Download Test Tube Activities at Ohio State (7/29/03)

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Ground loop (electricity) wikipedia , lookup

Mains electricity wikipedia , lookup

Loading coil wikipedia , lookup

Electrical connector wikipedia , lookup

Heterodyne wikipedia , lookup

Telecommunications engineering wikipedia , lookup

Tetrode wikipedia , lookup

Opto-isolator wikipedia , lookup

Transcript
Test Tube Activities at Ohio State (8/5/03)
•
Two (very useful) sub-group meetings after last weekly meeting
– Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus) -> see Mark’s report
– Electronics (Angelo, Klaus)
•
•
•
•
•
OSU designes HV board, Distribution board (both inside AL box)
Angelo will bring 6 (8 if possible) input protection circuits for anode signals
Angelo will modify one FE board to receive (negative) anode signals
Two (fine pitch) signal cables from AL box to “mini crate”
75 ft of Amphenol/Spectra Strip received
– With green (round) jacket, shielding
– 20 pairs
– Sent to SLAC (Charlie)
•
Kerpen HV cable is still not available.
– SLAC (PCK) will try to obtain enough RPC HV cable for 8 HV lines from electronic
hut to BaBar. Need to design HV transition box (8 short HV cables will be
attached (soldered) to HV distribution PC board in AL box. Connect to long HV
cables outside of magnet)
HV Distribution Board
•
•
•
•
HV capacitors Cable Connector Anode signal readout
Layout complete, 1 board for both tubes, Flat cable connector in hand
Will be tested with OSU tubes
Send to Princeton (or SLAC if too late)
Signal Distribution Board
•
•
•
•
Allow for: baseline (single ended), pseudo-differental, and fully differential
configuration
Layout (almost) complete
Receive cathode signals (16) via short twisted pair stub cables
16 ch. Output (fine pitch twisted flat cable)
What will we need?
•
•
•
•
•
8 HV channels with current monitoring, overcurrent trip
HV cables, HV connector box
Low voltage: +/-5 V, 300 mA in AL box
Low voltage: +/-5 V near mini crate (FE board, diff. Receiver)
Install signal cables (on their way to Charlie) -> Need to identify the
location of a suitable FEC crate!
– This defines the location of the infrastructure connections in the AL box
– Need this today!
– Note: Anode and Phi signals, HV, low voltage and gas (in+out) will be all on the
same side. The tubes will be shifted toward the other end of the AL box to make
sufficient room for the infrastructure stuff.
•
Coax cables from detector (mini crate location) to outside the shielding wall
so that we can view signals with beams on