I contacted my
supervisor and/or other responsible parties in order to remedy the
situation?
If using extension cords or power tools, are the cords free from
damage (cracked, cut, or taped)?
Do I feel that I can do the job safely? Have I communicated this with
my supervisor? My alertness is not impaired by illness or fatigue
and I shall not reach blindly into areas containing live parts.
What is the operating voltage?
Are there internal safety mechanisms?
After turning disconnecting means to the “OFF” position, have I
checked to see if the conductors are de-energized using the
appropriate tester?
 Insulator mat
 Insulator blanket
 1000V rated insulated tools
 Arc rated Jacket
 Safety harness and tripod
 Force air machine
 Respirator
 Eye and face protection
 Long sleeved shirt
 Ear protection
 Caution tape or barriers
 Balaclava (Head Sock) or Arc Flash Hood
 Other _____________________________
During troubleshooting, if testing equipment in an energized state,
have I used the proper PPE equipment and tools for the job?
Employee Signature: _________________________________________________
Supervisor Signature: _________________________________________________
This document must be completed on each project as required by
University Facilities Management
Part II Flowchart Reviewed By: Review Before Star ng Electrical Work What is the Voltage Level? > 50 VOLTS < 50 VOLTS Are there exposed live parts or Arc Flash Hazards? YES What type of work is to be performed? Any physical altera ons required? Such as adding, removing or replacing of connec ons or components Will the equipment be put in an electrically safe work condi on? YES  Disconnected  Locked and tagged out  Tested  Grounded (if applicable) Test before touch Lock Out/Tag Out Procedures NO NO The decision to de‐
energize should include considera on of the capacity of the electrical source and any overcurrent protec on (fuse or circuit breaker) between the source and the worker Follow YES Apply good maintenance prac ces and protect the electrical systems and parts from mechanical damage Iden fy the hazards Follow Arc Flash Label or NFPA 70 tables 130.7(C)(9) and 130.7
(C)(10) where labels are not present. Follow engineered safe work prac ces handout for proper PPE NO Follow Arc Flash Label or NFPA 70 tables 130.7(C)(9) and 130.7
(C)(10) where labels are not present. Follow engineered safe work prac ces handout for proper PPE Energized electrical work permit not required Energized electrical work permit required Follow all safe work prac ces that apply NO Is the equipment now in an electrically safe work condi on? YES Proceed to work safely Part III
ENERGIZED ELECTRICAL WORK PERMIT
Part 1: TO BE COMPLETED BY THE REQUESTER:
Work Order Number:
1. Description of
Job location:
circuit/equipment
2. Description of work to be done:
3. Justification of why the circuit/equipment cannot be de-energized or the work deferred until the next scheduled outage:
Requester/Title
Requester’s
Signature
Date
Part II: TO BE COMPLETED BY THE ELECTRICALLY QUALIFIED* PERSONS DOING THE WORK:
1. Description of the Safe Work Practices to be employed [NFPA 70E, 110.8 (B)]:
2. Shock Hazard Analysis: Voltage Level Phase to Phase
Limited Approach
Boundaries [NFPA 70E,
Table 130.2 (c)] or
Label:
Flash Protection
Boundary:
Hazard/Risk Category
Restricted Prohibited
3. Results of Hazard/Risk Analysis [NFPA 70E, 130.3]:
Assumed (100 KA or less) or Calculated (Circle one)
OR Calculated Incident Energy at 18”
4. List personal protective equipment to be used to perform the assigned task [Appendix L]: (Circle PPE Required below)
Arc –rated jacket(20 Calories)/Arc Flash hood / Face shield/head sock/ Electrical Hardhat/ Safety glasses or goggles/Ear protection/ Arc rated rubber and leather
gloves**
5. Means employed to restrict the access of unqualified persons from the work area [NFPA 70E, 110.8(A) (2)]:
(Circle restriction method(s) being used) Signs/ Barrier/Qualified Attendant
6. Evidence of completion of a Job Briefing including discussion of any job-related hazards [NFPA 70E, Table 110.7(G)]:Electrical Safety
Procedure Checklist
7. Do you agree the above described work can be done safely? YES / NO (Circle: If no return to requester)
Electrically Qualified
Persons*
Electrically Qualified
Persons*
Date
Duration of Work:
Beginning Date /Time
Ending Date/Time
Date
Part III: SIGNATURES TO PERFORM ENERGIZED ELECTRICAL WORK AND WITNESS TO WORK PERFORMED:
Electrical Supervisor
or Manager
Date /Time Witnessed
* One who has skills and knowledge related to the construction and operation of the electrical equipment and Installations and has received safety training on the hazards
involved per NFPA 70E definition.
** Arc Rated Uniforms and Leather shoes standard issue to KSU Electricians and thus assumed and not listed in the selection of Personal Protection Equipment
Part IV
Engineered Safe Work Practices
(For KSU Electricians)
A
5
Electrical Task to be Performed
6
7 13,200 Volt Equipment
8 Main Breaker Line Up 9
10
11
12
13
Switching Main Transformers
Tie breakers
ASCO Equipment
Switching Transformers (Padmount) Exterior
B
C
Engineered Safe Work Practices
Hazard /Risk Category
Main Feeder Breakers on the 13,200 volt line up will only be switched remotely from the Power Plant Control Room
Main Transformers (T1 and T2) will only be switched remotely from the ASCO control panel located NW of GT1 Turbine in the Power Plant Buddy System, Supervisory Authorization Required
Control and Display Panel only
No Hazard,Remote Switching No Hazard,Remote Switching 4
No PPE Required
Buddy System, Switching rotory Switches, switching procedures required
Infrared Imaging, verifying de‐energized state
4
2
Buddy System, Switching 2
19 Switches (Exterior)
Buddy System, Performing switching, Switching procedures required
2
20 S&C PME Switches
Buddy System, Performing switching, Switching procedures required
2
21 S&C Vista Switches
Buddy System, Performing switching, Switching procedures required
2
Buddy System, Performing switching, Switching procedures required
2
14 1) Primary Side (13,200)
15 2) Secondary Side (208 or 480)
16
17 Transformers (Dry) interior
18
22
23
24
25
26
27
28
29
Switches (Interior)
G&W Knife Switches
Manholes
Junction Boxes
Use of Phasing Sticks
Electrical Task to be Performed
Buddy System, Supervisory Authorization Required
Call Electrical contractor for inspection and repair
KSU Personnel will not use phasing sticks on 13.2v gear
Engineered Safe Work Practices
PPE TBD Per Event
0
N/A
Hazard /Risk Category
4160 Volt Equipment
30 Transformers (Padmount) Exterior
31
Buddy System, Performing switching, Switching procedures required
2
32 Transformers (Dry) interior
33
34 Switches
Buddy System, Performing switching, Switching procedures required
2
35 Switches (Exterior)
Buddy System, Performing switching, Switching procedures required
2
Page 1 of 3
Part IV
Engineered Safe Work Practices
(For KSU Electricians)
A
B
C
Electrical Task to be Performed
Engineered Safe Work Practices
Hazard /Risk Category
36 Switches (Interior)
Buddy System, Performing switching, Switching procedures required
2
37 G&W Knife Switches
38 Main breaker line up Buddy System, Performing switching, Switching procedures required
Buddy System, Supervisory Authorization Required
2
4
39 Tie breakers
40 Junction Boxes
41 Manholes
Isolate Intermediate Transformers using main breakers before operating, Buddy system, Supervisory Authorization required
Call Electrical contractor for inspection and repair
Buddy System, Supervisory Authorization Required,
5
42 Use of Phasing Sticks
43 Allerton Building Transformer
44 Allerton Sectionizers
45
Electrical Task to be Performed
46
47 Misc. Electrical Equipment
KSU Personnel will not use phasing sticks on 4160v gear
Isolate transformer remotely using breaker at substation, Buddy System, Supervisory Authorization Required
Isolate sectionizer remotely using breaker at substation, test and pull load break elbows de‐energized, Buddy System, Supervisory Authorization Required
Engineered Safe Work Practices
0
0
PPE TBD Per Event
N/A
4
4
Hazard /Risk Category
De‐energize and lockout/tagout circuits, use battery light for illumination, Buddy System
Take caution when lifting lid, Isolate, LO/TO if possible
Isolate, LO/TO if possible
Isolate, LO/TO if possible
Buddy System, Supervisory Authorization Required
0
0
2
2
Proper PPE required
Proper PPE required
2
2
Proper PPE required
0
Proper PPE required
Proper PPE required
2
2
0 (see glove comments on left)
48
49
50
51
52
53
54
55
Repairing Tunnel lights
Removing lid on Quazite box
Hand holes on Light Poles (testing for voltage )
Lighting Timers (testing )
Allerton Medium voltage rooms
Junction Boxes
