Download PACE Discovery Drilling 2015: Project Proposal Form

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts
Transcript
PACE
Discovery Drilling Program 2016
Project Proposal Form
PART A – Applicant(s) Details
Project Proponent **
Name of Company or Individual
Contact Address of Project Proponent
Project Proponent
ABN / ACN
Project Proponent Registered for GST?
Registered Office of Project Proponent
Yes / No
(If different from contact address above)
Applicant is the/a Tenement Holder?
Yes / No
If not a tenement holder, please state the nature of the
relationship between the applicant and tenement holder.
PART B – Location and Timing
Proposed Drilling Program
Please attach a location
plan of the tenement(s)
relevant to this project
proposal.
Project Name
Exploration Licence Number(s)
Exploration Licence Holder 1
% Share
%
Exploration Licence Holder 2
% Share
%
Exploration Licence Operator
Proposed Program Start
Estimated Program Duration
PACE – Discovery Drilling 2016 – Project Proposal – March v_Final
1
PART C – Summary Drilling Program
Proposed Drilling Program
Please attach:
Number of Holes
A table of drill hole
locations including:
Estimated Metres to be Drilled

Hole_ID;

Drilling Method(s)
Easting & Northing;

Elevation (m);
Estimated Direct Drilling Costs

Total Hole Depth (m);
and,
Direct Drilling Costs (metres, mobilisation,
consumables, water).

Geodetic Datum and
Projection.
Estimated Assay Budget
Including Geochemistry, Petrology, Water Sampling
Estimated Downhole Geophysical Budget
Wireline logs, Temperature measurements
Estimated Aboriginal Heritage Clearance
Survey Costs
Total Program Cost
Total Government Funding Sought
50% of program cost to a maximum of $250,000.
PART D – Project Rationale
Summary Project Description
Maximum 500 word summary of project aim, targets and results / data to be delivered from the project.
PACE – Discovery Drilling 2016 – Project Proposal – March v_Final
2
Exploration Model and Geological Context
Please provide a review of the regional and local geological context and the exploration model being applied
to the area.
Where appropriate, please attach additional maps / diagrams that would help to provide further information
include:

Regional geological setting, predictive cross sections and exploration models;

geophysical coverage and models;

geochemistry grids; and,

3D modelling.
Criteria Assessed:

Discussion of
regional and local
geological context;

Discussion of
deposit style /
mineral system;

Clear and
sufficient scientific
evidence and
reasoning for
targeting this
area/region; and,

Appropriate plans,
diagrams and
sections.
Previous Work
Please provide a review of the results of any previous work (e.g. historic and recent geophysics,
geochemistry or drilling) on the tenement(s) with particular reference to the results used to define the drill
target.
Where appropriate, please attach additional maps / diagrams that would help to provide further information
including:

Historic and recent drilling; and,
PACE – Discovery Drilling 2016 – Project Proposal – March v_Final
3

Historic and recent geophysical or geochemical surveys and modelling.
Criteria Assessed:

Sufficient
discussion and
assessment of
previous
exploration data
and results.
Proposed Drilling Program
Discuss the specific location, targeting rationale and drilling program details including expected drilling
depths and predictive geology.
Where appropriate, please attach additional maps / diagrams that would help to provide further information
including:

Collar locations and predicted geological cross-sections; and,

Exploration targets and models.
Criteria Assessed:

Clear and
sufficient scientific
reasoning for
proposed drilling
program;

Discussion of
targeting rationale
including:
o drilling method;
o collar location;
o drilling depths
o drilling plan /
pattern
o predicted
geology

Appropriate plans,
diagrams and
sections
Program Objectives and Results
Discuss the specific geoscientific objectives to be tested, impact of the program and the data / results to be
presented as part of the final report. Include information on any proposed sampling and geochemical
analyses, petrological work, water sampling and down hole logging.
Note: All OUTPUTS will be required in the format given by the DSD Mineral Exploration Reporting Guidelines
(including the requirements for submission of digital data).
Criteria Assessed:

Range and
appropriateness of
collected data and
analyses; and,

In-fills knowledge
gaps in geological
information.
Environmental Management Plan
Summarise the environmental management program that will be implemented during / post drilling including
PACE – Discovery Drilling 2016 – Project Proposal – March v_Final
4
discussions of site management, rehabilitation and timing. If a PEPR has already been completed for this
program, this section can be addressed by attaching a copy.
Project Risk Management
List the potential risks (e.g. drilling logistics/safety, rig availability, site access, tenement approvals, timing,
personnel, environmental incidents) and record consequence and proposed management of each.
Risk
Potential Consequence and Management
Data Confidentiality
Will a Period of Confidentiality be required for Drilling Results and Proposal Contents?
If yes, what length will this period be?
A maximum allowance of 3 months is available commencing after final report submission.
Yes / No
PART E – Stakeholder Engagement
Stakeholder Engagement Plan
Summarise the steps in gaining access to the project area, both previous work and future work.
Detail progress of access requirements listed below and comment on how stakeholders will be kept informed
of the programs progress and their concerns managed throughout the program.
Stakeholder
Current Status
Future programme and management
Native Title
Groups/Traditional
Owners
e.g. ILUA, native title
mining agreement under
Part 9B of the Mining Act
1971, Aboriginal heritage
clearance survey,
applications under the
Aboriginal Heritage Act
1988.
Landowner
e.g. Form 21 – Notice of
Entry; Form 22 –
Declared Equipment.
PACE – Discovery Drilling 2016 – Project Proposal – March v_Final
5
DSD
e.g. PEPR / EWA / DEF.
Commonwealth
e.g. Deed of Access /
Exploration.
Further Comments
PACE – Discovery Drilling 2016 – Project Proposal – March v_Final
6
PART F – Contact Details
Proponent Contact Details for Correspondence
Please include a postal and street office address, contact name, title, phone and fax number and email
address.
I fully understand and accept the terms and conditions as outlined in APPENDIX 1: Legal
Parameters Of Proposals and APPENDIX 2: Conditions Of Acceptance For
Successful Applicants within the PACE Discovery Drilling 2016 Guidelines for submission
of mineral drilling proposals (March 2016).
Signature of Proponent
DATE:
DSD Use Only
DATE RECEIVED
RECEIVED BY
DATED CONFIRMATION OF RECEIPT BY PROGRAM COORDINATOR
PROPOSAL NO.
PACE – Discovery Drilling 2016 – Project Proposal – March v_Final
7
PACE – Discovery Drilling 2016 – Project Proposal – March v_Final
8