120/208 Volts (inside 3 ft 6 in approach boundry ) 277/480 Volts (inside 3 ft 6 in approach boundry )
56
57
58
59
120/208 or 277/480 volts (outside 3 ft 6 in approach boundry )
Using Metal fishtape in conduit or Junction boxes
120/208 Volts (inside 3 ft 6 in approach boundry ) 277/480 Volts (inside 3 ft 6 in approach boundry )
60
61
62
63
120/208 or 277/480 volts (outside 3 ft 6 in approach boundry )
Using Non‐Metal fishtape in conduit or Junction boxes
120/208 Volts (inside 3 ft 6 in approach boundry ) 277/480 Volts (inside 3 ft 6 in approach boundry )
Proper PPE required
Proper PPE required
2
2
64 120/208 or 277/480 volts (outside 3 ft 6 in approach boundry )
Proper PPE required
0
500 volt rubber and leather gloves required for shock protection
Page 2 of 3
Part IV
Engineered Safe Work Practices
(For KSU Electricians)
A
5
65
66
67
68
69
70
71
72
73
74
B
C
Electrical Task to be Performed
Testing Variable Frequency Drives
Removing fuses 600v or less
Resetting Breakers that are tripped
120/208 Volts (Lighting circuits only)
277/480 Volts (Lighting circuits only)
Engineered Safe Work Practices
Proper PPE required
Proper PPE required
Proper PPE required
Max allow reset is 1 with Proper PPE worn
Max allow reset is 1 with Proper PPE worn
Hazard /Risk Category
2
2
2
0
2
Electrical Task to be Performed
Engineered Safe Work Practices
Hazard /Risk Category
Misc. Electrical Equipment
If overload of circuit can be verified and corrected, breaker can be Resetting Breakers that are tripped (Non‐lighting circuits) 120/208 or reset with Proper PPE If overload cannot be verified, fault must be cleared and corrected 277/480 v
before resetting the breaker using proper PPE
75
Work performed where energized parts exposed (Live Work) for Tighting of lugs (Panels, Disconnects, Motor starters, etc) permitted voltages not greater than 480 volts
with use of 1000v insulated tools and proper PPE without Electrical Work Permit. Alterations such as adding, removing, or replacement of connections or components require a Energized Electrical Work permit.
76
Use 500 volt rated gloves instead of leather glove to provide shock Florescent Fixtures with Battery backup
77
protection
Page 3 of 3
2
2
0 (see glove comments on left)
APPENDIX C
Qualified Workers – Group #2
HVAC Technicians and Their Supervisors
The level of knowledge and skill the qualified personnel in this group include the ability to troubleshoot, test and repair the electrical supply and control circuits from the disconnecting means to the
energized load. These circuits will include: the heating, ventilating, refrigeration and air conditioning
systems, and their associated equipment installed at Kent State University.
The authorized work, trouble-shooting and testing level by persons in this group is not to exceed 480 volts
circuits live or de-energized. The only exception will be high voltage ignition systems used on gas fired
equipment. Trouble-shooting and circuit testing are the only procedures that can be conducted on live circuits
above 50 volts. It is mandatory that 500 volt gloves with leather protectors, face shields and fire resistant (FR)
rated clothing be worn by all technicians when testing and trouble-shooting these live circuits. Only after all
circuits are verified de-energized, all stored energy sources are released and the proper lockout/tagout
procedure has been followed can repairs be made without protective gear.
This group of qualified electrical workers is limited to 480 volts, and incident energy of 8 cal./cm2 where the
arc flash survey has been completed or NFPA 70E Hazard Risk Category 2 where the study has not been
completed. Where the arc flash study has not been completed, determine hazard risk category and appropriate
PPE by using the NFPA tables found in Appendices K and L.
Part I
HVAC Technician Safety Check-Off List
Part II HVAC Technician Flow Chart
Part I
GROUP 2: HVAC TECHNICIAN SAFETY CHECK-OFF LIST
YES
NO
ITEM TO CONSIDER
I have reviewed this job assignment with my supervisor and have
been made aware of possible safety issues and proper procedures to
follow.
Do I know and understand the proper procedures to do the job?
Do I have the right PPE and tools for the job I have been assigned?
PROCEDURES & PERSONAL
PROTECTIVE EQUIPMENT
REQUIREMENTS
Lockout/Tag Out
Ground fault protection
500V insulated gloves
Leather protector gloves
Have I informed the affected personnel that I will be de-energizing
the panel, circuit, and/or equipment and have I relayed the
approximate time of the outage?
Safety harness and tripod
Is my work environment well lit?
Respirator
Is my work area free of water, tripping hazards or any other hazards?
i.e. Was dry ice ever used in this space?
Force air machine
Eye or face protection
Long sleeved shirt
If I have identified any safety hazards, have I contacted my
supervisor and/or other responsible parties in order to remedy the
situation?
Ear protection
If using extension cords or power tools, are the cords free from
damage (ground pin removed, cracked, cut, or taped)?
Electrical Hard Hat/w Shield
Caution tape or barriers
Air space monitor
Do I feel that I can do the job safely? Have I communicated this with
my supervisor? My alertness is not impaired by illness or fatigue and
I shall not reach blindly into areas containing live parts.
Lifting platform or crane
What is the operating voltage? What is the HRC or Incident
Energy(480 volt, HRC 2, Incident Energy 8 cal/cm 2 max!)
Confined space permit
___________________________________
Are there internal safety mechanisms? I.e. Anything other
than the obvious devices like H.O.A. or disconnects, that could start
or stop this equipment.
After turning disconnecting means to the “OFF” position, have I
checked to see if the conductors are de-energized using the
appropriate tester? There may be more than one energy source in the
device.
Asbestos abatement required
Hot work permit
Fire extinguisher
Balaclava [Head Sock] or Arch Flash Hood
Other
During troubleshooting, if testing equipment in an energized state,
have I used the proper PPE equipment and tools for the job?
Print Name: ___________________________Print Name: ________________________________
(Employee)
(Supervisor)
Employee Signature: ____________________Supervisor Signature: ________________________
GROUP 2, PART II: HVAC Technician Flow Chart
Does the task involve exposure to energized components with voltage greater than 50 volts? YES
NO
Does the task involve testing & amping of electrical circuit?
YES
NO
De‐energize the Circuit. Lock and tag out.
NO
Has the authorization of HVAC supervisor been obtained? STOP ‐ YES
DO NOT CONTINUE WORK. CONSULT 1. Has proper illumination been verified? 2. Do you have the required Shock and Arc Flash PPE to complete the job safely? 3. Is the job site clear from all safety hazards (tripping, wet conditions, and are approach distances confirmed?) NO
STOP – DO NOT CONTINUE WORK. CONSULT WITH HVAC SUPERVISOR. YES PROCEED WITH AUTHORIZED WORK. APPENDIX D
Qualified Workers - Group # 3
Energy Technicians and Their Supervisors
The level of knowledge and skill of the qualified personnel in this group includes the ability to
troubleshoot, test and repair the low voltage electrical supply and control components from the
digital controller power source to the controlled device. These circuits will include: Facilities
Management and Automation Control Systems, electronic data communication and acquisition
networks, heating, ventilating, refrigeration and air conditioning control systems, and their
associated peripheral equipment installed at Kent State University
The authorized work, trouble-shooting and testing level by persons in this group is not to
exceed 120 volt circuits live or de-energized. They are limited to Hazard Risk Category
2 or incident energy up to 8 cal/cm2. Trouble-shooting and circuit testing are the only
procedures that can be conducted on live circuits above 50 volts. It is mandatory that 500
volt gloves with leather protectors, Arc Rated face shields, and clothing be worn by all
technicians when testing and troubleshooting these live circuits over 50 volts. Only after all
circuits are verified de-energized, all stored energy sources are released and the proper
lockout/tagout procedure has been followed can repairs be made without protective gear.
This group of qualified electrical workers is limited to 480 volts, and incident energy of 8
cal./cm2 where the arc flash survey has been completed or NFPA 70E Hazard Risk Category 2
where the study has not been completed. Where the arc flash study has not been completed,
determine hazard risk category and appropriate PPE by using the NFPA tables found in
Appendices K and L.
Part I
Energy Technician Safety Check-Off List
Part II Energy Technician Safety Flow Chart
Part I GROUP 2: ENERGY TECHNICIAN SAFETY CHECK‐OFF LIST Date:____________________ Time:_____________________ Employee: ____________________________________________________________________________ Description of Job: _____________________________________________________________________ Work Location: ________________________________________________________________________ Work Order or Log Number: ______________________________________________________________ Date, Time & Initials Supervisor Visited Job Site for Safety Checks: _______________________________ YES
NO
PERSONAL PROTECTIVE EQUIPMENT
ELECTRICAL SAFETY CHECK OFF LIST
REQUIREMENTS
I have reviewed this job assignment with my supervisor and have
been made aware of possible safety issues and proper procedures to
follow.
 Lockout/Tag Out
Do I know and understand the proper procedures to do the job?
 Ground fault protection
 500V insulated gloves
Do I have the right PPE and tools for the job I’ve been assigned?
Have I informed the affected personnel that I will be de-energizing
the panel, circuit, and/or equipment and have I relayed the
approximate time of the outage?
Is my work environment well lit?
Is my work area free of water, tripping hazards or any other
hazards?
If I have identified any safety hazards, have I contacted my
supervisor and/or other responsible parties in order to remedy the
situation?
If using extension cords or power tools, are the cords free from
damage (cracked, cut, or taped)?
Do I feel that I can do the job safely? Have I communicated this
with my supervisor? My alertness is not impaired by illness or
fatigue and I shall not reach blindly into areas containing live parts.
What is the operating voltage? What is the Incident Energy? What
are the boundaries? (480 volts, HRC 2 or Incident Energy 8 cal/cm2
Max!)
______________________________________________________
___________________________________________________
Are there internal safety mechanisms? i.e. Anything other than the
obvious devices like H.O.A. or disconnects, that could start or stop
this equipment?
After turning disconnecting means to the “OFF” position, have I
checked to see if the conductors are de-energized using the
appropriate tester? There may be more than on energy source in
this device.
During troubleshooting, if testing equipment in an energized state,
have I used the proper PPE equipment and tools for the job?
 5 KV gloves
15 KV gloves
 Protective sleeves
 Electrical hard hat
 Insulator boots
 Insulator mat
 Insulator blanket
 1000V rated insulated tools
 Arc rated Jacket
 Safety harness and tripod
 Force air machine
 Respirator
 Eye and face protection
 Long sleeved shirt
 Ear protection
 Caution tape or barriers
 Balaclava (Head Sock) or Arc Flash Hood
 Other _____________________________
GROUP 2, PART II: Energy Technician Flow Chart Does the task involve exposure to energized components with voltage greater than 50 volts? YES NO Does the task involve tes ng & amping electrical circuit? Has the authoriza on of HVAC supervisor been obtained? NO YES NO YES De‐energize the circuit Lock and Tag Out. STOP— DO NOT CONTINUE WORK. Consult with supervisor. 1. Has proper illumina on been verified? 2. Do you have the required Shock and Arc Flash PPE to complete the job safely? 3. Is the job site clear from all safety hazards (tripping, wet condi ons, are the approach distances confirmed? NO STOP— DO NOT CONTINUE WORK. Consult with supervisor. YES Proceed with authorized work. APPENDIX E
Qualified Workers – Group #4
STATIONARY ENGINEERS AND THEIR SUPERVISORS
The knowledge and skill of the authorized personnel in this group includes the ability to perform
Lockout/Tag-out on equipment to be maintained or regularly inspected. Routine maintenance
procedures in the Power Plant have Lockout/Tagout procedures in place.
Power Plant personnel are prohibited from operating by direct contact with equipment rated higher
than 500 volts. Control equipment which places personnel outside the limited approach boundary
rated at 120 volts or less used to control equipment rated 480 volts or higher is not considered to be
in this category.
The authorized work, trouble-shooting and testing level by persons in this group is not to exceed 500 volts
live or de-energized. Trouble-shooting and circuit testing are the only procedures that can be conducted on
live circuits above 50 volts. It is mandatory that 500 volt gloves with leather protectors (class 00), Arc Rated
face shields and clothing be worn by all personnel when testing and troubleshooting these live circuits. Arc
Rated jackets are considered to be in this category. Only after all circuits are verified de-energized, all stored
energy sources are released and the proper lockout/tag out procedure has been followed can repairs be made
without protective gear.
This group of qualified electrical workers is limited to 480 volts, and incident energy of 8 cal./cm2 where the
arc flash survey has been completed or NFPA 70E Hazard Risk Category 2 where the study has not been
completed. Where the arc flash study has not been completed, determine hazard risk category and
appropriate PPE by using the NFPA tables found in Appendices K and L.
APPENDIX F
Qualified Workers - Group # 5
ACPM Specialists, Maintenance Repair Workers, Plumbers, Steam Fitters, Welders,
Water Treatment Technicians, Pool Technicians, Maintenance Facility Workers,
Recreation Facility Workers, and their Supervisors.
The level of knowledge and skill of the qualified personnel in this group includes the ability to
troubleshoot, test and repair electrical circuits from the disconnecting means of the energized
load. These circuits will include wall receptacles, lighting circuits, ventilation and exhaust fan
motors and circulating pumps installed at Kent State University.
This level is not to exceed 240 volt equipment or 277 lighting circuits. No work may be
conducted until all circuits are verified de-energized, all stored energy sources released and the
proper lockout/tagout procedure has been followed.
This group of qualified electrical workers is limited to 240 volt equipment or 277 volt lighting circuits,
and incident energy of 8 cal./cm2 where the arc flash survey has been complete or NFPA 70E Hazard
Risk Category 2 where the study has not been completed. Where the arc flash study has not been
completed, determine hazard risk category and appropriate PPE by use the NFPA table found in
Appendices K and L.
Part I: Maintenance Electrical Work Permit Chart
Maintenance Electrical Work Permit Flow Chart Does the task involve exposure to energized components with voltage greater than 50 volts? YES NO Would there be an increased hazard if circuit is de‐energized? NO Does the task involve working on a failed non‐ligh ng electrical circuit? YES YES Has cause of failure been verified? De‐energize the circuit NO NO If the breaker tripped due to an overload, Has one a empt to reset breaker been made with no restora on of power? YES STOP— DO NOT CONTINUE WORK. Consult with supervisor. YES NO STOP— DO NOT CONTINUE WORK. Consult with supervisor. 1. Has proper illumina on been verified? 2. Do you know the Hazard Risk Category or the incident energy? 3. Do you have the required personal protec ve equipment to complete the job safely? 3. Is the job site clear from all safety hazards (tripping, wet condi ons are approach distances confirmed? NO STOP— DO NOT CONTINUE WORK. Consult with supervisor. YES Proceed with authorized work. Appendix G
Fleet Services Equipment Mechanics, Automotive Mechanics, Automotive Maintenance Crew Leader, Fleet
Services Superintendent
Qualified Person per NFPA 70 E (Definitions)
“One who has skills and knowledge related to the construction and operation of the electrical equipment
and installations and has received safety training on the hazards involved”
Kent State University Fleet Services personnel (listed above) are considered “qualified” to work on
systems not exceeding 480 volts AC, 480 volts primary DC, or 75,000 volt ignition systems, and
incident energies not to exceed 40 cal./cm2 or Hazard Risk Category 4. Each person listed above is
required to take regularly scheduled electrical safety courses provided by the university. Specialized
classroom and hands-on training is also provided to those persons.
Scope of duties include but are not limited to: mobile equipment, normal/hybrid/electric vehicles, lifts,
shop equipment, AC/DC generators/transfer switches and their associated equipment, battery banks,
chargers, UPS systems, inverters, fueling equipment, and all associated equipment sub-systems.
Testing/trouble-shooting Energized Circuits:
This operation may be performed using safe work practices and with appropriate PPE, in accordance to
this document.
Working on Energized Circuits:
No work shall be done without authorization of this group’s superintendent. Approved work will only
be done when it can be accomplished safely. Approved work may be performed when a minimum of
two qualified persons are present, using safe work practices, and appropriate PPE in accordance to this
document.
Sufficient protection in the form of insulated tools and insulated protective equipment such as: rubber
gloves with protectors, blankets, sleeves, mats, shields, line hose, line guards, insulator hoods, arc flash
equipment/clothing, and access boards shall be used while testing and/or trouble-shooting when working
on energized circuits.
Where the Kent State University Arc Flash Study has been completed the label is used to determine
boundary distances, shock hazard, and incident energy. From this appropriate PPE can be selected.
Where the study has not been completed, NFPA 70E tables and other sections have been used as the
standard for the safe work practices and levels of required PPE required by the Fleet Services personnel
listed above (see Part IV).
Part I
Fleet Services Safety procedure Checklist
Part II
Energized Work Permit Chart
Part III
Energized Work Permit
Part IV
Safe Work Practices
PART I - FLEET SERVICES SAFETY PROCEDURE CHECK-OFF LIST
EMPLOYEE:_________________________________________________
DATE: ____________
(Print Name)
WORK ORDER NUMBER: ____________________ JOB & LOCATION: _____________________________________
Y
E
S
N
O
ITEM TO CONSIDER
(Read each carefully)
PERSONAL PROTECTIVE
EQUIPMENT REQUIREMENTS
I have reviewed this job assignment, I am familiar with the equipment, I am
aware of possible safety issues, and the proper procedures to follow.
 Lockout/Tag Out supplies
Do I know and understand the proper procedures to do the job?
 Ground fault protection (GFCI)
Do I have the right PPE and tools for the job I’ve been assigned?
 500V insulated gloves
Have I informed the affected personnel that I will be working and/or performing
a lockout/tagout in the area and how it will affect them? (both before and after
the repair and/or lockout/tagout)
Is my work environment well lit, clear of tripping hazards, water or other
hazardous situations?
 1000V insulated gloves
If I have identified any safety hazards, have I contacted my supervisor and/or
other responsible parties in order to remedy the situation?
 Electrical hard hat
 Insulator boots
 1000V Protective sleeves
 Insulator mat
Do I feel that I can do the job safely? Is my alertness impaired by medicines,
illness, fatigue or other reasons? Have I communicated these issues with my
supervisor?
 Insulator blanket
I have inspected my hand and power tools, test equipment, cords, and PPE for
proper operation and condition. (cuts, abrasions, missing or broken items,
meter lead insulation cut, cords taped, cracks, etc.)
 Radio – 2 way
What are the operating voltages and clearance limits? ______________
 Safety harness and lanyard
During trouble-shooting, if testing equipment in an energized state, have I
used the proper PPE equipment and tools for the job? Am I following
procedures set forth in the UFM electrical safety procedures manual?
After de-energizing any equipment and performing lockout/tagout procedures
as set forth in the UFM Lockout/Tagout procedures manual, and before I start
my work, have I checked to see if all circuits/conductors or other sources of
stored energy are actually de-energized using the appropriate tester and or
method?
 Lighting
Expected Outcome:
 Jack stands & props
 1000V rated tools
 Gloves – leather, rubber, latex
 Respirator
 Eye and/ or face protection
 Long sleeved shirt
 Hearing protection
 Welding/ cutting PPE (burn permit?)
Action to be taken if outcome is not as expected:
 Fire Extinguisher
 Portable Eyewash Station
 Arc Flash Equipment & Clothing
Emergency Procedures:
 100% Cotton Clothing
 Other
Emergency Escape Routes:
____________________________
Quality Control
Has the unit been test driven/run?
Is equipment clean and any messes cleaned up?
Locks/ tags removed & equipment is back in its safe-normal condition?
All safety interlocks restored and operational?
Is genset now in the remote position?
Are all tools, PPE cleaned, and turned in or put away?
Has the Truck/Utiliity Vehicle been re-stocked?
Are lockout tags, permits, lists completed and attached to the work
order?
Lockout Tag Information Requirement
Identity of authorized person installing &
removing. Signature of person installing &
removing. Date and time installed and removed.
Type of energy locked & tagged out. Procedure for
verifying zero residual energy state. Statement on
tag saying “safe to return to service”.
Employee Signature: _____________________________________, Supervisor Signature: _______________________________________
This document must be completed on each project as required by University Facilities Management.
Revised 9-15-14
Part II Fleet Services Energized Electrical Work Permit Flow Chart Review Before Starting Electrical Work Flowchart Reviewed by ≥= 50 volts What is Voltage ≥ 50 volts Level? Are there Exposed Live Parts? YES YES or Replacing of connections or components?
< 50 volts Will the equipment be put in an electrically safe work condition? 
Disconnected 
Locked and tagged out 
Tested 
Grounded (if Applicable) YES NO The decision to de‐energize should include consideration of the capacity of the electrical source and any over current protection between the source and the worker. Disconnect whenever possible What type of work is to be performed? Any Physical Alterations Required? Such as Adding, Removing Verify procedures with Supt. Then Follow Lock out/Tag out Procedures Apply good safety and maintenance practices and protect the electrical systems and parts from mechanical damage NO Follow Arc Flash label or NFPA 70 Tables 130.7(C)(9) and 130.7(C)(10) where labels are not present. Follow Engineered Safe Work Practices handout for proper PPE Energized Electrical Work Permit Not Required NO Must be approved by Fleet Supt. Follow Arc Flash label or NFPA 70 Tables 130.7(C)(9) and 130.7(C)(10) where labels are not present. Follow Engineered Safe Work Practices handout for proper PPE Energized Electrical Work Permit Required
NO Is the equipment now in an electrically safe work condition? YES Test before Touch Identify the Hazards Follow All Safe Work Practices That Apply Revised 09/15/2014 Proceed to Work Safely Part III
FLEET SERVICES ENERGIZED ELECTRICAL WORK PERMIT
Part 1: TO BE COMPLETED BY THE REQUESTER:
Work Order Number:
1. Description of circuit/equipment
Job location:
2. Description of work to be done:
3. Justification of why the circuit/equipment cannot be de-energized or the work deferred until the next
scheduled outage:
Requester/Title
Requester’s Signature
Date
Part II: TO BE COMPLETED BY THE ELECTRICALLY QUALIFIED* PERSONS DOING THE
WORK:
1. Description of the Safe Work Practices to be employed [NFPA 70E, 110.8 (B)]:
2. Shock Hazard Analysis: Voltage Level Phase to Phase
Limited Approach Boundaries [NFPA 70E, Table
130.2 (c)]:
Flash Protection Boundary:
Restricted
Prohibited
3. Results of Hazard/Risk Analysis [NFPA 70E, 130.3]:
Assumed (100 KA or less) or Calculated (Circle one)
Hazard/Risk Category/Incident Energy
OR Calculated Flash Hazard at 18”
4. List personal protective equipment to be used to perform the assigned task [NFPA 70E, Table 130.7(C) (9)
(a)]:
Arc –rated jacket (Cal = _______)/Arc Flash hood / Face shield/head sock/ Electrical Hardhat/ Safety
glasses or goggles/Ear protection/ Arc rated rubber and leather gloves**
5. Means employed to restrict the access of unqualified persons from the work area [NFPA 70E, 110.8(A)
(2)]: (Circle restriction method(s) being used) Signs/ Barrier/Qualified Attendant
6. Evidence of completion of a Job Briefing including discussion of any job-related hazards [NFPA 70E,
Table 110.7(G)]:Electrical Safety Procedure Checklist
7. Do you agree the above described work can be done safely? YES / NO (Circle: If no return to requester)
Date
Electrically Qualified Persons*
Electrically Qualified Persons*
Date
Duration of Work: Beginning Date /Time
Ending Date/Time
Part III: SIGNATURES TO PERFORM ENERGIZED ELECTRICAL WORK AND WITNESS TO
WORK PERFORMED:
Fleet Services Superintendent or Manager
Date /Time Witnessed
* One who has skills and knowledge related to the construction and operation of the electrical equipment
and Installations and has received safety training on the hazards involved per NFPA 70E definition.
** 100% Cotton Uniforms and Leather shoes are standard issue to KSU Fleet Services and thus are not
listed in the selection of Personal Protection Equipment
Part IV
Fleet Services Safe Work Practices
3‐30‐11
A
1
2
3
4
5
6
Electrical Task to be Performed
B
C
Engineered Safe Work Practices
Arc Flash Hazard /Risk Category
General: Removing fuses 600v or less
General: Resetting Breakers that are tripped
120/208 Volts (Lighting circuits only)
277/480 Volts (Lighting circuits only)
Proper PPE required
Proper PPE required
Max allow reset is 1 with Proper PPE worn
Max allow reset is 1 with Proper PPE worn
If overload of circuit can be verified and corrected, breaker can be General: Resetting Breakers that are tripped (Non‐lighting circuits) reset with Proper PPE 120/208 or 277/480 v
If overload cannot be verified, fault must be cleared and corrected 7
before resetting the breaker using proper PPE
8 General: Testing or troubleshooting
Proper PPE required
General: Work performed where energized parts exposed (Live Work) for voltages not greater than 480 volts
9
10
11
12
13
14
ATS: Testing or troubleshooting ‐ Door closed
ATS: Testing, troubleshooting or imaging ‐ Door open
ATS: Observing the switching operation ‐ Door open
ATS: Performing work (bulb changes) ‐ Door closed
ATS: Performing work (components on inside of door‐ bulbs) ‐ Door 15 open
2
2
0
2
2
2
Alterations such as adding, removing, or replacement of connections or components require a Energized Electrical Work permit.
3
Proper PPE required
Proper PPE required
Superintendent Approval, Proper PPE required
Proper PPE required
0
2
3
1
Proper PPE required
2
1) Energized work permit required. 2) Proper PPE required. 3) Buddy System Required. 4) Superintendent/Supervisor Presence 16
Required. 17 ATS: Manually bypassing power source ‐ Door closed
Proper PPE required
18 ATS: Manually Isolating ATS ‐ Door closed
Proper PPE required
19 ATS: Manually Isolating ATS ‐ Door open
Proper PPE required, Buddy system required
20 ATS: Manually switching power source ‐ Door closed
Proper PPE required, load to be shed to minimum if possible
1) Superintendent Approval. 2) Buddy system required. 3) Proper PPE Required. 4) Normal & emergency powers sources to be ATS: Manually switching power source, Non‐Life Safety Emergency ‐ disconnected & locked out. 5) Generator start to be disabled. 6) Door open
Load side breaker to be disconnected & locked out. 7) Verification 21
of zero voltage state. 1) Superintendent Approval (if possible). 2) Buddy system required. 3) Proper PPE Required. 4) Load side breaker to be ATS: Manually switching power source, Life Safety Emergency ‐ opened & locked out/guarded. 5) Generator output breaker to be Door open
opened and locked out/guarded. 6) Perform Manual ATS switching. 7) Generator output breaker to be closed. 8) Load side 22
breaker to be closed.
ATS: Performing work ‐ Door open
23
Page 1 of 2
3
0
0
2
2
2
3
Part IV
Fleet Services Safe Work Practices
3‐30‐11
A
Electrical Task to be Performed
24
25
26 Battery Bank, 120v+: Testing or troubleshooting
27 Battery Bank, 120v+: Routine Maintenance (no work)
Battery Bank, 120v+: Work, repairs, replacement
28
29
30 UPS: Battery testing or troubleshooting
31 UPS: Battery routine maintainance
B
C
Engineered Safe Work Practices
Arc Flash Hazard /Risk Category
Proper PPE required
Proper PPE required, Buddy system required
1) Energized work permit required. 2) Proper PPE required. 3) Buddy System Required. Proper PPE required
Proper PPE required, Buddy system required
1) Energized work permit required. 2) Proper PPE required. 3) UPS: Battery work, repairs, replacement
32
Buddy System Required. 33 UPS: Manually bypassing UPS‐inverter
Proper PPE required
34 UPS: Inverter area testing or troubleshooting
Proper PPE required
1) Energized work permit required. 2) Proper PPE required. 3) UPS: Control Panel repairs, replacement (not in inverter area)
35
Buddy System Required. Not to be done while energized, Grounding clamps and 500v UPS: Inverter area routine maintainance, work, repairs, replacement
36
insulating gloves & protectors to be used due to capacitors
2
2
3 (see notes 1 & 2)
2 (see note 2)
2 (see note 2)
3 (see notes 1 & 2)
0
2
2
0
37
38
Battery Charger\Power Supply, 120v+: Testing or troubleshooting
Proper PPE required
1) Energized work permit required. 2) Proper PPE required. 3) Battery Charger\Power Supply, 120v+: Work, repairs, replacement Buddy System Required. 4) Superintendent/Supervisor Presence 39
Required. 2*
3
40
Electric, Electric Hybrid Vehicle 50v to 75v: Electrical system or 41 Battery testing or troubleshooting
Proper PPE required
Electric, Electric Hybrid Vehicle 50v to 75v: Electrical system work, Proper PPE required, Disconnect battery bank from electrical system via switch.
Electric, Electric Hybrid Vehicle 50v to 75v: Battery work, repairs, Proper PPE required, first step is to separate jars until connected 43 replacement
jar votage is < 50v
42 repairs, replacement
0 (see note 2)
0
0 (see note 2)
44
Electric, Electric Hybrid Vehicle Greater Than 75v: Electrical system 45 testing or troubleshooting
Proper PPE required
Electric, Electric Hybrid Vehicle Greater Than 75v: Electrical system Proper PPE required, Disconnect and lockout battery bank from electrical system via switch.
1) Energized work permit required. 2) Proper PPE required. 3) Electric, Electric Hybrid Vehicle Greater Than 75v: Battery work, Buddy System Required. 4) Separate jars until connected jar repairs, replacement
47
votage is < 50v if possible.
46 work, repairs, replacement
48
Note 1: HR 3 PPE must be utilized until connected jar voltage is 49 reduced to < 50 volts.
Note 2: Care must be exercised to not expose arc flash PPE to 50 battery acid
Page 2 of 2
2
0
3 (see notes 1 & 2)
Appendix H
Group # 7 – Other University Qualified Employees
A qualified employee is “One who has skills and knowledge related to the construction and operation of
the electrical equipment and installations and has received safety training on the hazards involved”.
This group of employees, described in Appendix A, is normally restricted to working on equipment in a
de-energized state. Therefore, their exposure to electrical hazards will only occur while de-energizing
and verifying a zero energy state. During this process, the employee must use proper lockout/tagout
procedures. This employee must use the information provided on the label where an arc flash survey has
been completed or determine the HRC found in Appendix K to select the appropriate PPE, Appendix L,
that must be worn where an Arc Flash label is not present.
On rare occasions, it might be necessary to troubleshoot laboratory equipment while the equipment is
energized. This should only be done as a last resort, and only done when the employee is “qualified”
through experience and training to recognize the electrical hazards while working on any piece of
equipment. When doing so, the employee must read and understand the labels where an arc flash survey
has been completed or determine the hazard risk category do that appropriate PPE can be selected.
In no case, shall this group of employees install or repair electrical equipment other than what is described
above. This group of employees is limited to no more than 240 volts and HRC 2/ 8 cal/cm2, and only
after that they received specific training and experience to conduct this category of electrical work safely.
APPENDIX I
Approach Boundaries to Energized Electrical Conductors or Circuit Parts for Shock
Protection (All dimensions are distance from energized electrical conductor or circuit part to
employee). Table 130.4(C)(a) of NFPA 70E – 2012 Edition
Limited Approach Boundaryb
(1)
Nominal System
Voltage Range, Phase
to Phasea
Less than 50
50 to 300
301 to 750
751 to 15 kV
15.1 kV to 36 kV
36.1 kV to 46 kV
46.1 kV to 72.5 kV
72.6 kV to 121 kV
138 kV to 145 kV
161 kV to 169 kV
230 kV to 242 kV
345 kV to 362 kV
500 kV to 550 kV
765 kV to 800 kV
(2)
Exposed Movable
Conductorc
(3)
Exposed Fixed Circuit
Part
(4)
Restricted Approach
Boundaryb; Includes
Inadvertent
Movement Adder
Not specified
3.0 m (10 ft 0 in.)
3.0 m (10 ft 0 in.)
3.0 m (10 ft 0 in.)
3.0 m (10 ft 0 in.)
3.0 m (10 ft 0 in. )
3.0 m (10 ft 0 in.)
3.3 m (10 ft 8 in.)
3.4 m (11 ft 0 in.)
3.6 m (11 ft 8 in.)
4.0 m (13 ft 0 in.)
4.7 m (15 ft 4 in.)
5.8 m (19 ft 0 in.)
7.2 m (23 ft 9 in.)
Not specified
1.0 m (3 ft 6 in.)
1.0 m (3 ft 6 in.)
1.5 m (5 ft 0 in.)
1.8 m (6 ft 0 in.)
2.5 m (8 ft 0 in.)
2.5 m (8 ft 0 in.)
2.5 m (8 ft 0 in.)
3.0 m (10 ft 0 in.)
3.6 m (11 ft 8 in.)
4.0 m (13 ft 0 in.)
4.7 m (15 ft 4 in.)
5.8 m (19 ft 0 in.)
7.2 m (23 ft 9 in.)
Not specified
Avoid contact
.3 m (1 ft 0 in.)
.7 m (2 ft 2 in.)
.8 m (2 ft 7 in.)
.8 m (2 ft 9 in.)
1.0 m (3 ft 3 in.)
1.0 m (3 ft 4 in.)
1.2 m (3 ft 10 in.)
1.3 m (4 ft 3 in.)
1.7 m (5 ft 8 in.)
2.8 m (9 ft 2 in.)
3.6 m (11 ft 10 in.)
4.9 m (15 ft 11 in.)
(5)
Prohibited Approach
Boundaryb
Not specified
Avoid contact
25 mm (0 ft 1 in.)
.2 m (0 ft 7 in.)
.3 m (0 ft 10 in.)
.4 m (1 ft 5 in.)
.6 m (2 ft 2 in.)
.8 m (2 ft 9 in.)
1.0 m (3 ft 4 in.)
1.1 m (3 ft 9 in.)
1.6 m (5 ft 2 in.)
2.6 m (8 ft 8 in.)
3.5 m (11 ft 4 in.)
4.7 m (15 ft 5 in.)
Note for Arc Flash Boundary see 130.5(A)
a
For Single Phase Systems, select the range that is equal to system’s maximum phase-to-ground voltage multiplied by 1.732
b
See definition in Article 100 and test in 130.4(D)(2) and Annex C for elaboration
c
This term describes a condition in which the distance between the conductor and the person is not under the control of the person. The term is normally applied to overhead line conductors supported by poles
Approach Boundariesa to Energized Electrical Conductors or Circuit Parts for Shock
Protection (All dimensions are distance from energized electrical conductor or circuit part to
employee). Table 130.4(C)(b) of NFPA 70E – 2012 Edition
Direct-Current Voltage Systems
Limited Approach Boundary
(1)
Nominal Potential
Difference
a
b
Less than 100
100 to 300
301 to 1 kV
1.1 kV to 5 kV
5 kV to 15 kV
15.1 kV to 45 kV
45.1 kV to 75 kV
75.1 kV to 150 kV
150.1 kV to 250 kV
250.1 kV to 500 kV
500.1 kV to 800 kV
(2)
Exposed Movable
Conductorb
(3)
Exposed Fixed Circuit
Part
(4)
Restricted Approach
Boundary1; Includes
Inadvertent
Movement Adder
Not specified
3.0 m (10 ft 0 in.)
3.0 m (10 ft 0 in.)
3.0 m (10 ft 0 in.)
3.0 m (10 ft 0 in.)
3.0 m (10 ft 0 in. )
3.0 m (10 ft 0 in.)
3.3 m (10 ft 8 in.)
3.6 m (11 ft 8 in.)
6.0 m (20 ft 0 in.)
8.0 m (26 ft 0 in.)
Not specified
1.0 m (3 ft 6 in.)
1.0 m (3 ft 6 in.)
1.5 m (5 ft 0 in.)
1.5 m (5 ft 0 in.)
2.5 m (8 ft 0 in.)
2.5 m (8 ft 0 in.)
3.0 m (10 ft 0 in.)
3.6 m (11 ft 8 in.)
6.0 m (20 ft 0 in.)
8.0 m (26 ft 0 in.)
Not specified
Avoid contact
0.3 m (1 ft 0 in.)
0.5 m (1 ft 5 in.)
0.7 m (2 ft 2 in.)
0.8 m (2 ft 9 in.)
1.0 m (3 ft 2 in.)
1.2 m (4 ft 0 in.)
1.6 m (5 ft 3 in.)
3.5 m (11 ft 6 in.)
5.0 m (16 ft 5 in.)
(5)
Prohibited Approach
Boundary1
Not specified
Avoid contact
25 mm (0 ft 1 in.)
0.1 m (0 ft 4 in.)
0.2 m (0 ft 7 in.)
0.4 m (1 ft 5 in.)
0.7 m (2 ft 1 in.)
1.0 m (3 ft 2 in.)
1.5 m (5 ft 0 in.)
3.3 m (10 ft 10 in.)
5.0 m (16 ft 5 in.)
All dimensions are distance from exposed energized electrical conductors or circuit parts to worker.
This term describes a condition in which the distance between the conductor and a person is not under the control of the person. The term is normally applied to overhead line conductors supported by poles.
Appendix J
Arc Flash Warning Label
LABEL COLOR CODE
DISTANCE FROM THE FAULT
A PERSON MAY BE
EXPOSED TO AN INCIDENT
ENERGY OF 1.2 CAL/CM^2
CALCULATED INCIDENT
ENERGY AT A GIVEN
DISTANCE 18”
AVAILABLE VOLTAGE
LEVEL OF THE
EQUIPMENT
EQUIPMENT NAME
APPROACH BOUNDARIES
ENGINEER
DATE OF ARC FLASH STUDY
One Line Diagram Page
Arc Flash Danger Label
For hazards with greater than 40cal/cm2 posted on warning label, no electrical
work or interaction with equipment will be permitted.
Hazard/Risk Category Classification Tables
ELECTRICAL SAFE WORK PRACTICE PROGRAM – 70E TABLES
TASK (Alternating Current)
(Assumes equipment is energized, and work is done within the flash protection boundary)
Panel boards or other equipment rated 240V and below – Note 1 – Potential arc flash boundary with
exposed energized conductors or circuit parts using above parameters: 19 in.
Perform infrared thermography and other non-contact inspections outside the restricted approach boundary
Circuit breaker (CB) or fused switch operation with covers on
CB or fused switch operation with covers off
Work on energized electrical conductors and circuit parts, including voltage testing
Remove/install CBs or fused switches
Removal of bolted covers (to expose bare, energized electrical conductors and circuit parts)
Opening hinged covers (to expose bare, energized electrical conductors and circuit parts)
Work on energized electrical conductors and circuit parts of utilization equipment fed directly by a branch
circuit of the panel board
Panel boards or Switchboards rated >240V and up to 600V (with molded case or insulated case circuit
breakers) Note 1 – Potential arc flash boundary with exposed energized conductors or circuit parts using
above parameters: 30 in.
Perform infrared thermography and other non-contact inspections outside the restricted approach boundary
Circuit breaker (CB) or fused switch operation with covers on
CB or fused switch operation with covers off
Work on energized electrical conductors and circuit parts, including voltage testing
Remove/install CBs or fused switches
Removal of bolted covers (to expose bare, energized electrical conductors and circuit parts)
Opening hinged covers (to expose bare, energized electrical conductors and circuit parts)
Work on energized electrical conductors and circuit parts of utilization equipment fed directly by a branch
circuit of the panel board.
600V class motor control centers (MCCs) – Note 2 (except as indicated) – Potential arc flash boundary
with exposed energized conductors or circuit parts using above parameters: 53 in.
Perform infrared thermography and other non-contact inspections outside the restricted approach boundary
CB or fused switch or starter operation with enclosure doors closed
Reading a panel meter while operating a meter switch
CB or fused switch or starter operation with enclosure doors open
Work on energized electrical conductors and circuit parts, including voltage testing
Work on control circuits with energized electrical conductors and circuit parts 120V or below, exposed
Work on control circuits with energized electrical conductors and circuit parts >120V, exposed
Application of temporary protective grounding equipment, after voltage test
Work on energized electrical conductors and circuit parts of utilization equipment fed directly by a branch
circuit of the motor control center
600V class motor control centers (MCCs) – Potential arc flash boundary with exposed energized
conductors or circuit parts using above parameters: 165 in.
Insertion or removal of individual starter “buckets” from MCC
Removal of bolted covers (to expose bare, energized electrical conductors and circuit parts)
Opening hinged covers (to expose bare, energized electrical conductors and circuit parts)
600V class switchgear (with power circuit breakers or fused switches) and 600 V class switchboards –
Potential arc flash boundary with exposed energized conductors or circuit parts using above parameters:
233 in.
Perform infrared thermography and other non-contact inspections outside the restricted approach boundary
CB or fused switch operation with enclosure doors closed
Reading a panel meter while operating a meter switch
CB or fused switch operation with enclosure doors open
Work on energized electrical conductors and circuit parts, including voltage testing
Work on control circuits with energized electrical conductors and circuit parts 120V or below, exposed
Work on control circuits with energized electrical conductors and circuit parts >120V, exposed
Insertion or removal (racking) of CBs from cubicle, doors open or closed
Application of temporary protective grounding equipment after voltage test
Removal of bolted covers (to expose bare, energized electrical conductors and circuit parts)
Opening hinged covers (to expose bare, energized electrical and circuit parts
Other 600V class (277V through 600V, nominal) equipment – Potential arc flash boundary with exposed
energized conductors or circuit parts using above parameters: 53 in.
1|P a g e
Hazard/
Risk
Category
Rubber
Insulating
Gloves
Insulated and
Insulating
Hand Tools
0
0
0
1
1
1
0
N
N
N
Y
Y
N
N
N
N
N
Y
Y
N
N
1
Y
Y
1
0
1
2
2
1
0
N
N
Y
Y
Y
N
N
N
N
N
Y
Y
N
N
2
Y
Y
1
0
0
1
2
0
2
2
N
N
N
N
Y
Y
Y
Y
N
N
N
N
Y
Y
Y
N
2
Y
Y
4
4
1
Y
N
N
N
N
N
2
0
0
1
2
0
2
4
2
4
2
N
N
N
N
Y
Y
Y
N
Y
N
N
N
N
N
N
Y
Y
Y
N
N
N
N
Hazard/Risk Category Classification Tables
ELECTRICAL SAFE WORK PRACTICE PROGRAM – 70E TABLES
TASK (Alternating Current)
(Assumes equipment is energized, and work is done within the flash protection boundary)
Lighting or small power transformers (600V, maximum)
Removal of bolted covers (to expose bare, energized electrical conductors and circuit parts)
Opening hinged covers (to expose bare, energized electrical conductors and circuit parts
Work on energized electrical conductors and circuit parts, including voltage testing
Application of temporary protective grounding , after voltage testing
Revenue meters (kW-hour, at primary voltage and current) insertion or removal
Cable trough or tray cover removal or installation
Miscellaneous equipment cover removal or installation
Work on energized electrical conductors and circuit parts, including voltage testing
Application of temporary protective grounding equipment, after voltage test
Insertion or removal of plug-in devices into or from busways
NMEA E2 (fused contactor) Motor Starters, 2.3 kV through 7.2 kV – Potential arc flash boundary with
exposed energized conductors or circuit parts using above parameters: 422 in.
Perform infrared thermography and other non-contact inspections outside the restricted approach boundary
Contactor operation with enclosure doors closed
Reading a panel meter while operating a meter switch
Contactor operation with enclosure doors open
Work on energized electrical conductors and circuits parts, including voltage testing
Work on control circuits with energized electrical conductors and circuit parts 120V or below, exposed
Work on control circuits with energized electrical conductors and circuit parts >120V, exposed
Insertion or removal (racking) of starters from cubicles, doors open or closed
Application of temporary protective grounding equipment, after voltage test
Removal of bolted covers (to expose bare, energized electrical conductors and circuit parts)
Opening hinged covers (to expose bare, energized electrical conductors and circuit parts)
Insertion or removal (racking) of starters from cubicles of arc-resistant construction, tested in accordance
with IEEE C37.20.7, doors closed only
Metal Clad Switchgear, 1 kV through 38 kV - Potential arc flash boundary with exposed energized
conductors or circuit parts using above parameters: 422 in.
Perform infrared thermography and other non-contact inspections outside the restricted approach boundary
CB operation with enclosure doors closed
Reading a panel meter while operating a meter switch
CB operation with enclosure doors open
Work on energized electrical conductors and circuits parts, including voltage testing
Work on control circuits with energized electrical conductors and circuit parts 120V or below, exposed
Work on control circuits with energized electrical conductors and circuit parts >120V, exposed
Insertion or removal (racking) of CBs from cubicles, doors open or closed
Application of safety grounds, after voltage test
Removal of bolted covers (to expose bare, energized electrical conductors and circuit parts)
Opening hinged covers (to expose bare, energized electrical conductors and circuit parts)
Opening voltage transformer or control power transformer compartments
Arc-Resistant Switchgear Type 1 or 2 (for clearing times of <0.5 sec with a perspective fault current not
to exceed the arc-resistant rating of the equipment) - Potential arc flash boundary with exposed
energized conductors or circuit parts using above parameters: 422 in.
CB operation with enclosure door closed
Insertion or removal (racking) of CBs from cubicles, door closed
Insertion or removal of CBs from cubicles, door open
Work on control circuits with energized electrical conductors and circuit parts 120V or below, exposed
Insertion or removal (racking) of ground and test device with door closed
Insertion or removal (racking) of voltage transformers on or off the bus door closed
Other Equipment 1 kV through 38 kV - Potential arc flash boundary with exposed energized conductors
or circuit parts using above parameters: 422 in.
Metal-enclosed interrupter switchgear, fused or unfused
Switch operation of arc-resistant-type construction, tested in accordance with IEEE C37.20.7, doors
closed only
Switch operation, doors closed
Work on energized electrical conductors and circuit parts, including voltage testing
2|P a g e
Hazard/
Risk
Category
Rubber
Insulating
Gloves
Insulated and
Insulating
Hand Tools
2
1
2
2
2
1
1
2
2
2
N
N
Y
Y
Y
N
N
Y
Y
Y
N
N
Y
N
N
N
N
Y
N
N
3
0
0
2
4
0
3
4
3
4
3
N
N
N
N
Y
Y
Y
N
Y
N
N
N
N
N
N
Y
Y
Y
N
N
N
N
0
N
N
3
2
0
4
4
2
4
4
4
4
3
4
N
N
N
N
Y
Y
Y
N
Y
N
N
N
N
N
N
N
Y
Y
Y
N
N
N
N
N
0
0
4
2
0
0
N
N
N
Y
N
N
N
N
N
Y
N
N
0
N
N
2
4
N
Y
N
Y
Hazard/Risk Category Classification Tables
ELECTRICAL SAFE WORK PRACTICE PROGRAM – 70E TABLES
TASK (Alternating Current)
(Assumes equipment is energized, and work is done within the flash protection boundary)
Removal of bolted covers (to expose bare, energized electrical conductors and circuit parts)
Opening hinged covers (to expose bare, energized electrical conductors and circuit parts)
Outdoor disconnect switch operation (hookstick operated)
Outdoor disconnect switch operation (gang-operated, from grade)
Insulated cable examination, in manhole or other confined space
Insulated cable examination, in open area
Y=Yes (required). N: No (not required)
Hazard/
Risk
Category
Rubber
Insulating
Gloves
Insulated and
Insulating
Hand Tools
4
3
3
2
4
2
N
N
Y
Y
Y
Y
N
N
Y
N
N
N
Notes:
1)
2)
3)
4)
5)
6)
Rubber insulating gloves are gloves rated for the maximum line-to-line voltage upon which work will be done.
Insulated and insulating hand tools are tools rated and tested for the maximum line-to-line voltage upon which work will be done, and
are manufactured and tested in accordance with ASTM F 1505, Standard Specifications for Insulated and Insulating Hand Tools.
The use of “N” does not indicate that rubber insulating gloves and insulated and insulating hand tools are not required in all cases.
Rubber insulating gloves and insulated and insulating hand tools may be required by 130.4, 130.8 (C) (7), and 130.8 (D).
For equipment protected by upstream current limiting fuses with arcing fault current in their current limiting range (1/2 cycle fault
clearing time or less), the Hazard/Risk Category required may be reduced by one number.
For power systems up to 600 V the arc flash boundary was determined by using the following information: When 0.03 second trip
time was used, that indicated MCC or panelboard equipment protected by a molded-case circuit breaker. Working distance used was
18 in. (455 mm). arc gap used was 32 mm for switchgear and 25 mm for MCC and protective device type 0 for all. When 0.33 or 0.5
second trip time was used, that indicated a LVPCB (drawout circuit breaker) in switchgear. Working distance was 24 in. (610 mm).
Arc gap used was 32 mm and protective device type 0 for all. All numbers were rounded up or down depending on closest multiple of
5.
For power systems from 1kV to 38 kV the arc flash boundary was determined by using the following information: No maximum
values were given in the 2009 edition of NFPA 70E for short-circuit current or operating time. Two sets of equations were performed:
35kA AIC and 0.2 second operating time and 26 kA AIC and 0.2 second operating time. 0.2 seconds was used by adding the typical
maximum total clearing time of the circuit breaker to an estimated value for relay operation. This coincides with the IEEE 1584
values of 0.18 second operating time and 0.08 tripping time rounded off. A short-circuit current of 35 kA was used as a maximum
(HRC-4 @ ~ 40 cal/cm2). Working distance used was 36 in. (909 mm), arc gap was 6 in. (455 mm), and protective device type 0 for
all.
Specific Notes (as referenced in the table):
1.
2.
3.
4.
Maximum of 25 kA short circuit current available; maximum of 0.03 sec (2 cycle) fault clearing time; minimum 18 in. working
distance.
Maximum of 65 kA short circuit current available; maximum of 0.03 sec (2 cycle) fault clearing time; minimum 18 in. working
distance.
Maximum of 42 kA short circuit current available; maximum of 0.33 sec. (20 cycle) fault clearing time; minimum 18 in. working
distance.
Maximum of 35 kA short circuit current available; maximum of up to 0.5 sec. (30 cycle) fault clearing time; minimum 18 in. working
distance.
3|P a g e
Hazard/Risk Category Classification Tables
ELECTRICAL SAFE WORK PRACTICE PROGRAM – 70E TABLES
TASKS (Direct Current)
(Assumes equipment is energized, and work is done within the flash protection boundary)
Storage batteries, direct-current switchboards and other direct-current supply sources >100 V <250V
Parameters:
Voltage: 250V
Maximum arc duration and working
distance: 2 sec @ 18in.
Work on energized electrical conductors and circuit parts, including voltage testing where arcing current is >1
kA and <4 kA
Potential arc flash boundary using above parameters at 4 kA: 36 in.
Work on energized electrical conductors and circuit parts, including voltage testing where arcing current is >4
kA and <7 kA
Potential arc flash boundary using above parameters at 7 kA: 48 in.
Work on energized electrical conductors and circuit parts, including voltage testing where arcing current is >7
kA and <15 kA
Potential arc flash boundary using above parameters at 15 kA: 72 in.
Storage batteries, direct-current switchboards and other direct-current supply sources >250 V <600V
Parameters:
Voltage: 600V
Maximum arc duration and working
distance: 2sec @ 18in.
Work on energized electrical conductors and circuit parts, including voltage testing where arcing current is >1
kA and <1.5 kA
Potential arc flash boundary using above parameters at 1.5 kA: 36 in.
Work on energized electrical conductors and circuit parts, including voltage testing where arcing current is
>1.5 kA and <3 kA
Potential arc flash boundary using above parameters at 3kA: 48 in.
Work on energized electrical conductors and circuit parts, including voltage testing where arcing current is >3
kA and <7 kA
Potential arc flash boundary using above parameters at 7kA: 72 in.
Work on energized electrical conductors and circuit parts, including voltage testing where arcing current is >7
kA and <10 kA
Potential arc flash boundary using above parameters at 10 kA: 96 in.
Hazard/Risk
Categorya
Rubber
Insulating
Glovesb
Insulated and
Insulating
Hand Tools
1
Y
Y
2
Y
Y
3
Y
Y
1
Y
Y
2
Y
Y
3
Y
Y
4
Y
Y
Y: Yes (required)
a
If acid exposure is possible, the clothing is required to be protected from acid and arc rated to the hazard according to ASTM F 1891 or
equivalent and evaluated by ASTM F 1296 for acid protection.
b
In clean rooms or other electrical installations, that do not permit leather protectors for arc flash exposure, ASTM F-496 is required to be
followed for use of rubber insulating gloves without leather protectors, and the rubber gloves chosen are required to be arc rated to the potential
exposure level of the hazard/risk category.
4|P a g e
Hazard/Risk Category Classification Tables
ELECTRICAL SAFE WORK PRACTICE PROGRAM – 70E TABLES
Protective Clothing and Personal Protective Equipment (PPE)
Hazard/Risk
Category
0
Clothing Description
(Typical number of clothing layers is given in parentheses)
Protective Clothing Non-melting or untreated natural fiber (i.e., untreated cotton,
wool, rayon, or silk, or blends of these materials) with a Fabric Weight of at Least
4.5 oz/yd2 .
PPE
Protective Equipment
Safety glasses or safety goggles (SR)
Shirt (long sleeve)
Hearing protection (ear canal inserts)
Pants (long)
Heavy duty leather gloves (AN) (See Note 1)
Arc-Rating Clothing, Minimum Arc Rating of 4 cal/cm 2 (See Note 3)
Arc-rated long-sleeve shirt and pants or arc-rated coverall (Note: 8 cal/cm 2
coverall provided by KSU will meet this requirement)
Protective Equipment
Hard hat
Safety glasses or safety goggles (SR)
Arc-rated face shield (see Note 2) or arc flash suit hood
1
Hearing protection (ear canal inserts)
Arc-rated jacket, parka, rainwear, or hard hat liner (AN)
Heavy duty leather gloves (See Note 1)
Leather work shoes (AN)
Arc-Rated Clothing, Minimum Arc Rating of 8 cal/cm 2 (See Note 3)
Arc-rated long-sleeve shirt and pants or arc-rated coverall (Note: 8 cal/cm 2
coverall provided by KSU will meet this requirement)
Protective Equipment
Hard hat
Safety glasses or safety goggles (SR)
2
Arc-rated flash suit hood or arc-rated face shield (See Note 2) and arc-rated
balaclava
Hearing protection (ear canal inserts)
Arc-rated jacket, parka, rainwear, or hard hat liner (AN)
Heavy duty leather gloves (See Note 1)
Leather work shoes
Arc-Rated Clothing Selected so That the System Arc Rating Meets the Required
Minimum Arc Rating of 25 cal/cm2 (See Note 3)
Arc-rated long-sleeve shirt (AR), Arc-rated pants (AR), Arc-rated coverall (AR),
Arc-rated arc flash suit jacket (AR), Arc-rated arc flash suit pants (AR) (Note: 40
cal/cm 2 suit provided by KSU will meet this requirement)
3
Arc-rated arc flash suit hood
Protective Equipment
Hard Hat
Safety glasses or safety goggles (SR)
Hearing protection (ear canal inserts)
Leather work shoes
Arc-rated gloves (See Note 1)
Arc-rated jacket, parka, rainwear, or hard hat liner (AN)
Arc-Rated Clothing Selected so That the System Arc Rating Meets the Required
Minimum Arc Rating of 40 cal/cm 2 (See Note 3)
Arc-rated long sleeve shirt (AR), Arc-rated pants (AR), Arc-rated coverall (AR),
Arc-rated arc flash suit jacket (AR), Arc-rated arc flash suit pants (AR) (Note: 40
cal/cm 2 suit provided by KSU will meet this requirement)
4
Arc-rated arc flash suit hood
Arc-rated gloves (See Note 1)
Arc-rated jacket, parka, rainwear, or hard hat liner (AN)
AN = As Needed (optional)
AR = As required
SR = Selection required
5|P a g e
Protective Equipment
Hard Hat
Safety glasses or safety goggles (SR)
Hearing protection (ear canal inserts)
Leather work shoes
Hazard/Risk Category Classification Tables
ELECTRICAL SAFE WORK PRACTICE PROGRAM – 70E TABLES
NOTES:
1)
2)
3)
If rubber insulating gloves with leather protectors are required by Table 130.7(C)(9), additional leather or arc-rated gloves are not
required. The combination of rubber insulating gloves with leather protectors satisfies the arc flash protection requirement.
Face shields are to have wrap-around guarding to protect not only the face but also the forehead, ears, and neck, or, alternatively, an
arc-rated arc flash suit hood is required to be worn.
Arc rating is defined in Article 100 and can be either the arc thermal performance value (ATPV) or energy of break open threshold
(Ebt), ATPV is defined in ASTM F 1959, Standard Test Method for Determining the Arc Thermal Performance Value of Materials for
Clothing, as the incident energy on a material, or a multilayer system of materials, that results in a 50 percent probability that
sufficient heat transfer through the tested specimen is predicted to cause the onset of a second-degree skin burn injury based on the
Stoll curve, in cal/cm2. Ebt is defined in ASTM F 1959 as the incident energy on a material or material system that results in a 50
percent probability of breakopen. Arc rating is reported as either ATPV or EBT, whichever is the lower value.
6|P a g e